This Solicitation opportunity from North Carolina was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Neuse River Resource Recovery Facility - 2K AST Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the removal of an existing 2000-gallon aboveground storage tank (AST) and the installation of a new 2000-gallon UL 2085 Fireguard double-walled AST at the Neuse River Resource Recovery Facility. The scope includes the installation of 3-inch fill piping to enable remote filling, product piping, and the connection of a Wayne fuel dispenser, which will be supplied by the customer, to the existing fuel controller system. All debris generated during the removal and installation process must be hauled away and properly disposed of. The solicitation is issued by the City of Raleigh, North Carolina, with a response deadline set for June 23, 2026. The contract primarily requires equipment and labor services and is categorized under state and local government operations. Patrick Barbour is listed as the primary point of contact for this project, which aims to upgrade fuel storage infrastructure to meet enhanced safety standards.
General Info
Agency
NAICS
Place of Performance
NC, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from North Carolina → City of Raleigh
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
