Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Minor Modification to the Master Plan for Woodbury Town Center (File No. 00975331-PMPC)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Irvine is planning a minor modification to the Master Plan for Woodbury Town Center to enhance traffic flow, modernize lighting, update landscaping, and reconfigure the parking layout for improved functionality and aesthetics. These changes are intended to support better circulation for pedestrians and vehicles, increase safety and accessibility, and elevate the overall urban environment of the commercial hub. The project is classified as a forecast under File No. 00975331-PMPC and is scheduled for posting on July 22, 2026, with performance taking place entirely within Irvine, California. Michael O’Toole, Associate Planner, serves as the primary point of contact for inquiries, while Peter Pirzadeh, Project Manager, oversees the technical execution. No solicitation number or set-aside information is currently available, and the project does not specify a NAICS code or organization type. Further details can be accessed through the CEQA Net project link provided.

General Info

Irvine to modify Woodbury Town Center plan for improved traffic, lighting, landscaping, and parking by July 22, 2026.

Agency

California → City of Irvine

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Irvine, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption - Woodbury Town Center Minor Modification

PDFenvironmental-determination

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Irvine
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Irvine
Office AddressN/A
Contacts
Michael O' TooleAssociate Planner
Peter PirzadehProject Manager

Full Description

Show more
Minor modification to improve the Woodbury Town Center's traffic circulation, update lighting and landscaping, and reconfigure the parking layout.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization, safety, and operational reliability. Key efforts include replacing aging airfield lighting circuits with low megger readings with new LED fixtures and signs to enhance visibility and energy efficiency. Concurrently, failing pavement sections and critical underground utilities will be removed and replaced to ensure structural integrity and prevent service disruptions. Wildlife hazard mitigation is addressed through the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage to deter birds, and the regrading of low-lying areas coupled with new storm drainage infrastructure to eliminate ponding that attracts wildlife. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid and unimpeded access for emergency response teams. The work is part of the larger AIRFIELD 2030 initiative and falls under NAICS code 237990, with all performance obligations tied to the Port of Seattle’s aviation facilities. The contract is forecasted under the Aviation Project Management Group and will be managed by Yanet Maldonado, the primary point of contact, who can be reached via phone or email for inquiries. There is no formal solicitation number yet, and the contract is currently in the pre-solicitation phase with a posted date of July 23, 2026. No set-aside provisions are specified, and the location of performance is centered on the Port of Seattle’s airfield assets. All components of this project are designed to enhance safety, regulatory compliance, and long-term operational resilience of the airfield infrastructure.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract, titled 2027 Airfield Project - Contract 2, issued by the Port of Seattle through its Aviation Project Management Group, encompasses a wide range of airfield infrastructure improvements aimed at enhancing safety, efficiency, and compliance. Key tasks include replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utility systems will be replaced to ensure structural integrity and operational reliability across the airfield. Wildlife hazard mitigation measures are also included, such as the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on signage, and the regrading of areas with ponding issues alongside the installation of new storm drainage infrastructure to reduce bird attraction and improve water runoff. Additionally, the project involves replacing deteriorated flush fire hydrant access hatches to ensure rapid and unimpeded access for emergency response. The work is classified under NAICS code 237990 and is forecasted for future award, with the solicitation posted on July 23, 2026. Primary point of contact is Moraa Omwega, reachable via email and phone, with David Neds serving as the Project Manager for technical oversight. The contract is intended for performance at the Port of Seattle’s airfield facilities, though exact location details are not specified in the metadata, and interested parties are directed to the official portal for further details.
Aviation Project Management Group

POSTED

about 8 hours ago

DEADLINE

N/A
View Details