Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Hawaii was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mobilization and Site Setup

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Transportation Yard A Gate Modifications
Solicitation # 090226-1
Solicitation 090226-1 involves modifications to Gate A at the Twin Rivers Unified School District Transportation Yard located at 1400 Grand Avenue, Sacramento, California. The scope of work encompasses site demolition, earthwork, trenching, backfilling, asphalt paving, and site concrete work. Key deliverables include the installation of chain link and decorative metal fences and gates, the addition of four 10-foot square tubing posts, and the relocation and secure anchoring of existing Knox Boxes. The project requires strict adherence to technical standards, including ASTM F 1083 for steel pipe, ASTM C94 for 2,500 p.s.i. concrete, and ASTM D 6628 for pavement markings. All field welding must be performed by a Certified Structural Welder. The awarded contractor is responsible for all site safety and must submit a Site Safety Plan in compliance with DSA Bulletin BU 24-05. Specific operational requirements include maintaining clear utility markings, storing cement in weather-tight buildings, and ensuring accessibility compliance via ADA and CCR Title 24 warning surface tiles. Project oversight involves coordination with the District Construction Manager for underground work and notification of the Inspector, Architect, and DSA 48 hours prior to concrete placement. A mandatory pre-bid conference was scheduled for September 14, 2026, with a final response deadline of September 23, 2026.
TWIN RIVERS UNIFIED SCHOOL DISTRICT

POSTED

1 day ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract pertains to the mobilization and site setup required for marine construction activities at Honolulu Harbor, Pier 10, encompassing all necessary initial procedures to prepare the worksite for operations. This includes securing site access, establishing temporary facilities to support personnel and logistics, implementing traffic control measures to ensure safety and compliance, and mobilizing required equipment and materials to the location. The work is classified under NAICS code 238990, indicating it relates to other specialized construction activities, and is structured as a subcontract under the Department of Transportation, Hawaii office. The solicitation was posted on May 19, 2026, with a response deadline of June 19, 2026, providing potential bidders a one-month window to submit proposals. All activities are confined to the designated location at Pier 10, with no alternative performance sites identified, and the contract does not specify any set-aside status or additional organizational requirements beyond the general scope of mobilization.

General Info

Mobilization and site setup for marine construction at Honolulu Harbor Pier 10 under DOT Hawaii subcontract.

Agency

Hawaii → Department of TransportationView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

HI, USA

Set-Aside

NONE

Documents

This scope was carved out of B26002964.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

S10955 - Honolulu Harbor, Pier 10, Substructure Repairs, Oahu

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyHawaii → Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Hawaii → Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Initial setup including site access, temporary facilities, traffic control, and equipment mobilization for marine construction at Honolulu Harbor, Pier 10.

More opportunities from Hawaii → Department of Transportation

Same awarding agency

NAICS: 237310
SLED
HWY-OM-2027-38 Sidewalk, Curb/Gutter, Conc Med Barr Rep, Oahu
Solicitation # HWY-OM-2027-38
The Hawaii Department of Transportation is soliciting bids for Project No. HWY-OM-2027-38 to provide labor, equipment, materials, and traffic control for the repair of reinforced Portland cement concrete sidewalks, curbs, gutters, and concrete median barriers on the Island of Oahu. This is an open-end, as-needed contract with an initial performance period of 24 months from the Notice to Proceed, with the possibility of three additional 12-month extensions upon mutual agreement. The scope includes the restoration of damaged concrete structures, daily removal of all repair-related debris, and the implementation of necessary traffic control. All work must adhere to current industry practices, ADA and ADAAG accessibility guidelines, and HIO SH and OSHA safety standards. The contract will be awarded to the responsible bidder who submits a responsive bid with the lowest evaluated price. For evaluation purposes, a 5% preference may be applied for Hawaii bidders and an additional 5% preference for those participating in approved apprenticeship programs. Bidders must submit their proposals via the HIePRO portal by September 25, 2026, at 2:00 p.m. HST. Required security includes surety bid bonds, as well as performance and labor and material payment bonds. Payment is structured through unit and lump sum prices, with retainage of 5% applied until 50% of the contract cost is complete, after which the Engineer may make progress payments in full. Final acceptance is determined by the Engineer upon the satisfactory completion of all contract work.
Highway, Street, and Bridge Construction

POSTED

14 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS