Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Full Capture System Trash Capture Device Installations on Various District Tenant Leaseholds

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Diego Unified Port District is implementing a project to install Full Capture System trash capture devices within existing storm drain systems at approximately 25 tenant leaseholds classified as priority land uses. These installations will take place across commercial and industrial areas in San Diego, National City, and Coronado to ensure compliance with the California State Water Resources Control Board's Trash Amendments by December 1, 2030. The scope of work includes the submission of a civil engineer-prepared Hydrology and Hydraulic analysis, verification that devices are on the State Water Board's certified list, clearing of debris from existing drains, and the modification of catch basins or inlets to meet state criteria. Each installation is expected to take approximately two days and require a crew of three personnel, with minimal impact on local traffic and parking. Tenants are responsible for adhering to all federal, state, and local regulations regarding stormwater, hazardous materials, and construction demolition debris. The project is categorized as exempt under CEQA guidelines due to its limited scope and minimal environmental impact. Administrative oversight is managed by Stephanie Bauer, Environmental Programs Manager, and Davin Cox, Planner I.

General Info

Install 25 certified FCS units in storm drains by Dec 2030 to reduce trash, comply with state mandates.

Agency

California → San Diego Unified Port District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Stephanie BauerEnvironmental Programs Manager

Full Description

Show more
The proposed project would include the installation of trash capture devices within existing storm drain systems that convey runoff from commercial and industrial areas within District Tidelands. The proposed project would bring the District and Tenants into compliance with the California State Water Resources Control Board’s (State Water Board) statewide trash provisions (referred to as Trash Amendments) by December 2030 . These Trash Amendments require local California agencies that are subject to stormwater discharge permits to reduce the discharge of trash transported via municipal storm drain systems by installing and maintaining trash capture devices, or Full Capture Systems (FCSs), within “priority land uses” (PLUs) that include commercial and industrial uses. The proposed project would involve the installation of FCSs at approximately 25 District Tenant leaseholds that qualify as a PLU in the cities of San Diego, National City, and Coronado (see Attachment A). Work to specifically complete the proposed project at each location would include the following: • Submittal for approval of a Hydrology and Hydraulic (H&H) analysis prepared by a civil engineer; • Submittal of verification that the proposed trash FCS(s) is on the current State Water Board’s List of Certified FCSs prior to installation • Clearing of debris from and protect existing storm drains in place; and • Modification of existing catch basins and/or inlets with an FCS that meets the State Water Board’s criteria. Tenants must complete construction and installation activities for each trash FCS on their leaseholds no later than December 1, 2030. H&H Assessments of stormdrain infrastructure and other factors such as drainage area and flow rate, space limitations, and tidal influence which will need to confirm the location(s) and type of each proposed FCS(s) to be installed. Installation of each trash FCS is anticipated to take approximately two (2) days to complete, with ongoing installations, modifications, inspections, and maintenance as needed, and would require a crew of approximately three (3) personnel. For locations within parking lots, nearby parking spaces may be closed to complete FCS installation, which would only be closed for approximately two (2) hours at a time and would reopen once each device has been installed. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, Tenants would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS