Metro Airport Vicinity
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Sacramento County Department of Transportation is advancing infrastructure improvements in the Metro Air Park Special Planning Area, primarily focused on extending Skyking Road approximately 1,155 feet east from Metro Air Parkway to connect with Phelan Drive, while also extending Phelan Drive about 380 feet northwest from West Elkhorn Boulevard. Both roadways will be constructed as two-lane arterials featuring bike lanes, curb and gutter, and separated sidewalks; Skyking Road will include eight-foot landscape planters flanking the sidewalks on both sides, and Phelan Drive will have a separated sidewalk along its western segment. The project also entails installing six streetlights, a 12-inch potable water system, and comprehensive storm drainage infrastructure. The work is part of a broader effort to enhance mobility and connectivity in the area, with the project control number PLER2025-00051 and related initiatives like Power Line Road Phase 2 and Meister Way Improvement all falling under the same environmental review framework. The project is governed by the California Environmental Quality Act (CEQA), with the Final Environmental Impact Report and associated Addendum serving as the foundation for approval, ensuring all mitigation measures are incorporated into construction. The lead agency is Sacramento County, with engineering oversight by the Department of Transportation and environmental coordination managed through the Planning and Environmental Review Office. The project is administered under local government protocols rather than federal procurement regulations, as no Federal Acquisition Regulation (FAR) clauses, contract types, pricing details, or federal accounting codes are present in the documentation. While a solicitation number exists and a deadline for submissions was set for November 19, 2025, no formal contract value, delivery schedule, payment terms, invoicing method, or contracting officer information has been disclosed. Key point of contact for environmental compliance is Julie Newton, and technical oversight is managed by Project Engineer Nestor Hernandez. All inspections and final acceptance occur at the project site, with administrative documentation submitted to the County’s Planning and Environmental Review Office in Sacramento. The project is not subject to federal set-asides, socioeconomic certifications, or contractor representations required under FAR, and no subcontracting guidelines or special requirements such as security clearances or OCI provisions are identified. Performance is measured through compliance with the certified EIR, adherence to the approved engineering design, and timely completion consistent with local infrastructure standards, with no mention of incentive or penalty mechanisms. The posting date of June 12, 2026, reflects environmental determination timelines rather than contract execution, and
General Info
Agency
NAICS
Place of Performance
Sacramento, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
