MULTIPLE AWARD LAN/DLAN SIPR-NIPR BPA
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This Small Business Set Aside contract is a Multiple Award Blanket Purchase Agreement (BPA) for Inside Plant (ISP) structured cabling design, installation, and repair for NIPRNET and SIPRNET physical layer infrastructure. The objective is to modernize and sustain the Department of Defense Information Network (DoDIN) transport architecture across US Army installations supported by the 30th Signal Battalion, Network Enterprise Center, primarily within the USINDOPACOM area of responsibility. The scope is strictly limited to ISP cabling, explicitly excluding all Outside Plant (OSP) infrastructure such as exterior campus cabling, trenching, and manhole work. The contract includes a base period of twelve months with four consecutive twelve-month option periods, with individual task orders competing based on the lowest priced technically acceptable proposal. The contractor must provide all personnel, management, tools, and Contractor-Furnished Material (CFM), ensuring all hardware is listed on the DoDIN Approved Products List. Key personnel requirements include a Project Manager with a technical degree, PMP/BICSI credential, and a SECRET clearance, and a Project Engineer who must be a current BICSI Registered Communications Distribution Designer (RCDD) with a SECRET clearance. Performance is measured by a 95% first-pass acceptance rate for engineering designs and cabling installations. All proposals and invoices must provide fully itemized costs separating labor, hardware, cabling, and ancillary supplies. Work is performed during normal garrison duty hours in Hawaii Standard Time, and the contractor is responsible for all transportation and mobilization expenses under a firm-fixed price structure.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 1 solicitation documentRead every page
- AI contract breakdown13 sections, Uniform Contract Format
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Sources Sought
Organization & Contact Information
Full Description
The contractor shall provide all personnel, management, supervision, tools, testing apparatus, materials, Contractor-Furnished Material (CFM), transportation, and engineering services necessary to perform Inside Plant (ISP) structured cabling design, horizontal cable distribution, and fiber/copper installation, diagnostic troubleshooting, and repair across NIPRNET and SIPRNET physical layer infrastructure. The overarching operational objective is to modernize and sustain Department of Defense Information Network (DoDIN) physical transport architecture across US Army installations supported by the 30th Signal Battalion, Network Enterprise Center (NEC).
CLIN 0001 - Equipment for the installation of NIPR/SIPR requirement.
CLIN 0002 - Services for the installation of NIPR/SIPR requirement.
This posting is to determine the level of vendor interest for this opportunity which following approval/award will have a 5-year ordering period; will compete each requirement with award to lowest priced technically acceptable proposal.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → 0413 Aq Hq Rco-Hi
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
