Modeling of the Epcot Energy Plant Electrical System

Active
LOI# C007105State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Central Florida Tourism Oversight District, in coordination with Reedy Creek Energy Services, is seeking a qualified engineering firm to develop a comprehensive electrical system model of the EPCOT Energy Plant. The model must capture the full operational state of the facility, including four primary feeders with associated switchgear, three medium-voltage buses fed by multiple step-down transformers, and eight chiller units—some connected directly at medium voltage and others via secondary step-down transformers. The project requires detailed analysis of power quality factors such as harmonics, voltage drop, motor starting characteristics, and arc flash hazards to ensure safe and reliable operation amid ongoing facility expansions and anticipated load growth. The Consultant must validate the model against real-world operating conditions, conduct a suite of technical analyses including load flow, short circuit, and harmonic studies, and deliver a fully functional, industry-standard model capable of supporting future system modifications. The District will provide available system data but expects the Consultant to identify all gaps, document assumptions with sound engineering judgment, and perform necessary field verification to ensure model accuracy. The final model must be structured for modular expansion and delivered with complete documentation, including updated one-line diagrams if applicable, detailed technical reports for each analysis performed, a summary of findings and recommendations, and a record of all data sources and modeling choices. The model must be fully operable and maintainable by the District after delivery. Proposals are submitted via a Letter of Interest with a deadline of September 18, 2026, and the contract will be awarded to the highest-ranked proposer after negotiation of fees, with no bid bond required. All work will be performed in support of the District’s Utilities Services Department, headquartered in California, though the physical site of the EEP is in Florida.

General Info

Develop electrical model of EPCOT Energy Plant with load flow, harmonics, and arc flash analysis for future expansion.

Agency

California → Utilities Services Department of Central Florida Tourism Oversight DistrictView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

1900 Hotel Plaza Blvd Lake Buena Vista, Florida 32830, CA, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

Contract opportunity posted

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Utilities Services Department of Central Florida Tourism Oversight District
Contacts1 person available
OfficeCA, US
Organization / Agency
California → Utilities Services Department of Central Florida Tourism Oversight District
View Agency Profile
Office AddressCA, US
Contacts

Full Description

Show more
Scope: The Central Florida Tourism Oversight District (“CFTOD” or “District”), in coordination with Reedy Creek Energy Services (“RCES”), invites qualified engineering firms to submit a Letter of Interest (LOI) to provide the development of a comprehensive electrical system model of the EPCOT Energy Plant (EEP).
Existing System Model
A detailed electrical model representing the current, fully operational EEP, including at a minimum:
• Four (4) primary feeders with associated primary switchgear • Three (3) medium-voltage buses supplied via multiple primary-to-primary step-down transformers • Eight (8) chiller units supplied from the medium-voltage buses including: o Chiller motors connected directly at medium voltage o Chiller motors served via primary-to-secondary step-down transformers
Power quality is a critical concern for both current and future operating conditions. The Consultant shall provide expertise and analysis related to harmonics, voltage drop, motor starting, and arc flash hazards.
PROJECT DESCRIPTION
CFTOD owns and RCES operates the EEP, which provides chilled water services to nearby attractions and resort facilities. Due to ongoing expansion, renovation initiatives, and future load growth, both the primary and secondary electrical systems at EEP must be evaluated and, where necessary, upgraded.
Prior to the addition of new load, RCES requires a detailed “snapshot” electrical model to benchmark the current system condition and evaluate future system performance under various scenarios.
SCOPE OF WORK
The Consultant shall: • Design, develop, test, and document an electrical system model of the EEP • Conduct a virtual project kickoff workshop with RCES to confirm assumptions, modeling approach, data requirements, and acceptance criteria • Perform attribute validation and engineering checks to ensure model accuracy • Validate model results against known operating conditions • Perform analyses including: o Load flow o Short circuit / fault analysis o Motor starting o Voltage drop o Harmonic analysis o Arc flash analysis • Demonstrate model functionality and analytical capabilities • Prepare formal technical reports documenting assumptions, methodology, and results
Data and Model Requirements
The District will provide available system data upon request; however, the Consultant shall be responsible for identifying data gaps, documenting assumptions, and incorporating reasonable engineering judgment where necessary. Field verification may be required to support model accuracy.
The electrical system model shall be delivered in an industry-recognized software platform and include all necessary data for the District to independently operate and maintain the model. The model shall be structured to support future updates, including modular expansion for additional loads and infrastructure.
Deliverables
Deliverables shall include, at a minimum: • Complete electrical system model files • Technical reports for each analysis performed • Summary of findings and recommendations • Documentation of assumptions and data sources • Updated one-line diagrams (if applicable)
Notes: The District is awarding one contract and will negotiate the fee with the highest ranked proposer.
Bid Bond: 0.00%

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
FY26-DDOT-TPA-Streetcar PMCThe contract anticipates support for Streetcar 2.0 and its integration with connectivity infrastructure at RFK, focusing on planning, coordination, and implementation efforts to enhance public transit functionality in the District of Columbia. This forecasted procurement under the Department of Transportation (DDOT) is positioned for fiscal year 2026 and is intended to secure services that ensure seamless operational alignment between the expanded streetcar system and key transit hubs, particularly around the RFK site. The effort will likely involve technical oversight, system compatibility testing, and coordination with regional mobility initiatives to improve transit accessibility and efficiency. While specific financial details, timelines, or vendor requirements are not yet defined due to the forecast nature of the posting, the initiative signals a commitment to advancing sustainable urban transportation by expanding the streetcar network and linking it to major transportation nodes. The work will be performed within the District of Columbia, and while no set-aside provisions or NAICS codes are specified, the procurement is expected to involve specialized contractors with expertise in transit infrastructure, signal integration, and systems engineering. Stakeholder engagement and compliance with local transit goals will be critical components as the project moves from forecast to active solicitation.
Transportation (DDOT)

POSTED

about 13 hours ago

DEADLINE

N/A
View Details
NAICS: 541330
New
SLED
FY26 -DOEE-WPD-Automated Rain Barrel ProtypeThe District of Columbia’s Department of Energy and Environment is forecasting a contract opportunity to design, build, and test a prototype automated rain barrel system that will discharge collected stormwater automatically prior to an anticipated storm. The goal is to create a smart, residential-scale solution that increases the capacity of rain barrels to capture more runoff during heavy rainfall events by preemptively emptying them, thereby enhancing stormwater management and reducing urban flooding. The prototype must be reliable, user-friendly, and suitable for widespread residential deployment, incorporating sensors or weather data integration to trigger discharge cycles based on forecasted precipitation. The project is part of FY26 planning under the DOEE’s Water and Pollution Division and is intended to support broader environmental resilience initiatives in the District. While specific funding details, timeline, and technical requirements have not yet been released, the solicitation is anticipated to seek proposals from innovators with expertise in IoT devices, hydrology systems, and environmental engineering. The prototype will be evaluated on functionality, durability, scalability, and potential for integration with municipal weather monitoring systems. Performance validation will include real-world testing under simulated storm conditions to ensure the system consistently and safely empties the barrel before rain arrives without causing overflow or infrastructure stress.
Energy and Environment (DOEE)

POSTED

about 13 hours ago

DEADLINE

N/A
View Details
NAICS: 541330
New
SLED
FY26-DDOT-TBSA-Work Zone Design and Work Zone Safety Transportation Management ProgramThe District of Columbia Department of Transportation is forecasting a contract for the FY26 Work Zone Design and Work Zone Safety Transportation Management Program, aiming to enhance the safety and efficiency of work zones across the city’s transportation infrastructure. This initiative will focus on developing and implementing comprehensive design standards and management strategies that minimize disruptions, protect workers and the public, and ensure seamless traffic flow during construction and maintenance activities. The program is expected to involve advanced planning, engineering expertise, and coordination with multiple stakeholders to align with evolving safety regulations and industry best practices. Although specific details such as funding amounts, contract duration, and selection criteria are not yet finalized, the solicitation is positioned as a forecast with a posted date of July 23, 2026, indicating it is a precursor to a formal procurement process. The work will be performed within the jurisdiction of the District of Columbia, with performance location and other administrative specifics yet to be determined. Interested parties should monitor official channels for the upcoming formal solicitation, as this forecast signals the agency’s intent to secure qualified contractors with specialized experience in transportation management systems, work zone safety protocols, and intelligent infrastructure design.
Transportation (DDOT)

POSTED

about 13 hours ago

DEADLINE

N/A
View Details
NAICS: 541330
New
SLED
FY26-DOEE-WPD-Kenilworth Park Wetland Restoration EA/DesignThe contract pertains to environmental assessment and design services for wetland restoration projects within Kenilworth Park in the Anacostia watershed, scheduled for fiscal year 2026 under the District of Columbia’s Department of Energy and Environment. The work will focus on planning and engineering activities necessary to restore and enhance the ecological function of the wetland areas, addressing habitat degradation, water quality, and natural resource conservation. The project is a forward-looking forecast, indicating future procurement activity, with no solicitation number yet assigned and no set-aside provisions specified, suggesting open competition for qualified firms with expertise in environmental engineering and ecological restoration. The location of performance is tied to Kenilworth Park in the District of Columbia, though precise address details are not provided in the posting. The agency responsible is the District of Columbia’s Energy and Environment (DOEE), which seeks to advance regional environmental resilience through this initiative. No point of contact information is listed, and the notice was posted on July 23, 2026, with an official link directing interested parties to the District’s contracting portal for updates. This forecast serves as an early indicator for potential bidders to prepare proposals aligned with regulatory requirements and ecological restoration best practices for federally and locally significant wetland systems.
Energy and Environment (DOEE)

POSTED

about 13 hours ago

DEADLINE

N/A
View Details
NAICS: 541330
New
SLED
FY26-DDOT-TSA-Traffic Signal System Modernization System Management (Engineering Services)The District of Columbia Department of Transportation is planning a comprehensive modernization of its traffic signal infrastructure through a citywide deployment of advanced traffic signal controllers and a new central management system. This initiative aims to replace all existing legacy controllers with next-generation hardware capable of integrating emerging transportation technologies to enhance traffic flow, reduce congestion, and improve safety for all road users including pedestrians, cyclists, and public transit. The project encompasses both hardware upgrades and the implementation of a centralized software platform to monitor, manage, and optimize signal timing dynamically across the entire city network, increasing operational efficiency and infrastructure return on investment. Engineering services will be required to support the design, integration, testing, and deployment of this modernized system, ensuring seamless interoperability with existing transportation networks and future-proofing the city’s traffic management capabilities. The effort is scoped to deliver comprehensive improvements in multimodal mobility, with a focus on reducing delays, lowering emissions, and supporting equitable access to transportation. While specific procurement details such as set-aside status or NAICS code are not yet defined, the forecasted contract is anticipated to trigger formal bidding in FY26, with work performed citywide under the oversight of DDOT.
Transportation (DDOT)

POSTED

about 13 hours ago

DEADLINE

N/A
View Details

More opportunities from California → Utilities Services Department of Central Florida Tourism Oversight District

Same awarding agency

NAICS: 541330
SLED
Structural/Mechanical Engineering Continuing ServicesThe Central Florida Tourism Oversight District is seeking qualified firms to provide structural and mechanical engineering continuing services under solicitation LOI# C007076, with responses due by July 31, 2026. The scope of work encompasses a broad range of engineering consulting services including utilities support for wastewater, chilled water, hot water, and solid waste systems; general engineering services; planning and assessments; structural design and analysis; water and reclaimed water facility engineering; process and mechanical equipment support; evaluation and rehabilitation of existing facilities; preparation of construction documents and technical deliverables; construction phase and post-design services; and programmatic on-call support. All services will be enacted through individual task orders authorized by the District, ensuring flexibility to address evolving infrastructure needs across its jurisdiction. The contract does not require a bid bond, and the solicitation is issued under the SLED government classification with the Utilities Services Department of the Central Florida Tourism Oversight District as the contracting authority. Despite the agency name referencing California in the address fields, the District operates in Florida and the place of performance is located within its operational region. Primary point of contact for inquiries is Devin Ager, reachable via email at dager@oversightdistrict.org or phone at 407-371-4963. Bidders must submit proposals through the PlanetBids portal linked in the solicitation, and the posting date is listed as June 26, 2026, indicating an upcoming procurement cycle.
Engineering Services

POSTED

28 days ago

DEADLINE

in 8 days
View Details