This Solicitation opportunity from Rhode Island was posted on August 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Mussachuck Creek Corridor Flood Risk Reduction Project Scoping Study
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Town of Barrington is seeking proposals from qualified consulting firms to develop a comprehensive scoping study focused on flood risk reduction for the Mussachuck Creek Corridor, which encompasses waterways within Barrington and the Narragansett Bay watershed, including Echo Lake, Brickyard Pond, and adjacent streams and wetlands. The project aims to analyze the hydrological and hydraulic behavior of the watershed, identify flood impacts, and evaluate various flood mitigation strategies through feasibility assessments. The selected firm will also be responsible for advancing viable options into detailed design and engineering phases, supported by community engagement activities to incorporate public input and ensure community needs are addressed. The solicitation, titled "Mussachuck Creek Corridor Flood Risk Reduction Project Scoping Study," was posted on August 13, 2025, with a deadline for responses set for September 12, 2025. The contract is valued between $100,000 and $500,000 and falls under NAICS code 541330, indicating a professional, scientific, and technical services scope. The project is managed by the Rhode Island-based Town of Barrington, with further details available through the state's purchasing portal. The initiative emphasizes a thorough hydrological investigation, flood impact analysis, development of multiple mitigation options, and active community involvement to support sustainable flood risk management solutions.
General Info
Agency
Place of Performance
RI, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
• An investigation of the hydrological and hydraulic dynamics of the Mussachuck Creek Corridor, delineating this watershed and its sub-watersheds, and evaluating the riverine dynamics of the corridor; • A comprehensive flood impact analysis; • Development of alternative flood mitigation strategies with a feasibility assessment of each; • A comprehensive evaluation of viable options for moving forward to the design and engineering of viable alternative strategies; • Community engagement activities in support of this study.
LINK TO THE RFP: https://www.barrington.ri.gov/Bids.aspx
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
