Midwest Guardrail System (MGS) Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of the Midwest Guardrail System (MGS) for prime contractors on Caltrans District 12 highway safety projects. The scope of work includes the removal of non-compliant safety devices and the installation of MGS components within the paved travel way of the state right-of-way on SR-241, specifically at Postmiles 28.4 and 33.1. All work must be performed using guardrail driving equipment and post drivers in strict accordance with Caltrans safety standards and specifications to deliver a fully installed and certified system. The project is located in Irvine, California, under the jurisdiction of Caltrans District 12 - Orange. Classified under NAICS code 238990, the contract focuses on specialized highway safety infrastructure. The installation process is designed to ensure that all safety devices meet current state requirements for highway protection.

General Info

Subcontract for installing Midwest Guardrail Systems on SR-241 in Irvine, Caltrans District 12.

Agency

California → Caltrans, District 12 - Orange

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Irvine, CA

Set-Aside

NONE

Documents

This scope was carved out of 0W220.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

0W220 MINOR B MGS REPLACEMENT SR-241

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 12 - Orange
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Caltrans, District 12 - Orange
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs Midwest Guardrail System (MGS) for prime contractors on Caltrans District 12 highway safety projects. Removes existing non-compliant safety devices and installs MGS components within the paved travel way of the state right-of-way on SR-241. Utilizes guardrail driving equipment and post drivers per Caltrans safety standards and specifications. Delivers a fully installed and certified MGS at Postmiles 28.4/33.1.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
Transportation Yard A Gate Modifications
Solicitation # 090226-1
Solicitation 090226-1 involves modifications to Gate A at the Twin Rivers Unified School District Transportation Yard located at 1400 Grand Avenue, Sacramento, California. The scope of work encompasses site demolition, earthwork, trenching, backfilling, asphalt paving, and site concrete work. Key deliverables include the installation of chain link and decorative metal fences and gates, the addition of four 10-foot square tubing posts, and the relocation and secure anchoring of existing Knox Boxes. The project requires strict adherence to technical standards, including ASTM F 1083 for steel pipe, ASTM C94 for 2,500 p.s.i. concrete, and ASTM D 6628 for pavement markings. All field welding must be performed by a Certified Structural Welder. The awarded contractor is responsible for all site safety and must submit a Site Safety Plan in compliance with DSA Bulletin BU 24-05. Specific operational requirements include maintaining clear utility markings, storing cement in weather-tight buildings, and ensuring accessibility compliance via ADA and CCR Title 24 warning surface tiles. Project oversight involves coordination with the District Construction Manager for underground work and notification of the Inspector, Architect, and DSA 48 hours prior to concrete placement. A mandatory pre-bid conference was scheduled for September 14, 2026, with a final response deadline of September 23, 2026.
TWIN RIVERS UNIFIED SCHOOL DISTRICT

POSTED

1 day ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS