Modeling of the Epcot Energy Plant Electrical System
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Central Florida Tourism Oversight District, in coordination with Reedy Creek Energy Services, is seeking a qualified engineering firm to develop a comprehensive electrical system model of the EPCOT Energy Plant. The model must capture the full operational state of the facility, including four primary feeders with associated switchgear, three medium-voltage buses fed by multiple step-down transformers, and eight chiller units—some connected directly at medium voltage and others via secondary step-down transformers. The project requires detailed analysis of power quality factors such as harmonics, voltage drop, motor starting characteristics, and arc flash hazards to ensure safe and reliable operation amid ongoing facility expansions and anticipated load growth. The Consultant must validate the model against real-world operating conditions, conduct a suite of technical analyses including load flow, short circuit, and harmonic studies, and deliver a fully functional, industry-standard model capable of supporting future system modifications. The District will provide available system data but expects the Consultant to identify all gaps, document assumptions with sound engineering judgment, and perform necessary field verification to ensure model accuracy. The final model must be structured for modular expansion and delivered with complete documentation, including updated one-line diagrams if applicable, detailed technical reports for each analysis performed, a summary of findings and recommendations, and a record of all data sources and modeling choices. The model must be fully operable and maintainable by the District after delivery. Proposals are submitted via a Letter of Interest with a deadline of September 18, 2026, and the contract will be awarded to the highest-ranked proposer after negotiation of fees, with no bid bond required. All work will be performed in support of the District’s Utilities Services Department, headquartered in California, though the physical site of the EEP is in Florida.
General Info
Agency
NAICS
Place of Performance
1900 Hotel Plaza Blvd Lake Buena Vista, Florida 32830, CA, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Existing System Model
A detailed electrical model representing the current, fully operational EEP, including at a minimum:
• Four (4) primary feeders with associated primary switchgear • Three (3) medium-voltage buses supplied via multiple primary-to-primary step-down transformers • Eight (8) chiller units supplied from the medium-voltage buses including: o Chiller motors connected directly at medium voltage o Chiller motors served via primary-to-secondary step-down transformers
Power quality is a critical concern for both current and future operating conditions. The Consultant shall provide expertise and analysis related to harmonics, voltage drop, motor starting, and arc flash hazards.
PROJECT DESCRIPTION
CFTOD owns and RCES operates the EEP, which provides chilled water services to nearby attractions and resort facilities. Due to ongoing expansion, renovation initiatives, and future load growth, both the primary and secondary electrical systems at EEP must be evaluated and, where necessary, upgraded.
Prior to the addition of new load, RCES requires a detailed “snapshot” electrical model to benchmark the current system condition and evaluate future system performance under various scenarios.
SCOPE OF WORK
The Consultant shall: • Design, develop, test, and document an electrical system model of the EEP • Conduct a virtual project kickoff workshop with RCES to confirm assumptions, modeling approach, data requirements, and acceptance criteria • Perform attribute validation and engineering checks to ensure model accuracy • Validate model results against known operating conditions • Perform analyses including: o Load flow o Short circuit / fault analysis o Motor starting o Voltage drop o Harmonic analysis o Arc flash analysis • Demonstrate model functionality and analytical capabilities • Prepare formal technical reports documenting assumptions, methodology, and results
Data and Model Requirements
The District will provide available system data upon request; however, the Consultant shall be responsible for identifying data gaps, documenting assumptions, and incorporating reasonable engineering judgment where necessary. Field verification may be required to support model accuracy.
The electrical system model shall be delivered in an industry-recognized software platform and include all necessary data for the District to independently operate and maintain the model. The model shall be structured to support future updates, including modular expansion for additional loads and infrastructure.
Deliverables
Deliverables shall include, at a minimum: • Complete electrical system model files • Technical reports for each analysis performed • Summary of findings and recommendations • Documentation of assumptions and data sources • Updated one-line diagrams (if applicable)
Notes: The District is awarding one contract and will negotiate the fee with the highest ranked proposer.
Bid Bond: 0.00%