Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Ohio was posted on August 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MEP Engineering Consultant

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract for an MEP Engineering Consultant involves providing detailed engineering design and specifications for the renovation of the S166 Research Lab at The Ohio State University. The selected consultant will be responsible for developing schematic designs and design development for electrical, plumbing, and HVAC systems, with a specific focus on lab-critical infrastructure such as fume hoods, specialized electrical loads, and ventilation. All deliverables, including technical specifications, load calculations, and MEP design drawings, must comply with the Ohio Facilities Construction Manual and University Sustainability Standards. The opportunity was posted on August 28, 2026, with a response deadline of September 15, 2026, under NAICS code 541330.

General Info

MEP engineering design for OSU S166 Research Lab renovation, due September 15, 2026.

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of OSU-270017.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

1307 Kinnear Rd-S166 Research Lab Renovations

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
ContactsNo contacts available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs detailed engineering design and specifications for the renovation of the S166 Research Lab for prime contractors on Ohio State University facility projects. Develops schematic design and design development for HVAC, electrical, and plumbing systems, including lab-specific ventilation, fume hoods, and specialized electrical loads. Adheres to University Sustainability Standards and the Ohio Facilities Construction Manual. Delivers MEP design drawings, technical specifications, and load calculations.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 238220
New
SLED
OSU-255480, JOC HHW and CHW Meter Replacement
Solicitation # OSU-255480
The OSU-255480 project involves the replacement of existing insertion-style chilled water and heating water meters with in-line electromagnetic flow meters at the James Outpatient Care facility in Columbus, Ohio. The scope of work includes necessary pipe modifications to meet straight-pipe requirements, the installation of 304 stainless steel flow tubes with 316 stainless steel electrodes, and the provision of remote wall-mounted programmable transmitters with a billing accuracy of plus or minus 0.25 percent. Additionally, the contractor must provide and wire OSU and ENGIE compliant gas meter integration, including all required power, building automation, and wiring pathways. All work must adhere to the 2024 Ohio Building Code, NFPA 70, NFPA 70E, and ANSI standards for pipe identification and safety signs. The contract has a trade estimate of 341,000 dollars and a performance period of 120 consecutive days from the Notice to Proceed. Bids are due by October 30, 2026, and will be awarded to the lowest responsive and responsible bidder based on experience, financial condition, and management capability. Key requirements include a 5.0 percent EDGE participation goal, compliance with Ohio prevailing wage laws, and the maintenance of builder's risk insurance on a special causes of loss form. Contractors are required to submit detailed bidder qualifications and a pre-work evaluation regarding construction site safety. Final acceptance is contingent upon a successful final inspection by the Architect/Engineer and the delivery of approved O&M manuals.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS