Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Moon to Mars Architecture Studies

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Moon to Mars Architecture Studies initiative under NextSTEP-3 is designed to advance the development of integrated systems and mission concepts for human exploration beyond low Earth orbit, with a focus on lunar and Martian environments. Managed by the Strategic and Architecture Office at Marshall Space Flight Center, this effort will issue defined and open study calls led by the Mars Architecture Team, Lunar Architecture Team, and Preformulation Project Teams to refine technical requirements, identify key capabilities, and evaluate architectural options. These calls are open to industry vendors who may propose innovative studies to support the evolution of the Moon to Mars architecture. The program will support awarding contracts for concept development, risk reduction activities, and potential prototyping efforts through a Broad Agency Announcement vehicle, enabling flexible and agile partnerships with industry. The work will directly inform decision-making for future mission elements and help prioritize technology investments aligned with NASA’s deep space exploration goals. Although no solicitation number or specific point of contact is listed yet, the forecast was posted in May 2026 under NAICS code 541715, indicating the focus is on research and development in physical, engineering, and scientific fields. The effort is entirely centered on strategic architectural studies with performance expected to span multiple locations without a fixed physical place of performance.

General Info

NASA's Moon to Mars study contract fosters concept development, risk reduction, and architecture refinement.

Agency

National Aeronautics And Space Administration → Marshall Space Flight Center

NAICS

541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)View NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNational Aeronautics And Space Administration → Marshall Space Flight Center
ContactsNo contacts available
OfficeN/A
Organization / Agency
National Aeronautics And Space Administration → Marshall Space Flight Center
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
An Appendix under NextSTEP-3 for Moon to Mars Architectural Studies that will be managed under the Strategic and Architcture Office (SAO). This Appendix will allow for defined study calls that will be defined by the Mars Architecture Team, Lunar Architecture Team and Preformulation Project Teams within the SAO office and allow for open study calls that allow vendors to proposed studies. These calls will be used to refine requirements and elements within Moon to Mars Architecture. This BAA vehicle will support awards for concept development and possible risk reduction and prototyping.

Similar Contracts

Same NAICS industry code

NAICS: 541715
New
Federal
Onsite Technical Installation and Integration SupportThe contract requires the onsite technical installation, configuration, and integration of an optical processor at the Oak Ridge National Laboratory, with a strict emphasis on compliance with safety regulations and the implementation of comprehensive hazard controls. All work must be performed at the designated facility in Oak Ridge, Tennessee, 37830, and must align with the Department of Energy’s standards for operational safety, engineering integrity, and environmental protection. The subcontractor is responsible for ensuring that every phase of the project, from initial setup to final system integration, adheres to applicable federal and lab-specific safety protocols, including the identification and mitigation of potential hazards associated with the optical processor’s deployment. This is a subcontract solicited under NAICS code 541715 for research and development in physical, engineering, and life sciences, with a response deadline of July 31, 2026. The contract is managed by UT-Battelle LLC, the Department of Energy’s contractor at ORNL, and no set-aside provisions apply. The work demands specialized technical expertise in optical systems, precise integration capabilities, and a documented history of handling sensitive or high-risk equipment within a federally funded research environment. Contractors must be prepared to operate under DOE oversight, coordinate with lab personnel, and deliver all deliverables within the specified timeframe without disruptions to ongoing laboratory operations.
Ornl Ut-Battelle Llc-Doe Contractor

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 541715
New
Federal
Capstone Project Alignment with Defense MissionsThe contract seeks to engage providers who can guide U.S. Naval Academy midshipmen in developing technical capstone projects that directly align with real-world defense missions in artificial intelligence, cybersecurity, autonomy, or logistics. These projects are intended to bridge academic learning with operational needs, ensuring future naval officers are equipped with practical, mission-relevant technical expertise. Work will be performed primarily in Annapolis, Maryland, with the focus on mentoring and supporting student teams through the full lifecycle of their project development, from concept to demonstration. This is a subcontract under NAICS code 541715, which categorizes it under research and development in the physical, engineering, and life sciences. The opportunity was posted on July 24, 2026, with a response deadline of July 29, 2026, and is administered by the Naval Supply Systems Command Fleet Logistics Center Norfolk under the Department of Defense. While specific performance metrics or funding details are not indicated, the emphasis is squarely on delivering high-impact, defense-oriented technical outcomes that enhance the readiness and innovation capacity of the next generation of naval leaders. Participation is open to entities capable of providing expert mentorship and technical oversight in the specified domains.
Navsup Flt Logistics Ctr Norfolk

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 541715
New
Federal
Eye-Tracking and Vehicle Kinematics Data CollectionThe contract involves the collection of field data from drivers at Alternative Intersection and Interchange sites using eye-tracking devices and vehicle kinematics sensors. Responsibilities include recruiting qualified drivers, deploying and Calibrating sensory equipment in real-world traffic environments, and ensuring all collected data is properly anonymized to protect participant privacy. The work requires technical expertise in sensor deployment, data acquisition protocols, and strict adherence to data privacy standards to maintain the integrity and confidentiality of the information gathered. This effort supports research into driver behavior and traffic safety at unconventional intersection designs. The solicitation is classified as a subcontract under NAICS code 541715, indicating it falls within the category of research and development in the physical, engineering, and life sciences. It was posted on July 24, 2026, with a firm response deadline of August 11, 2026, at 3:00 PM. The contracting agency is the Department of Transportation under the 693JJ3 Acquisition and Grants Management office. While specific location details for performance or contact information are not provided, the work is expected to take place across multiple Alternative Intersection and Interchange sites. Participation requires strict compliance with data handling procedures and operational logistics for field research under real traffic conditions.
693JJ3 Acquisition And Grants Mgt

POSTED

2 days ago

DEADLINE

in 16 days
View Details