Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Mirabel Road Corridor Improvements and West County Trail Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mirabel Road Corridor Improvements and West County Trail Project in Forestville, California, aims to enhance transportation safety and mobility by widening Mirabel Road from State Route 116 to River Road, incorporating Class II bike lanes and adding northbound and southbound left turn lanes at the intersections of Davis Road and Giusti Road. An additional 8 to 10 foot wide Class I bike path will be constructed along the eastern side of Mirabel Road from SR 116 to Davis Road as part of the West County Trail Gap Closure initiative. The project also includes relocation of utility poles and installation of new roadway drainage facilities to support the expanded infrastructure. All work is being conducted under the oversight of Sonoma County Public Infrastructure, with the place of performance specifically defined as Mirabel Road in Forestville, ZIP code 95436, and coordinated through the County’s office at 400 Aviation Blvd, Suite 100, Santa Rosa, CA. Environmental compliance is central to the project, requiring adherence to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), with assessments guided by standards including BAAQMD air quality guidelines, U.S. Army Corps of Engineers wetland delineation procedures, and Clean Water Act regulations. Inspection activities occur on-site at designated sampling points, with final acceptance administered by Sonoma County, supported by coordination with regional agencies including the California Department of Fish and Wildlife and the Regional Water Quality Control Board. The project's environmental review has resulted in a Mitigated Negative Declaration, with public comment periods and submissions handled via the Permit Sonoma portal and State Clearinghouse. No formal contract value, solicitation number, FAR clauses, or procurement-specific details such as payment offices, invoicing methods, evaluation factors, or contractor certifications are specified in the available documentation, indicating the project is currently in a planning and environmental approval phase rather than an active contracting stage. The primary point of contact for project inquiries is Olguin Caban, Assistant Engineer at Sonoma County Public Infrastructure.

General Info

Sonoma County to widen Mirabel Road, add bike lanes and trail, upgrade utilities, and meet green standards by June 2026.

Place of Performance

Mirabel Road between SR 116 and River Road, CA, 95436

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Sonoma County
Office AddressN/A
Contacts
Olguin CabanAssistant Engineer

Interested Companies (1)

CirclepointOakland, CA

Full Description

Show more
The proposed project would widen Mirabel Road from State Route (SR) 116 to River Road in Forestville to accommodate Class II bike lanes and northbound and southbound left turn lanes at intersection of Davis Road and Giusti Road as part of the Mirabel Road Widening project. The purpose of this project is to improve the mobility and safety of the existing roadway for all modes of transportation by constructing left turn lanes at Davis Road and Giusti Road intersection and widening the narrow segments of the Mirabel Road to meet the standards of a Class II bike lane. The project would also construct an 8 to 10 foot wide Class I bike path along the east side of Mirabel Road from SR 116 to Davis Road as part of the West County Trail Gap Closure project. Roadway drainage facilities and utility poles will be relocated to accommodate the roadway widening.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 11 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 11 hours ago

DEADLINE

in 26 days
View Details

More opportunities from California → Sonoma County

Same awarding agency

NAICS: 236220
SLED
County Administration Center Redevelopment ProjectThe County Administration Center Redevelopment Project in Santa Rosa, California, involves the construction of a five-story, 250,000-square-foot office building to house approximately 1,200 full-time employees, including a 3,500-square-foot Board of Supervisors chamber, alongside a 7,000- to 13,000-square-foot single-story Emergency Coordination Center designed for disaster response with integrated conference functionality during normal operations. The project also includes approximately 1,050 parking spaces beneath a one-megawatt solar microgrid with battery storage, and a residential component featuring up to 1,500 housing units in buildings up to seven stories tall, along with up to 20,000 square feet of retail and commercial space supporting around 32 employees. Common open spaces and pedestrian connections will unify the office, residential, and commercial areas. Construction is scheduled to occur between July 15, 2026, and August 28, 2026, on the County Administration Center campus bounded by Highway 101, Mendocino Avenue, Steele Lane, and Bicentennial Way, with the Assessor’s Parcel Number 180-030-012. The project must comply with California Building Standards Code Title 24, including energy efficiency, water conservation, and CALGreen standards, as well as Sonoma County’s General Plan, noise ordinances, and visual assessment guidelines. Mitigation measures for air quality, noise, hazardous materials, cultural resources, and stormwater runoff are required under CEQA, with oversight led by the County of Sonoma through its Environmental and Real Estate teams. No formal contract value, pricing data, or federal acquisition clauses are provided, and the documents reflect an environmental impact report rather than a procurement solicitation, with no identifiable FAR clauses, contracting officer roles, or offeror certifications. Responsibility for compliance lies jointly with the government for oversight and the contractor for on-site implementation of environmental controls, including dust suppression, noise mitigation, and hazardous material handling under CCR, FIFRA, and 49 CFR regulations.
Commercial and Institutional Building Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS