The contract entails extending the demising wall of Building 1 Wing 6 vertically up to the structural concrete deck above to close a 2 to 3.5-foot gap and to provide thermal and mechanical isolation between Wing 6 and the Spine corridor. The scope includes sealing both current and abandoned penetrations with fire-rated materials, particularly where the wall separates the Women’s restroom from the Spine corridor. An optional portion of the project may involve reconstructing storage room #4089, installing hollow metal door frames and doors equipped with security hardware, sealing additional penetrations with fire-rated sealant, adding fire sprinkler protection as necessary, installing interior lighting, and placing interior signage that meets NIST standards. The contractor is responsible for supplying all labor, materials, site protection, debris removal, and coordination to ensure the project complies with NIST's campus safety and construction standards. Key deadlines include the submission of a list of individuals attending the site visit by June 30, 2026, with the site visit scheduled for July 2, 2026, at 1:00 PM in front of Building 1. Questions regarding the project must be submitted by July 6, 2026, and proposals are due by July 15, 2026. This opportunity is designated as a Total Small Business Set-Aside under NAICS code 236220, and the work will be performed in Boulder, Colorado. Points of contact for the project include Lauren Lopez and Travis Zoellner from the Department of Commerce’s NIST office in Gaithersburg, Maryland.
General Info
Agency
NAICS
Place of Performance
Boulder, CO, 80305, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The project consists of extending the Building 1 Wing 6 demising wall vertically to the structural concrete deck above to eliminate a 2–3.5 ft gap and thermally and mechanically isolate Wing 6 from the Spine corridor. Work also includes sealing penetrations and abandoned penetrations with fire‑rated materials where the wall separates the Women’s restroom from the Spine corridor. An optional scope may include reconstructing storage room #4089, installing hollow metal door frames and doors with security hardware, sealing wall penetrations with fire-rated sealant, providing additional fire sprinkler protection as required, installing interior lighting, and installing NIST-standard interior signage. The contractor will provide all labor, materials, site protection, debris removal, and coordination required to complete the work in accordance with NIST campus safety and construction requirements.
Important Dates:
List of Individuals due for Site Visit: June 30, 2026
Site Visit: July 2, 2026 @ 1:00 PM in front of Building 1
Questions Due: July 6, 2026