Megawatt Depot Charging Expansion at Colton to Support the Future of Zero-Emission Freight Operations
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Energy Commission is forecasting a project for the Megawatt Depot Charging Expansion at Colton to support zero-emission freight operations. The project involves the installation of two Megawatt Charging Systems chargers, including two dispensers, one power cabinet, and associated switchgear and electrical equipment. The installation will take place at an existing charging center in Colton, California, utilizing previously developed land that was reserved for future charging equipment. This expansion will not increase the overall developed footprint of the facility. There is no specified set-aside status for this contract.
General Info
Place of Performance
Set-Aside
Documents
0No documents available
Documents will appear here when they are available.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Get what you need to respond
No documents were posted with this contract.
- Buyer contactEmail and phone
- Original solicitationLink to the source posting
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
forecast
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from California → Energy Commission
Same awarding agency
Research this forecast and prepare for the solicitation
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
