Modeling of the Epcot Energy Plant Electrical System
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Central Florida Tourism Oversight District, in coordination with Reedy Creek Energy Services, is seeking a qualified engineering firm to develop a comprehensive electrical system model of the EPCOT Energy Plant. The primary objective is to create a detailed snapshot of the current operational system, including primary feeders, medium-voltage buses, and chiller units, to benchmark current conditions and evaluate future performance under various load growth and renovation scenarios. The selected consultant will be responsible for designing, testing, and documenting the model using an industry-recognized software platform, ensuring it is structured for future modular expansion. The scope of work includes conducting a virtual kickoff workshop, performing attribute validation, and executing critical analyses such as load flow, short circuit/fault, motor starting, voltage drop, harmonics, and arc flash hazards. Key deliverables consist of the complete model files, technical reports for each analysis, a summary of findings and recommendations, and updated one-line diagrams. The contract will be awarded to the most advantageous proposer based on a weighted evaluation of team qualifications, technical approach, relevant experience, and past performance. Compensation will be determined through a negotiated fixed-fee agreement following the selection process.
General Info
Agency
NAICS
Place of Performance
1900 Hotel Plaza Blvd Lake Buena Vista, Florida 32830, CA, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Existing System Model
A detailed electrical model representing the current, fully operational EEP, including at a minimum:
• Four (4) primary feeders with associated primary switchgear • Three (3) medium-voltage buses supplied via multiple primary-to-primary step-down transformers • Eight (8) chiller units supplied from the medium-voltage buses including: o Chiller motors connected directly at medium voltage o Chiller motors served via primary-to-secondary step-down transformers
Power quality is a critical concern for both current and future operating conditions. The Consultant shall provide expertise and analysis related to harmonics, voltage drop, motor starting, and arc flash hazards.
PROJECT DESCRIPTION
CFTOD owns and RCES operates the EEP, which provides chilled water services to nearby attractions and resort facilities. Due to ongoing expansion, renovation initiatives, and future load growth, both the primary and secondary electrical systems at EEP must be evaluated and, where necessary, upgraded.
Prior to the addition of new load, RCES requires a detailed “snapshot” electrical model to benchmark the current system condition and evaluate future system performance under various scenarios.
SCOPE OF WORK
The Consultant shall: • Design, develop, test, and document an electrical system model of the EEP • Conduct a virtual project kickoff workshop with RCES to confirm assumptions, modeling approach, data requirements, and acceptance criteria • Perform attribute validation and engineering checks to ensure model accuracy • Validate model results against known operating conditions • Perform analyses including: o Load flow o Short circuit / fault analysis o Motor starting o Voltage drop o Harmonic analysis o Arc flash analysis • Demonstrate model functionality and analytical capabilities • Prepare formal technical reports documenting assumptions, methodology, and results
Data and Model Requirements
The District will provide available system data upon request; however, the Consultant shall be responsible for identifying data gaps, documenting assumptions, and incorporating reasonable engineering judgment where necessary. Field verification may be required to support model accuracy.
The electrical system model shall be delivered in an industry-recognized software platform and include all necessary data for the District to independently operate and maintain the model. The model shall be structured to support future updates, including modular expansion for additional loads and infrastructure.
Deliverables
Deliverables shall include, at a minimum: • Complete electrical system model files • Technical reports for each analysis performed • Summary of findings and recommendations • Documentation of assumptions and data sources • Updated one-line diagrams (if applicable)
Notes: The District is awarding one contract and will negotiate the fee with the highest ranked proposer.
Bid Bond: 0.00%
Similar Contracts
Same NAICS industry code
More opportunities from California → Utilities Services Department of Central Florida Tourism Oversight District
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS