NON-FEDERAL
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Choctaw Nation Housing Authority is soliciting bids for a bathroom modification project in Broken Bow, Oklahoma, to install a walk-in shower for a resident with mobility issues. The scope of work includes removing the existing tub and shower and replacing them with a low-entry shower base and a surround of at least 1/4 inch thickness, specifically excluding FRP. The installation must include a new mixing valve and handle, three ADA grab bars, a portable seat, and an adjustable height handheld shower faucet with a separate guide rod. The contractor is responsible for all necessary repairs to drywall, trim, flooring, and paint resulting from the installation. All work must meet or exceed 2019 IRC standards, and the contractor is responsible for obtaining permits, performing line locates, and managing all waste removal and yard restoration. Prospective contractors are required to visit the site before bidding, as change orders for conditions identifiable during a visit will not be approved. Bids must be submitted by September 3, 2026. The project is managed by Carla Grimmett and inspected by Corey James, with all final color selections to be determined by the homeowner or property manager.
General Info
Agency
NAICS
Place of Performance
Broken Bow, OK, 74728, USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Special Instructions: Home is a 3-bed 2 bath, brick home approx. 1500 sq. ft. shingle roof. Slab on grade. Property Manager- Carla Grimmett 580 642 6035 Inspector- Corey James 580 317 7088 All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved.
Plumbing: Remove and replace tub/shower. Install new low entry shower base and surround, with Swan-Stone or comparable, must be a minimum of 1/4” thickness. Replace shower handle and mixing valve with Delta or comparable. Install 3 ADA grab bars, adjustable height handheld shower faucet with its own adjustable guide rod apart from the grab bars. and portable seat. FRP will not be accepted as a tub/shower surround. Repair/replace any all drywall, trim, sub and finish flooring, and paint needed due to repairs.
Special Instructions: All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.
Similar Contracts
Same NAICS industry code
More opportunities from Oklahoma → Choctaw Nation Housing Authority
Same awarding agency
