Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Commerce was posted on July 19, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nonpersonal services for repair and maintenance on two air sampling towers including trenching, installation of conduit, cable and load center for electrical power. See Scope for complete requirement.

Awarded
NRMJ10002300746SRGFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Installation of Buried Fiber Optic Cable Stanton North Substation to Hoskins Substation
Solicitation # 26085
The Nebraska Public Power District is soliciting bids for Request for Bid No. 26085 to install approximately six miles of underground fiber optic cable between the Stanton North and Hoskins Substations in northeast Nebraska. The scope of work encompasses all labor, materials, and supervision required for staking, material coordination, property owner contacts, and right-of-way restoration. Specifically, the contractor will install 48-strand buried fiber optic cable provided by the contractor and 48-strand all-dielectric fiber provided by the District. The project must adhere to RUS Form 515a and IEEE Standard 1333-1994 for guided boring. Work is expected to be awarded by November 25, 2026, with a final completion deadline of April 15, 2027. Bids are due by November 13, 2026, and must include a completed pricing spreadsheet and current all-inclusive equipment and labor rates. Evaluation factors for the award include quoted price, conformance with specifications, past schedule performance, and the bidder's financial responsibility and experience. To qualify, bidders must certify the completion of at least three similar buried fiber optic installation projects within the last five years. Payment terms specify that 95 percent of the price is paid within 30 days of acceptable performance, with 5 percent retained until final acceptance. An optional pre-bid teleconference is scheduled for November 5, 2026, to review contract specifications.
Nebraska Public Power District

POSTED

about 12 hours ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback
Solicitation # W9126G27R1CSY
The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice for the B-21 Utilities and Site Improvements project at Dyess Air Force Base, Texas. This initiative aims to establish high-reliability primary electrical power distribution and dedicated fiber-optic communications infrastructure to support the bed-down of the B-21 weapons system. The scope includes the installation of single-mode fiber optic cables, telephone system expansion, power cabling in concrete encased ducts, pole-mounted conductors, and associated transformers and switchgear. The project also encompasses site improvements such as earthwork, grading, and erosion control. The estimated Construction Cost Limitation is $28,550,000, though an $8 million electric substation and specific end-user network equipment are expressly excluded from this contract. The government is currently evaluating whether to utilize a traditional Federal Acquisition Regulation based contract or an Other Transaction Agreement under 10 U.S.C. section 2808a. If a collaborative procurement framework is chosen, a two-phase selection process will be implemented, focusing first on technical capability, past performance, and collaborative execution history, followed by an evaluation of final technical and price proposals. The project must adhere to strict Department of Defense standards, including UFC 1-200-01 for general building requirements, UFC 4-010-01 for antiterrorism, and UFC 4-010-06 for cybersecurity of facility-related control systems. The anticipated period of performance is 690 calendar days from the notice to proceed, with a required beneficial occupancy date of March 8, 2030.
W076 Endist Ft Worth

POSTED

about 13 hours ago

DEADLINE

in 14 days
NAICS: 237130
New
SLED
De Palma Road Electrical Conduit Installation Project
Solicitation # TLARC-819
The County of Riverside is soliciting bids for the De Palma Road Electrical Conduit Installation Project (Project No. D4-0072) located in the Community of Horsethief Canyon, California. The project involves the excavation and backfill of approximately 1,000 feet of trenching, the installation of 685 feet of 1.5-inch and 350 feet of 3-inch electrical conduit and handholes, and the installation of 6-inch Type D concrete curb per County Standard No. 204. All work must adhere to Southern California Edison plans and be completed within 30 working days from the commencement date specified in the County's written order. The estimated project cost is 209,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals by December 2, 2026, at 1:30 P.M. Pacific Time, including a non-collusion declaration and a bid guarantee of 10 percent of the total bid. The awarded contractor must provide performance and payment bonds, comply with California State Labor Code prevailing wage requirements, and adhere to specific affirmative action plans based on contract value and employee count. Payments will be made monthly, with the Owner paying 90 percent of the value of labor and materials incorporated into the work and 75 percent of materials stored on site, subject to certification by the Architect.
COUNTY OF RIVERSIDE

POSTED

about 18 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Installation Of Street Lighting On Raymond Avenue From Maple Street To North City Limits
Solicitation # 2026-IFB-CIV-0549
The City of Pasadena Department of Public Works is soliciting bids under solicitation number 2026-IFB-CIV-0549 for the installation of a new street lighting system on Raymond Avenue, extending from Maple Street to the North City Limits. The project requires the contractor to furnish and install concrete street lighting standards, foundations, LED luminaires and fixtures, conduits, conductors, pull boxes, and other appurtenant work. Key technical deliverables include 29W or 50W LED replacements, galvanized steel conduits, and 6 foot Type S Scroll Arms. The contractor must provide all necessary labor, materials, and equipment, ensuring compliance with the ADA, CBC, Title 24, and PROWAG accessibility guidelines. Bids must be submitted electronically via the City of Pasadena eProcurement Portal by 2:00 pm on November 17, 2026. Qualified bidders must provide evidence of experience with two similar governmental projects and submit several mandatory documents, including Form AA-1, Form AA-2 for labor exceeding 25,000 dollars, a non-collusion declaration, and a DHS contract disclosure. A bid security of five percent of the total bid price is required, and the successful awardee must provide material and faithful performance bonds for 100 percent of the base bid. Work must commence within 15 calendar days of the Notice to Proceed and be completed within 20 working days. Invoicing is handled through the city's Vendor Invoice Portal, with payments issued on Tuesdays and Thursdays.
City of Pasadena Department of Public Works

POSTED

about 18 hours ago

DEADLINE

in 19 days
NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work requires the contractor to provide all labor, supervision, equipment, and miscellaneous materials to replace all structures, conductors, shield wires, and hardware. Key technical deliverables include the installation of 28 wood H-Frame tangent structures and one tubular steel monopole dead-end on a drilled pier, upgrading the conductor to 954 kcmil 45/7 ASCR Rail, and installing 0.551 diameter fiber optic ground wire and EHS steel shield wire. The project also involves tree clearing, site preparation, and the removal of existing structures and conductors. Bids are due by 2:00 p.m. CST on December 2, 2026, and must be submitted as sealed hard copies to the Procurement Department in Columbus, Nebraska. The award will be based on the lowest cost and best bid, with evaluation factors including technical conformance, schedule capability, financial standing, and past performance history. Prospective bidders are encouraged to attend an optional pre-bid teleconference and site visit on November 23, 2026. Required submission documents include a signed proposal page, a completed price quotation table, a W-9 form, and bid security in the form of a certified check, irrevocable letter of credit, or bid bond. The successful contractor must provide a performance bond and maintain workers compensation and commercial general liability insurance.
Nebraska Public Power District

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The National Oceanic and Atmospheric Administration Global Monitoring Laboratory requires nonpersonal services for the repair and maintenance of two air sampling towers located in Moody, Texas, and Byers, Colorado. The project involves tower climbs at both sites to ensure air sample tubing lines are secure and leak-tight, with maximum equipment heights reaching between 1,000 and 2,000 feet above ground level. At the Texas tower, the vendor will replace existing tubing lines and perform preventative maintenance. At the Colorado tower, the vendor will install new tubing lines and mount filter boxes at three specific levels. In addition to the tower climbs, the Colorado site requires trenching and the installation of a 200-amp electrical service run of approximately 105 feet, including conduit, cable, and a load center to power a sea-container. The vendor must also install two NMEA 14-50R receptacles and exterior-rated lockable enclosures on the container. While NOAA provides the tubing and filter materials, the vendor is responsible for all climbing equipment and electrical supplies. The project is a total small business set-aside with an estimated magnitude between 25,000 and 100,000 dollars and a completion deadline of October 31, 2023.

General Info

Contract Value

$87,796.33

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Moody, TX, 76557, USA

Set-Aside

SBA

Award Issued Date

Documents

3

Amendment 0005 - Construction SAM.GOV posting

DOCX, High priority: read this first44 pages · amendment
High

Steel Data Report - Acquisition 0471-001 (Moody, TX)

PDF, High priority: read this firstspecifications
High

scope+attachment+mapping+NRMJ10002300746.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 28, 2023 to Aug 10, 2023. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Noaa
Contacts1 person available
OfficeSEATTLE, WA, 98115, USA
Organization / AgencyDepartment Of Commerce Noaa
Office AddressSEATTLE, WA, 98115, USA
Contacts
SUZANNE ROMBERG-GARRETT

Full Description

Show more
AMENDMENT 0005 7/19/2023 This amendment extends the quote due date to August 10, 2023. THIS CHANGES quantity of one to quantity of two: The electrician shall install two (new) NMEA 14-50R receptacle and exterior rated lockable enclosure on the outside of the sea-container. AMENDMENT 0004 7/11/2023 to add Q&A responses: QUESTION #1: At the Colorado site, will the electrical service feed need to be installed after the tubing installation? ANSWER #1: No, the electrical feed should be installed first, so that we have power to the site when conducting the leak test after the tubing install. AMENDMENT 0003 7/10/2023 to add Q&A responses: QUESTION: Amendment 1 indicates that there are photos attached. Having downloaded the available documents, I don't see any photos. Can you please provide those? One attachment is labeled pictures, but is more drawing than picture and the other is a picture of the Colorado area from the website. Again, more snippet than picture. Please open attachment as picture/drawings/snippet does not insert. ANSWER: FOR COLORADO Address listed in scope is in Arapahoe County, but the tower is sitting in Adams County. Both Davis Bacon WD have been pulled and inserted in the solicitation and will be put in the award. AMENDMENT 0002 7/7/2023 to add Q&A responses: QUESTION #1: Firstly, the SOW indicates the potential requirement of replacing some or all of the lines at the WKT tower. In order to formulate an accurate bid, we would appreciate further details regarding previous troubleshooting attempts. Could you direct us to the appropriate party who could provide such information? ANSWER #1: We plan to replace all of the old tubing lines with new lines at the WKT tower. Troubleshooting would involve capping the line at the inlet while we run a 15-minute pressure test on the line. With new tubing lines, the leak testing/ troubleshooting should be more or less a formality and with 99% certainty pass a troubleshooting leak test. QUESTION #2: Next, we have inferred from preliminary analyses that the SOW might exceed $100,000, including troubleshooting, repair or replacement, as well as the new installation at the CAO tower. ANSWER #2: Your question is not wholly accurate. The magnitude on page 31, FAR 36.204 listed is (b) Between $25,000 and $100,000. QUESTION #3: We are curious if it would be feasible to separate the civil and tower components of this project, notwithstanding their being awarded as a unified package? ANSWER #3: Not at this time, but if something changes that will be posted on the sam.gov site under an amendment. QUESTION #4: In terms of the logistics, we wish to confirm whether there are any restrictions on using trenching equipment within the compound for power run installations. Alternatively, should we plan for the work to be accomplished via manual digging? ANSWER 4: There should be no restrictions for trenching equipment. Other than avoiding an existing communication line that it will need to cross. That short section (on the order of a foot or 2) might need to be manually dug. ANSWER #4: There should be no restrictions for trenching equipment. Other than avoiding an existing communication line that it will need to cross. That short section (on the order of a foot or 2) might need to be manually dug. QUESTION #5: We would also be keen to discuss testing protocols and timelines with the designated GML contact. Could you please furnish us with the appropriate contact details? ANSWER #5: On page 33, the scope has the due by date of 10/31/2023. Your company would need to meet this timing. Provide your exact questions. The Government will not unfairly give more information or less information to vendors. Please feel free to ask more specific questions about testing protocols (also, see answer #1). The only testing will be leak testing. With the new installation of equipment, I anticipate testing to only take 3 hours of time for the complete installation. The majority of time will involve installation of the tubing and securing it to the conduit runs on the tower with hose clamps and zip ties. At the Texas tower, I would estimate removing old tubing lines to take a couple days. Installation of the new tubing I would estimate to take 3 to 4 days. QUESTION #6: Furthermore, could you provide the distance for the 50 Amp (220v) service run? ANSWER #6: The service is actually 200-amp service and the run is approximately 105 feet. QUESTION #7: Finally, we are considering the placement of a 200A load center outdoors to feed the existing internal panelboard, thus providing an external disconnect with available breaker spaces. Would this arrangement be permissible under the project guidelines? ANSWER #7: Yes, I believe this would work - jdk AMENDMENT 0001 7/5/2023 to add Q&A responses: QUESTION 1: SKU for equipment (air sample tubes, inlet boxes, etc.) ANSWER 1: I cannot find the SKU for the Synflex tubing. It is available from numerous vendors and web searches SYNFLEX 1300-08603, Description 1300-08603 TUBING; 1/2" OD .062" WALL THK 250' L BLACK. It weights approximately 17 lbs. per 250 feet. The tubing comes in 250-foot rolls that are joined at the time of installation with Swagelok 1/2" compression fitting unions at the time of installation inlet boxes Here are the Digikey part numbers for the big 3 filter boxes: Box: 377-1024-ND, Lid: 377-1053-ND QUESTION 2: Heights of tubing, inlet boxes, and conduit runs that are currently on the tower and ones that need to be installed in Texas ANSWER 2: At the Texas tower, tubing runs from a trailer to the ice bridge (approx. 100 feet), and on the bottoms side of the ice bridge (~150 feet length), then up the tower to the inlets (2 runs to each height, and 3 to the top height). With inlet boxers at 30, 100, and 450 meters AGL. At the Colorado tower the tubing will go from the modified shipping container right at the base of the tower with 2 lines running to 30meters, 100meters and 3 lines to 550 meters on the tower QUESTION 3: Any drawings of the towers in Texas and Colorado that are available ANSWER 3: Some Drawings are attached. See Pinnacle Tower Specs attachment (added in amendment 0001). QUESTION 4: Any pictures of the towers and the equipment that will be installed and removed ANSWER 4: Some pictures are attached. Questions about pictures are welcome TWO LOCATIONS "ALL OR NONE" MOODY, TX AND BYERS, CO. GOVERNMENT NOAA/GML Responsibilities: To provide required materials, equipment, and technical guidance for all inspections and testing; All supplies required for installation of tubing and inlet filters (tubing, clamps, zip ties, enclosures and associated tools) will be supplied by NOAA-GML. NOAA staff will advise on leak testing procedures and will initiate a vacuum to pull air through the tubing from the base of the tower, after climber has capped the tubing line. PURPOSE: The National Oceanic and Atmospheric Administration (NOAA) Global Monitoring Laboratory (GML) maintains atmospheric air trace gas measurement and sampling equipment on tall-towers for long-term atmospheric studies. The two towers are Texas (WKT) Tower Climb and Colorado (CAO) Tower Climb. The purpose is to complete two tower climbs (one at WKT tower in Texas, and one at CAO tower in Colorado), and to complete trenching and install conduit, cable and a load center for electrical power needs at the CAO tower in Colorado. The tower climbs are necessary to assure that inlet tubing lines are secured and leak tight to allow air sampling and measurements from multiple heights on the towers - the maximum height for equipment on the towers will be between 1,000 and 2,000 feet above ground level. The electrical is necessary to power a NOAA sea-container at the base of the CAO tower in Colorado, that will house the air trace gas measurement and sampling equipment. Timing will be dependent upon weather or scheduling factors. Lee D. (site manager) has provided written permission for the proposed work to be completed at the site (email correspondence attached). NOAA personnel should be on site while the work is being performed, so work must be scheduled to accommodate the time frame when NOAA personnel can provide access to the site. Work shall not be considered to be complete until appropriate conditions of the permit have been met and inspector has signed off on the installation. MANDATORY REGISTRATION: The vendor of award will be required to register with the Crown Castle National Call Center at +1 (555) 000-0000 for the Moody Texas tower. TECHNICAL SPECIFICATIONS: Texas (WKT) Tower Climb: Replace existing air sample tubing lines on the WKT tall-tower Vendor Responsibilities: The existing GML equipment on the tower includes air sample tubing lines that are secured to a conduit run on the tower. The tubing lines and other equipment on the tower need to be inspected and if compromised repaired or replaced. We expect that some or all tubing lines will need to be replaced in this case due to some preliminary troubleshooting we have done remotely. GML requires a tower crew to assure that all GML equipment (air sample tubing, inlet boxes, etc.) is installed and mechanically and electrically secure, that the air sample tubing is leak-tight (see below), and to carry out simple preventative maintenance and repairs for this equipment (e.g., replace air inlet line filters, replace failed clamps, fittings, tubing, and cabling). The leak testing procedure requires a tower climber to cap the tubing line on the tower and wait approximately 15-30 minutes while a vacuum is pulled and pressure is monitored on the line by NOAA staff at the base of the tower. The work will be scheduled in advance with the GML Technical Contact, and GML personnel will be on-site at all times to consult and oversee these activities NOAA/GML and Vendor Responsibilities: To provide required materials, equipment, and technical guidance for all inspections and testing; All supplies required for installation of tubing and inlet filters (tubing, clamps, zip ties, enclosures and associated tools) will be supplied by GML. GML staff will advise on leak testing procedures and will initiate a vacuum to pull air through the tubing from the base of the tower, after climber has capped the tubing line. The supplies required for installation of the tubing and inlet filters (tubing, clamps, zip ties, enclosures and associated tools) will be supplied by NOAA-GML. Climbing equipment needed for the tower climbs will be supplied by the vendor, and for the Colorado electrical all electrical supplies will be provided by the vendor. Colorado (CAO) Tower Climb: Install new air sample tubing lines and mount filter boxes on the CAO tall-tower. Vendor Responsibilities: The GML equipment to be installed on the tower include air sample tubing lines that will be secured to a conduit run or tower leg (or other appropriate structure) on the tower, and filter boxes to be mounted at three identified levels on the tower (~30, 100, and 540 meters). The tubing lines and other equipment to be installed on the tower will need to be inspected during and after installation and if compromised, repaired or replaced. GML requires a tower crew to assure that all GML equipment (air sample tubing, inlet boxes, etc.) is installed and mechanically and electrically secure, that the air sample tubing is leak-tight (see below), and to carry out simple preventative maintenance and repairs for this equipment (e.g., replace air inlet line filters, replace failed clamps, fittings, tubing, and cabling). The leak testing procedure requires a tower climber to cap the tubing line on the tower and wait approximately 15-30 minutes while a vacuum is pulled and pressure is monitored on the line by NOAA staff at the base of the tower. The work will be scheduled in advance with the GML Technical Contact, and GML personnel will be on-site at all times to consult and oversee these activities

More opportunities from Department Of Commerce Noaa

Same awarding agency

NAICS: 561210
New
Federal
Fairbanks Command and Data Acquisition Station (FCDAS) for Operations and Maintenance Services
Solicitation # 1332KP26R0041
Solicitation 1332KP26R0041 is a Request for Proposal issued by the Department of Commerce NOAA for operations and maintenance services at the Fairbanks Command and Data Acquisition Station in Alaska. This performance-based service contract is 100 percent set aside for small business concerns and covers a National Critical Asset that requires 24x7x365 operational availability. The scope of work includes ground systems operation, facilities maintenance, IT support, security guard services, and property management to support an average of 135 satellite contacts per day. The contract structure consists of a base period from June 1, 2027, through May 31, 2028, with four optional one-year extension periods, utilizing a mix of firm-fixed-price and time-and-materials CLINs. The government will award the contract using a best value tradeoff process, evaluating technical approach, management approach, and past performance, which combined are approximately equal in importance to price. Offerors must hold an active facility clearance with the Defense Counterintelligence and Security Agency and comply with specific Collective Bargaining Agreements and Department of Labor wage determinations. Following Amendment 2, the proposal submission deadline is November 19, 2026, and the technical library access request deadline is October 28, 2026. Proposals must be submitted via email and include specific volumes for technical, management, and past performance evaluations, with the management approach being assessed through both a written proposal and an oral presentation.
Facilities Support Services

POSTED

about 13 hours ago

DEADLINE

in 21 days
View Details
NAICS: 483114
New
Federal
Hawaii National Marine Sanctuary Vessel Charter Services
Solicitation # 26-3064
The National Oceanic and Atmospheric Administration is conducting market research via a Sources Sought Notice to identify small business sources for vessel charter services supporting the Office of National Marine Sanctuaries. The requirement focuses on resource protection and monitoring missions within the Northwestern Hawaiian Islands, specifically supporting the Papahānaumokuākea National Marine Sanctuary. The anticipated contract will be an Indefinite Delivery-Indefinite Quantity (IDIQ) vehicle with an ordering period from July 1, 2027, to June 30, 2032. Primary operations typically occur between May 1 and September 30, with August being the optimal window, though emergency response may occur outside these dates. The contractor will be responsible for transit to study locations, providing meals and berthing accommodations, and supporting research operations, including the launch and recovery of small boats. Key technical requirements include maintaining a valid Certificate of Inspection or USCG Letter of Designation, adhering to NOAA Small Boat Standards and Procedures, and ensuring the vessel is equipped with an OLE type-approved Vessel Monitoring System. Environmental compliance is critical, requiring external hull inspections for invasive species within 14 days of departure and rat-free certification within 48 hours. The effort falls under NAICS code 483114, with a small business size standard of 550 employees. Interested sources must submit a capability statement and rough order of magnitude estimate to the contracting specialist by November 17, 2026.
Coastal and Great Lakes Passenger Transportation

POSTED

1 day ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS