Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 31, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mississippi and Minnesota River Mechanical Dredging

Awarded
W912ES19B0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation W912ES19B0002 is an Invitation For Bid issued by the Department of Defense through the U.S. Army Corps of Engineers Saint Paul District Office for mechanical dredging work on the Mississippi and Minnesota Rivers. The project requires the contractor to provide all necessary plant, labor, material, and equipment to perform dredging using a backhoe, dragline, or other mechanical equipment on marine plants, including the transportation of dredged material to designated placement sites. This procurement is categorized under NAICS code 237990 and is 100 percent set aside for small business concerns with a size standard of 27.5 million dollars. The resulting agreement is an Indefinite Delivery Indefinite Quantity contract consisting of a base period and four subsequent option periods. Bidders are required to submit pricing and bond information via the standard offer form, with submissions accepted only through certified mail or hand-delivery to the specified bid depository in Saint Paul, Minnesota. The solicitation process was managed by the Saint Paul District Office to ensure the necessary construction, alteration, or repair work for river maintenance is completed.

General Info

Contract Value

$0

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MN, USA

Set-Aside

NONE

Award Issued Date

Documents

2

Bid Depository and Bid Opening Information

PDF, High priority: read this firstspecial-notice
High

Solicitation W912ES19B0002 - Mechanical Dredging

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Type Changed

Combined Synopsis → Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts1 person available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA
Contacts
Bryson R. RossolContract Specialist

Full Description

Show more
Amendment 2 Bid Inquiry #7951285 The parameters will vary from situation to situation and the contracting officer will exercise discretion as necessary to determine what is in the best interest of the Government. Bid Inquiry #7951286 The contractor shall proceed to the project site from their current location within 7 days of receipt of task order. Bid Inquiry #7951287 The contractor is free to take on work between task orders but must be available for the season if not placed on standby within 7 days of receipt of a task order. It is unknown how many days for each contract period the contractor can expect to obligate a dredge plant without being compensated Standby. Bid Inquiry #7951288 See Section 35 20 23 DREDGING, Paragraph 3.5 PROJECT DEPTH, OVERDEPTH, SIDE SLOPES AND INFILL. All material left in the dredge cut, whether infill or unremoved material, will not be included in the total payment quantity. SECTION 01 22 00.00 13 MEASUREMENT AND PAYMENT, Changed PARAGRAPH 1.6.2 Measurement From: Dredging shall be measured and paid for by the cubic yard (CY) of material removed above the project depth within the allowable tolerance specified below and within the limits of the dredge site as identified in the Task Order. In order to allow for the inaccuracies of the dredging process, the Contractor will be allowed a tolerance of 0.5 feet above project depth in isolated scattered areas providing the total area of under excavated portions does not exceed 10 percent of the total area to be dredged and providing the average depth throughout the dredge site is equal to or greater than the specified project depth in the Task Order. This tolerance will only apply to 11 to 14 foot project depth sites. Dredging locations for all other project depths will be clear swept to the identified project depth. To: Dredging shall be measured and paid for by the cubic yard (CY) of material removed above the project depth within the allowable tolerance specified below and within the limits of the dredge site as identified in the Task Order. In order to allow for the inaccuracies of the dredging process, the Contractor will be allowed a tolerance of 0.5 feet above project depth in isolated scattered areas providing the total area of under excavated portions does not exceed 10 percent of the total area to be dredged and providing the average depth throughout the dredge site is equal to or greater than the specified project depth in the Task Order. This tolerance will only apply to 11 to 14 foot project depth sites. Dredging locations for all other project depths will be clear swept to the identified project depth. For additional measurement information see Section 35 20 23 DREDGING, Paragraph 3.5 PROJECT DEPTH, OVERDEPTH, SIDE SLOPES, AND INFILL. SECTION 01 22 00.00 13 MEASUREMENT AND PAYMENT, Changed PARAGRAPH 1.14.2 Measurement From: Dredging/excavation at temporary placement sites shall be measured and paid for by the cubic yard (CY) of material removed above the project depth within the limits of the dredge site shown. All work items not specified to be measured under the remaining payment items will be considered incidental to the dredging or excavation item associated with the material. To: Dredging/excavation at temporary placement sites shall be measured and paid for by the cubic yard (CY) of material removed above the project depth within the limits of the dredge site shown. All work items not specified to be measured under the remaining payment items will be considered incidental to the dredging or excavation item associated with the material. For additional measurement information see Section 35 20 23 DREDGING, Paragraph 3.5 PROJECT DEPTH, OVERDEPTH, SIDE SLOPES, AND INFILL. SECTION 01 22 00.00 13 MEASUREMENT AND PAYMENT, Changed PARAGRAPH 1.15.2 Measurement From: Small Boat Harbor Dredging shall be measured and paid for by the cubic yard (CY) of material removed above the project depth within the limits of the dredge site shown, and clear swept to the identified project depth. To: Small Boat Harbor Dredging shall be measured and paid for by the cubic yard(CY) of material removed above the project depth within the limits of the dredge site shown, and clear swept to the identified project depth. For additional measurement information see Section 35 20 23 DREDGING, Paragraph 3.5 PROJECT DEPTH, OVERDEPTH, SIDE SLOPES, AND INFILL. Bid Inquiry #7951289 Reference bidder inquiry 7951289 SECTION 01 00 00.00 13 GENERAL Changed paragraph 1.2 SCOPE From: Furnish, deliver and operate dredge and attendant plant for maintenance dredging between Upper Mississippi River Miles 614.0 and 857.6 and between Minnesota River Miles 0.0 and 14.7, between St. Croix River Miles 0.0 and 24.5, between Black River Miles 0.0 and 1.4 in the St. Paul District and between Upper Mississippi River Miles 614.0 and 300.0 in the Rock Island District. The contract includes options for 4 additional years of maintenance dredging. To: Furnish, deliver and operate dredge and attendant plant for maintenance dredging between Upper Mississippi River Miles 614.0 and 857.6 and between Minnesota River Miles 0.0 and 14.7, between St. Croix River Miles 0.0 and 24.5, between Black River Miles 0.0 and 1.4 in the St. Paul District and between Upper Mississippi River Miles 614.0 and 300.0 in the Rock Island District. The contract includes options for 4 additional years of maintenance dredging. The Government will not issue task orders for work upstream of river mile 854 unless the Upper St. Anthony Lock is reopened to commercial traffic. Bid Inquiry #7951290 The bid item could be for island creation but is not limited to this activity. The in-water placement item is for the material placement whether below the water surface or once it is above the water surface. There will be no differentiation between materials placed under a task order for in-water placement. This item is paid in addition to the dredging item for this type of work. Bid Inquiry #7951291 Reference bidder inquiry 7951291 SECTION 01 22 00.0013 MEASUREMENT AND PAYMENT Changed paragraph 1.13 HIGHWAY TRANSPORTATION OF MATERIAL UP TO 10 MILES TO PLACEMENT SITES From: 1.13.1 Payment Payment will be made for highway transportation of material up to 10 miles to the placement site identified by the Task Order. This bid item is in addition to the unloading or dredging item associated with the material. Work shall include, but not be limited to, providing all equipment, labor, and other work necessary to transport the material from the marine plant transfer point to the Government designated placement site. Other work includes maintenance and restoration of the haul route which is considered incidental to this bid schedule item. Payment for movement of material up to an additional 900 feet within the placement site from the location designated by the Government is incidental to the unloading or dredging item associated with the material. This bid item is stand-alone from, and may not be combined with, either of the Overland Transportation of Material bid items for payment purposes. To: 1.13.1 Payment Payment will be made for highway transportation of material up to 10 miles to the placement site identified by the Task Order. This bid item is in addition to the unloading or dredging item associated with the material. Work shall include, but not be limited to, providing all equipment, labor, and other work necessary to transport the material from the marine plant transfer point to the Government designated placement site. Payment for movement of material up to an additional 900 feet within the placement site from the location designated by the Government is incidental to the unloading or dredging item associated with the material. This bid item is stand-alone from, and may not be combined with, either of the Overland Transportation of Material bid items for payment purposes.

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

about 13 hours ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

about 13 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS