Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

New Fiscal Year (FY) 25 Pavement Rehabilitation Project (CIP AID00005)

Forecast
2024-001154State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The New Fiscal Year (FY) 25 Pavement Rehabilitation Project (CIP AID00005) is a street resurfacing and reconstruction initiative managed by the City of San Diego. The project authorizes the use of City Forces for work exceeding the 500,000 dollar threshold established by San Diego Municipal Code section 22.3105, with a total authorized expenditure not to exceed 4,600,000 dollars. The scope of work involves mill and pave operations across various street segments located within Council Districts 1 through 9, covering multiple community planning areas including College Area, Kearny Mesa, La Jolla, Mira Mesa, and Old Town San Diego, among others. All project activities are restricted to public rights-of-way or previously disturbed nonsensitive areas. To ensure environmental and operational compliance, the project requires the implementation of Traffic Control Plans and Stormwater Best Management Practices to prevent non-stormwater discharges from entering the city conveyance system. The project is categorized as exempt under CEQA Guidelines Sections 15301(c) and 15302, as it involves the replacement or reconstruction of existing facilities. Administrative oversight is provided by the City of San Diego Transportation Department.

General Info

City of San Diego FY25 street resurfacing project with a 4.6 million dollar budget.

Place of Performance

San Diego, CA

Set-Aside

not_applicable

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The proposed action will allow the use of City Forces exceeding the $500,000.00 threshold defined by the San Diego Municipal Code § 22.3105 to complete the new FY2025 Transportation Mill & Pave project within CIP AID00005, Street Resurfacing and Reconstruction. The proposed action will also allow for the expenditure of funds not to exceed $4,600,000.00 from CIP AID00005, Street Resurfacing and Reconstruction, for City Force Work related expenses for CIP AID00005, Street Resurfacing and Reconstruction associated with the new FY2025 Transportation Mill &' Pave project within CIP AID00005, Street Resurfacing and Reconstruction. The planned street segments for this project are outlined in Exhibit A. All work would occur within the public right of-way (paved streets) or previously disturbed nonsensitive areas only. Storm water Best Management Practices (BMPs) to prevent non-stormwater discharges from entering the City's stormwater conveyance system, as well as Traffic Control Plans (TCPs), will be implemented throughout construction.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
2027030
Solicitation # 2027030
Spartanburg County Government is soliciting proposals for the New Cut Road Intersection Improvements at Mount Zion and Blackstock Roads under RFP 2027030. The project involves comprehensive roadway realignment and infrastructure updates, including grading, drainage installation, and the application of hot mix asphalt surface and intermediate courses. All construction must adhere to the latest SCDOT Standard Specifications and Drawings, with specific requirements for thermoplastic pavement markings and strict compliance with the Manual on Uniform Traffic Devices and the SCDOT Work Zone Traffic Control Manual. The project has a specified completion deadline of October 31, 2027, and requires the prime contractor to be SCDOT approved. The contract will be awarded to the responsive and responsible proposer based on a weighted evaluation of cost at 80 percent and compliance with proposal requirements at 20 percent. This is a unit price bid covering all labor, materials, and equipment. Selected contractors must provide a one-year written warranty for materials and workmanship and maintain insurance as required by the county. Administrative terms include a 60-day proposal validity period, a drug-free workplace requirement per South Carolina law, and a five-year record retention policy for audits. Payment is made from appropriated funds, with undisputed invoices due upon receipt and considered past due after 30 days.
Spartanburg County Government

POSTED

about 3 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes from qualified asphalt paving contractors for the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. This request is specifically for bidding purposes to help the prime contractor prepare their project bid. The scope of work includes asphalt pavement replacement, restoration, milling, removal, and the placement of surface and binder courses. Additionally, contractors will be responsible for pavement patching, trench restoration, hauling, compaction, and the application of tack coats, along with other incidental asphalt-related tasks necessary for project completion. Interested parties must submit their proposals by November 27, 2026. Submissions should include company contact information, itemized pricing for the asphalt work, equipment and workforce availability, and evidence of relevant experience with municipal sewer, utility, and roadway restoration projects. While all contractors are encouraged to apply, there is a strong emphasis on participation from SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses, as well as DBE and MBE certified firms. Project plans and specifications are available upon request, and a quick payment agreement will be included.
D.R. Phillips, LLC

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additionally, the project requires surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services like storm water pollution prevention. Required materials range from ready mix and precast concrete to manhole materials and various valves and gaskets. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. The response deadline is December 16, 2026, and interested parties should coordinate through Lead Estimator Ken Johnston via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Napa County Near Calistoga At No Name Creek Bridge
Solicitation # 04-2J88U4
The California Department of Transportation has issued solicitation 04-2J88U4 for construction work on the State Highway in Napa County near Calistoga at the No Name Creek Bridge. With an estimated project cost of 880,000 USD, the scope of work focuses on bridge scour repair, including the use of shotcrete for scour holes and partially grouted rock slope protection. Additional requirements include the installation of a Midwest Guardrail System, culvert cleaning, structure excavation, and extensive landscaping and erosion control involving hydroseeding, fiber rolls, and soil amendment. The project also necessitates the removal of existing guardrails and thermoplastic traffic stripes, which are handled as hazardous waste. Performance is subject to strict environmental and regulatory constraints, including a restricted work window within creek channels from June 15 to October 15. Contractors must comply with prevailing wage laws and meet a 5 percent goal for both Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation. Technical standards require that temporary concrete barriers be fabricated at authorized facilities and that local materials meet specific pH and lead concentration limits. Administrative requirements include the submission of a baseline schedule, weekly working days reports, and electronic payroll records via LCPtracker Pro. Bids are due by December 15, 2026, and must be submitted on a unit price basis.
California Department of Transportation

POSTED

about 4 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
NHANG PEASE AIR NATIONAL GUARD BASE – PAVEMENT REPAIRS
Solicitation # RFB-DMAVS-2027-05
The New Hampshire Department of Military Affairs and Veteran Services is soliciting bids for pavement repairs at the NHANG Pease Air National Guard Base, specifically targeting the Building 158 roadway, the Contract Gate, and the Building 145 parking lot. The project requires the contractor to provide all necessary materials, tools, and safety devices to ensure smooth, stable, and properly compacted pavement with positive drainage and safe transitions. Key deliverables include a proposed work schedule, traffic-control and quality-control plans, asphalt mix-designs, and comprehensive closeout documentation including a marked repair-area plan and warranty information. Award eligibility is based on the lowest cost among vendors who meet the established criteria, including having a completed Vendor Application Package on file with the NH Bureau of Purchase and Property, meeting Federal System for Awards Management (SAM) requirements, and providing proof of comprehensive general liability insurance. The contract is governed by State of New Hampshire Form P-37 and modified by Exhibit A, requiring both performance and payment bonds equal to the contract price. Compliance with the Davis-Bacon and Related Acts, the Buy America Preference, and various federal non-discrimination statutes is mandatory. Payments are processed monthly via bank draft or electronic funds transfer, with a 5% retainage deducted from partial estimates until final project completion. Bids must be submitted by December 14, 2026.
Department Of Military Affairs & Veteran Services

POSTED

about 4 hours ago

DEADLINE

in 27 days
View Details

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 541380
New
SLED
Midway Rising Specific PlanThe Midway Rising Specific Plan is a comprehensive redevelopment project managed by the City of San Diego to transform approximately 49.23 acres of City-owned property, including the current Sports Arena site, into a transit-oriented mixed-use community village. The project involves significant regulatory actions, including a General Plan and Community Plan Amendment, rezoning from Community Commercial-Residential to Mixed-Use Residential, and the adoption of a Specific Plan to establish development standards and architectural guidelines. The buildout is designed to accommodate approximately 4,254 housing units, including up to 2,000 affordable units, alongside 130,000 square feet of commercial space and a multi-purpose Entertainment Center. The plan also integrates approximately 8.12 acres of parks and extensive public open space, supported by critical infrastructure upgrades to water, sewer, storm drains, roadways, and transit facilities. Extensive environmental and technical assessments have been conducted to support the project's implementation and ensure compliance with the California Environmental Quality Act (CEQA). These studies address diverse factors such as geotechnical stability, including liquefaction hazards; environmental site assessments for soil and groundwater contamination; and air quality and greenhouse gas impacts. Transportation analyses, including Vehicle Miles Traveled (VMT) and local mobility studies, have been performed to mitigate impacts on the regional network, while noise, biological resource, and cultural resource reports provide frameworks for managing unavoidable environmental effects. The project is subject to various regulatory overlays, including airport land use compatibility, coastal height limitations, and transit priority zones, and requires careful management of hazardous materials and waste as part of its large-scale urban redevelopment.
Testing Laboratories and Services

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 611110
SLED
Avion PropertyThe City of San Diego has issued a Conditional Use Permit for the construction of The Cambridge School, a private Pre-K through 12th grade campus located on a 6.52-acre site at the southwest corner of Camino Del Sur and Coyote Bush Drive. The development features a 182,868 square-foot three-story classroom building, a 10,904 square-foot one-story multipurpose building, and a track and sports field. Parking is provided via a semi-subterranean two-level structure containing 345 spaces and 41 surface spaces, totaling 386 parking spots. The project is situated within the Black Mountain Ranch Community Plan Area, specifically in the CC-4-5 base zone and the Urban Village Overlay Zone. Comprehensive environmental and technical evaluations have been conducted to ensure compliance with CEQA and local standards. Key assessments include a geotechnical investigation for site preparation, a Phase I Environmental Site Assessment identifying potential agricultural pesticide residues, and a hydrology report confirming that post-development runoff will not exceed pre-development rates. The project has undergone air quality, noise, and waste management analyses, as well as a local mobility and Vehicle Miles Traveled assessment. While the VMT assessment identified significant impacts, mitigation is planned through the City of San Diego Complete Communities: Mobility Choices Program. Additionally, the project includes paleontological monitoring to mitigate impacts on high-sensitivity resources.
Elementary and Secondary Schools

POSTED

7 days ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS