Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Northwest Landing Pump Station

Closed
2026-MPW-040State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 4 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. This firm-fixed-price contract, with an estimated value between 1 million and 5 million dollars, involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved offshore site south of Oahu. The scope also includes vegetation clearance and revetted mole repairs, such as stone rework, filling voids with additional stone, and root removal. The period of performance is 200 calendar days from the receipt of the Notice to Proceed. The solicitation is set aside for HUBZone Small Businesses, who receive a 10 percent price evaluation preference. Award is based on the lowest responsive bid that complies with all material respects of the invitation. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act for wages, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Technical acceptance is based on third-party multi-beam hydrographic surveys and strict quality standards for stone materials. Bids must be submitted physically via commercial carrier or in-person by September 30, 2026, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract is for the construction of a ferric chloride chemical addition system at the Northwest Landing Wastewater Pump Station in DuPont, Washington, requiring a comprehensive range of site and structural work including a below-grade reinforced concrete foundation with spill containment walls, installation of a polyethylene storage tank, a compatible pump system, steel roof structure, emergency shower and eyewash stations, chain-link fencing, gates, stairs, and associated electrical, water, and chemical piping with cables and wiring. The chemical pump system must include control and alarm panels capable of interfacing with the existing SCADA system, and power must be extended from the existing motor control center to new contractor-supplied electrical panels, with a tap made into the existing water service to supply the emergency showers. All work must be performed while ensuring continuous operation of the pump station. The project is governed by a strict order of precedence for contract documents, with the signed public works contract and change orders taking priority over specifications, drawings, and other materials. The contractor is responsible for furnishing all labor, materials, equipment, permits, and services in accordance with the drawings and specifications, with construction beginning only after approval of a Contractor Quality Control Plan. Work must comply with AWS standards for welding inspections, requiring a Certified Welding Inspector on-site for 100% visual inspection of all field welds, and with IBC Sections 1704 and 1705 for special inspections. The contract requires compliance with Washington state prevailing wage laws under chapter 39.04 RCW, with bidders obligated to pay applicable wage rates and submit certifications proving compliance. All bidders must meet mandatory responsibility criteria including a valid contractor registration under chapter 18.27 RCW, an active Washington Unified Business Identifier number, workers’ compensation coverage under Title 51 RCW, an Employment Security Department number under Title 50 RCW, and a state excise tax registration under Title 82 RCW. Subcontractors must satisfy the same requirements. Proposals must include a bid bond, certification of compliance with wage statutes, non-segregation and non-collusion affidavits, Byrd Anti-Lobbying Certification, and signed acknowledgments of all addenda. The work must be completed within 150 calendar days from notice to proceed, with a detailed schedule and Schedule of Values submitted early in the process to support progress payments based on cost-loaded schedule activities. Payment for materials on hand is prohibited if invoice cost is under $2,000,

General Info

Construction of wastewater pump station with concrete foundation, tanks, pumps, electrical, safety, maintaining operation.

Agency

Washington → Planning and Public WorksView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

(13)

SECTION C Prevailing Wage Compliance

PDFwage-determination

SECTION C Prevailing Wage Compliance Requirements

DOCXwage-determination

SECTION E Drawings for Northwest Landing Force Main Odor Control

PDFdrawings

Pierce County NW Landing Force Main Odor Control Bidding Packet P-111631

PDFbid-packet

SECTION F Appendices - Geotechnical Memorandum and Piezometer Well Report

PDFsow

SECTION F Appendices - Geotechnical Memorandum and Permits

PDFappendices

SECTION E Drawings for Northwest Landing Force Main Odor Control Feb 2026

PDFdrawings

NW Landing Force Main Odor Control Invitation to Bid - Pierce County 2026

DOCXitb

NW Landing Force Main Odor Control Invitation to Bid P-111631

PDFitb

SECTION D Specifications Measurement and Payment - Northwest Landing Force Main Odor Control

PDFspecifications

SECTION D Project Specifications Measurement and Payment - Northwest Landing Force Main Odor Control

PDFspecifications

Pierce County NW Landing Force Main Odor Control Bidding Packet P-111631

DOCXbid-packet

Northwest Landing Force Main Odor Control Construction Cost Estimate August 2025

PDFestimate

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Planning and Public Works
Contacts1 person available
OfficeTacoma, WA, 98402, USA
Organization / Agency
Washington → Planning and Public Works
View Agency Profile
Office AddressTacoma, WA, 98402, USA
Contacts
Joel StangerProcurement & Contracts Specialist

Interested Companies (56)

Show more
Zemek Construction
Puyallup, WA
Capital Heating and Cooling
Lacey, WA
General Mechanical
Tacoma, WA

See All 56 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The purpose of this solicitation is to secure services to perform a range of construction activities at the Northwest Landing Wastewater Pump Station located in DuPont, Washington. The work includes constructing a below grade reinforced concrete foundation with spill containment walls, installation of a polyethylene storage tank, ferric chloride compatible pump system, steel roof structure, emergency shower/eyewash stations, chain-link fence, gates, stairs, and various electrical conduit, water and chemical piping, cables, wiring, and other appurtenances necessary for a functional system. The chemical pump system includes control and alarm panels with Owner furnished equipment for connection to the existing SCADA system. The work also includes extending power cables and conduits from the existing motor control center in the pump station to contractor provided electrical panels. The work also includes tapping the existing water service line and extension to the emergency showers. The pump station must remain operational throughout the work.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS