Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Michigan was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Monument Sign Design and Engineering

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract titled Monument Sign Design and Engineering involves the preparation of detailed shop drawings, structural engineering analysis, and the specification of materials necessary for the design and installation of monument signs. All work must adhere strictly to recognized design standards including the Manual on Uniform Traffic Control Devices and applicable local zoning regulations to ensure safety, compliance, and uniformity. The scope encompasses full engineering support from initial concept through final documentation, requiring technical precision and familiarity with regional construction and traffic control requirements. This is a subcontract opportunity posted by the Westwood Community School District in Michigan, with performance required in Dearborn Heights. The solicitation was made available on July 16, 2026, and responses are due by July 30, 2026, at 8:00 PM Eastern Time. The North American Industry Classification System code 541330 identifies the work as engineering services, and the contract is open without specific set-aside provisions for small businesses or other categories. Interested parties must submit their proposals through the designated Michigan procurement portal by the stated deadline.

General Info

Design and engineer monument signs per traffic and zoning standards, submit proposal by July 30, 2026, in Dearborn Heights.

Place of Performance

Dearborn Heights, MI, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP-WES-260000002376-1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP-WES-260000002376-1 | Westwood - 2026 Monument Signs

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → Westwood Community School Dist
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Preparation of shop drawings, structural engineering, material specifications, and compliance with design standards such as MUTCD and local zoning.

More opportunities from Michigan → Westwood Community School Dist

Same awarding agency

NAICS: 238160
New
SLED
RFP-WES-270000000173-1 | Westwood - Thorne Elementary Partial Roof Replacement
Solicitation # RFP-WES-270000000173-1
The Westwood Community School District is soliciting proposals for a partial roof replacement at Thorne Elementary School in Dearborn Heights, Michigan. The project involves removing existing roofing membranes and components down to the deck and installing a new HPR Modified Roof System. While the contractor provides all labor and equipment, the owner will purchase Garland supplied materials directly through the OMNIA Procurement program. Work must commence within 30 days of the contract award and be completed within 60 days of the start date, with a late completion penalty of 300 dollars per day. Awarding is based on the receipt of an acceptable bid, with the owner evaluating the low bidder's competency, financial responsibility, and performance history. Required submission documents include a professional engineer's seal on manufacturer specifications, a list of three similar projects completed at least five years ago within a 100-mile radius, and an affidavit of compliance with the Iran Economic Sanctions Act. The contractor must also secure performance and payment bonds and adhere to OSHA and NRCA safety standards. Payment is structured through monthly progress invoices, with a 10 percent retainer held until the delivery of the warranty. Final payment is issued within 30 days of job approval, provided lien waivers are submitted. Quality assurance includes field observations at 30, 60, and 90 percent completion, a final joint inspection, and a potential thermographic scan to ensure materials are not damp or wet. All installations must meet ASTM E-108 and FM 1-90 standards.
Roofing Contractors

POSTED

5 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS