Mirabel Road Corridor Improvements and West County Trail Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mirabel Road Corridor Improvements and West County Trail Project in Forestville, California, aims to enhance transportation safety and mobility by widening Mirabel Road from State Route 116 to River Road, incorporating Class II bike lanes and adding northbound and southbound left turn lanes at the intersections of Davis Road and Giusti Road. An additional 8 to 10 foot wide Class I bike path will be constructed along the eastern side of Mirabel Road from SR 116 to Davis Road as part of the West County Trail Gap Closure initiative. The project also includes relocation of utility poles and installation of new roadway drainage facilities to support the expanded infrastructure. All work is being conducted under the oversight of Sonoma County Public Infrastructure, with the place of performance specifically defined as Mirabel Road in Forestville, ZIP code 95436, and coordinated through the County’s office at 400 Aviation Blvd, Suite 100, Santa Rosa, CA. Environmental compliance is central to the project, requiring adherence to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), with assessments guided by standards including BAAQMD air quality guidelines, U.S. Army Corps of Engineers wetland delineation procedures, and Clean Water Act regulations. Inspection activities occur on-site at designated sampling points, with final acceptance administered by Sonoma County, supported by coordination with regional agencies including the California Department of Fish and Wildlife and the Regional Water Quality Control Board. The project's environmental review has resulted in a Mitigated Negative Declaration, with public comment periods and submissions handled via the Permit Sonoma portal and State Clearinghouse. No formal contract value, solicitation number, FAR clauses, or procurement-specific details such as payment offices, invoicing methods, evaluation factors, or contractor certifications are specified in the available documentation, indicating the project is currently in a planning and environmental approval phase rather than an active contracting stage. The primary point of contact for project inquiries is Olguin Caban, Assistant Engineer at Sonoma County Public Infrastructure.

General Info

Sonoma County to widen Mirabel Road, add bike lanes and trail, upgrade utilities, and meet green standards by June 2026.

Agency

California → Sonoma County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Mirabel Road between SR 116 and River Road, CA, 95436

Set-Aside

NONE

Documents

(9)

Mirabel Road Corridor Improvements Appendix C - Preliminary Delineation of Wetlands

PDFwetland-delineation-report

Mirabel Road Corridor Improvements Notice of Intent

PDFspecial-notice

Mirabel Road Corridor Improvements Notice of Completion

PDFnotice-of-completion

Mirabel Road Corridor Improvements Appendix D Tree Inventory

PDFsow

Mirabel Road Corridor Improvements Biological Resources Report Appendix B

PDFbiological-resources-report

Mirabel Road Corridor Improvements and West County Trail Project Summary

PDFenvironmental-summary

Mirabel Road Corridor Improvements CEQA ISMND Draft October 2025

PDFenvironmental-assessment

Notice of Determination for Mirabel Road Corridor Improvements Project

PDFnotice-of-determination

Mirabel Road Corridor Improvements Air Quality and Emissions Study Appendix A

PDFenvironmental-study

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
Olguin CabanAssistant Engineer

Interested Companies (1)

Show more
Circlepoint
Oakland, CA

Full Description

Show more
The proposed project would widen Mirabel Road from State Route (SR) 116 to River Road in Forestville to accommodate Class II bike lanes and northbound and southbound left turn lanes at intersection of Davis Road and Giusti Road as part of the Mirabel Road Widening project. The purpose of this project is to improve the mobility and safety of the existing roadway for all modes of transportation by constructing left turn lanes at Davis Road and Giusti Road intersection and widening the narrow segments of the Mirabel Road to meet the standards of a Class II bike lane. The project would also construct an 8 to 10 foot wide Class I bike path along the east side of Mirabel Road from SR 116 to Davis Road as part of the West County Trail Gap Closure project. Roadway drainage facilities and utility poles will be relocated to accommodate the roadway widening.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 13 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS