Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Commerce was posted on March 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NDAA Compliant Drone

Closed
1333ND26QNB190127Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract calls for the procurement and delivery of one National Defense Authorization Act (NDAA) compliant drone for use by the National Institute of Standards and Technology (NIST) at its Gaithersburg campus. The drone must be a current, commercially available model inclusive of a dual-band airframe, smart controller, battery charger, propeller sets, smart batteries, a SAMO payload with thermal imaging and high-resolution camera capabilities, a standard 20MP camera, a hard case, and a triple cradle charger. The package also includes an authorized reseller certificate, a one-year warranty, and optional virtual training. All equipment must be new, original manufacturer’s packaging with documentation, and must comply with strict requirements prohibiting used, remanufactured, prototype, custom, or gray market items. Delivery, installation if applicable, and training are part of the contractor’s responsibilities, with shipment to NIST under FOB destination terms within 30 business days following contract award. The government will conduct inspections, including visual and operational tests to verify performance and condition, with the right to reject or request repair of any damaged or nonconforming equipment at no cost. Ownership transfers to NIST upon acceptance, which is expected within 10 business days of receipt. Contractors must coordinate all shipments with NIST due to restricted site access. The warranty coverage lasts for at least one year post-acceptance, aligning with FAR requirements. Payment will be made upon invoicing and acceptance of the deliverables. The contract is set aside for small businesses and requires compliance with all specified technical, delivery, and quality standards.

General Info

Procurement and delivery of NDAA-compliant drone with warranty, training, and strict compliance to NIST.

NAICS

336411 - Aircraft Manufacturing

Place of Performance

Gaithersburg, MD, USA

Set-Aside

SBA

Documents

1

RFQ 1333ND26QNB190127 NDAA Compliant Drone

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts1 person available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Sasha Bradford

Full Description

Show more

I. BACKGROUND 


The National Institute of Standards and Technology (NIST) require a National Defense Authorization Act (NDAA) compliant drone for use on and near NIST sensitive areas to maintain required arial observation.


II. SCOPE


The Contractor shall deliver a quantity of one (1) NDAA compliant drone. Package shall be inclusive of all specified requirements, destination delivery, installation if applicable, warranty, and training.  DRONE MUST BE CURRENT MODEL AND NOT A DISCONTINUED MODEL.


III. PLACE OF PERFORMANCE


NIST Gaithersburg Campus.


IV. PERIOD OF PERFORMANCE  


One month after contract award.


V. SPECIFIC REQUIREMENTS


The Contractor shall provide a system that meets all technical specifications identified below. All items must be new.  Used or remanufactured equipment will not be considered for award. Experimental, prototype, or custom items will not be considered.  The use of “gray market” components is not authorized for sale in the U.S. by the Contractor and is not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, as applicable.


Item 1 – NDAA Thermal Package Drone with Smart Controller & SAMO Payload


The contractor shall provide: 


    1. 1x Dual-band airframe • 1x Smart controller • 1x Battery charger • 1x Propeller set CCW • 1x Propeller set CW • 5x Smart battery • 1x SAMO payload - 640x512 radiometric + 64MP • 1x Standard CX-GB100 20MP camera • 1x Hard case • 1x Triple cradle charger
      1. Authorized Reseller Certificate
      2. One (1) Year Warranty
      3. Virtual Training (As Requested)

VI. GENERAL REQUIREMENTS


Government Responsibilities


Deliver and pick up fire apparatuses to/from the vendor. 


Upon award of this requirement, the Government will provide the Contractor with all access to all equipment and resources needed in the performance of this requirement.   


Inspection & Acceptance 


In addition to the inspection and acceptance terms articulated in the specific FAR clause 52.212-4. The Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.  


Performance Tests: 


  1. Operational Tests 

NIST may choose at its discretion to forgo this part of acceptance testing. 


A visual inspection of the equipment will be performed by the NIST POC to identify surface defects or any form of indication that any equipment was damaged during transport to NIST.  The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government.  The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance.  The vendor is responsible for latent defects discovered any time after final inspection.  However, the extent of its liability shall be prorated over the useful life of the equipment.    


Ownership of the equipment shall be transferred to NIST upon acceptance by the Government.   


The Government will test, inspect, and accept or reject the equipment within 10 business days of receipt of the equipment unless otherwise indicated above.  The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications.  It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.  


Delivery Terms


Delivery shall be F.O.B Destination and shall occur in accordance with the delivery due dates provided in the below deliverable table.


FOB Destination means:  The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery.


The contractor shall deliver all Line Items to:


National Institute of Standards and Technology


Gaithersburg, MD 20899 


(Further POC and Delivery Details provided upon award)


***Due to ongoing limited site access of the NIST facilities, the Awardee SHALL confirm with the Designated Government Official and the Contracting Officer prior to ANY shipment to NIST***


VII.  SCHEDULE OF DELIVERABLES 


Deliverable: One (1) Drone inclusive of the following specifications, to include additonal services:


  • 1x Dual band airframe
  • 1x Smart Controller
  • 1x Battery charger
  • 1x Propeller set CCW
  • 1x Propeller set CW
  • 5x Smart battery x SAMO payload - 640x512 radiometric + 64MP
  • 1x Standard CX-GB100 20MP camera
  • 1x Hard case
  • 1x Triple cradle charger
  • Authorized Reseller Certificate
  • One (1) Year Warranty
  • Virtual Training (As requested)
  • Delivery- Within 30 business days of award

Standards of Acceptance: The NIST POC or COR shall review all the above deliverables and respond with an acceptance or request for revision email to the Contractor Point of Contact (POC) within 3 days of receipt of deliverable. This section applies to deliverables which must be reviewed and approved for acceptance.


Warranty: The contractor shall warrant the entire system for a period of a minimum of one year (1 year) after receipt of the equipment and shall be in accordance with terms in FAR 52.212-4. Warranty shall commence upon acceptance of the system by the Government.


VIII. PAYMENT SCHEDULE


The Contractor will be paid, in accordance with the payments clause in the contract and upon receipt of a proper invoice and acceptance of deliverables.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS