This Government Contract opportunity from Department Of Defense was posted on May 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Metal Sheet Piling Installation – Floodwall Segment
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the installation of metal sheet piling for the Reach 4 floodwall segment, requiring precise driving, splicing, alignment, and bracing of steel sheet piles to create a continuous, watertight flood barrier. All work must be executed to ensure structural integrity and long-term performance under flood conditions, with strict adherence to engineering specifications for pile depth, spacing, and interlock integrity. The project is part of a larger flood risk mitigation effort and requires specialized equipment and skilled labor to handle the challenging geotechnical conditions at the site in Cedar Rapids. This is a subcontract under the Department of Defense, with the contracting office listed as W07V Endist Rock Island. The North American Industry Classification System code 238990 indicates it falls under other heavy and civil engineering construction. The solicitation was posted on May 1, 2026, with a response deadline of March 18, 2026, at 6:00 PM, indicating a reverse timeline that likely reflects administrative or planning adjustments. Work is to be performed at the Cedar Rapids location, and all activities must comply with federal construction standards and environmental regulations applicable to Defense Department infrastructure projects.
General Info
Agency
NAICS
Place of Performance
Cedar Rapids, IA, USASet-Aside
Documents
This scope was carved out of W912EK26BA001.
The full solicitation package (17 documents), including the RFP, is on the prime solicitation, not on this scope.
Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station
AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Department Of Defense → W07V Endist Rock Island
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
