Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Northwest Landing Pump Station

Closed
2026-MPW-040State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 11 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 17 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract is for the construction of a ferric chloride chemical addition system at the Northwest Landing Wastewater Pump Station in DuPont, Washington, requiring a comprehensive range of site and structural work including a below-grade reinforced concrete foundation with spill containment walls, installation of a polyethylene storage tank, a compatible pump system, steel roof structure, emergency shower and eyewash stations, chain-link fencing, gates, stairs, and associated electrical, water, and chemical piping with cables and wiring. The chemical pump system must include control and alarm panels capable of interfacing with the existing SCADA system, and power must be extended from the existing motor control center to new contractor-supplied electrical panels, with a tap made into the existing water service to supply the emergency showers. All work must be performed while ensuring continuous operation of the pump station. The project is governed by a strict order of precedence for contract documents, with the signed public works contract and change orders taking priority over specifications, drawings, and other materials. The contractor is responsible for furnishing all labor, materials, equipment, permits, and services in accordance with the drawings and specifications, with construction beginning only after approval of a Contractor Quality Control Plan. Work must comply with AWS standards for welding inspections, requiring a Certified Welding Inspector on-site for 100% visual inspection of all field welds, and with IBC Sections 1704 and 1705 for special inspections. The contract requires compliance with Washington state prevailing wage laws under chapter 39.04 RCW, with bidders obligated to pay applicable wage rates and submit certifications proving compliance. All bidders must meet mandatory responsibility criteria including a valid contractor registration under chapter 18.27 RCW, an active Washington Unified Business Identifier number, workers’ compensation coverage under Title 51 RCW, an Employment Security Department number under Title 50 RCW, and a state excise tax registration under Title 82 RCW. Subcontractors must satisfy the same requirements. Proposals must include a bid bond, certification of compliance with wage statutes, non-segregation and non-collusion affidavits, Byrd Anti-Lobbying Certification, and signed acknowledgments of all addenda. The work must be completed within 150 calendar days from notice to proceed, with a detailed schedule and Schedule of Values submitted early in the process to support progress payments based on cost-loaded schedule activities. Payment for materials on hand is prohibited if invoice cost is under $2,000,

General Info

Construction of wastewater pump station with concrete foundation, tanks, pumps, electrical, safety, maintaining operation.

Documents

13

Northwest Landing Force Main Odor Control Construction Cost Estimate August 2025

PDF, High priority: read this firstestimate
High

NW Landing Force Main Odor Control Invitation to Bid P-111631

PDF, High priority: read this firstitb
High

NW Landing Force Main Odor Control Invitation to Bid - Pierce County 2026

DOCX, High priority: read this firstitb
High

Pierce County NW Landing Force Main Odor Control Bidding Packet P-111631

PDF, High priority: read this firstbid-packet
High

Pierce County NW Landing Force Main Odor Control Bidding Packet P-111631

DOCX, High priority: read this firstbid-packet
High

SECTION C Prevailing Wage Compliance

PDF, High priority: read this firstwage-determination
High

SECTION C Prevailing Wage Compliance Requirements

DOCX, High priority: read this firstwage-determination
High

SECTION D Project Specifications Measurement and Payment - Northwest Landing Force Main Odor Control

PDF, High priority: read this firstspecifications
High

SECTION D Specifications Measurement and Payment - Northwest Landing Force Main Odor Control

PDF, High priority: read this firstspecifications
High

SECTION E Drawings for Northwest Landing Force Main Odor Control

PDF, High priority: read this firstdrawings
High

SECTION E Drawings for Northwest Landing Force Main Odor Control Feb 2026

PDF, High priority: read this firstdrawings
High

SECTION F Appendices - Geotechnical Memorandum and Piezometer Well Report

PDF, High priority: read this firstsow
High

SECTION F Appendices - Geotechnical Memorandum and Permits

PDF, Low priorityappendices
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Planning and Public Works
Contacts1 person available
OfficeTacoma, WA, 98402, USA
Office AddressTacoma, WA, 98402, USA
Contacts
Joel StangerProcurement & Contracts Specialist

Interested Companies (56)

Zemek ConstructionPuyallup, WA
Capital Heating and CoolingLacey, WA
General MechanicalTacoma, WA

See All 56 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The purpose of this solicitation is to secure services to perform a range of construction activities at the Northwest Landing Wastewater Pump Station located in DuPont, Washington. The work includes constructing a below grade reinforced concrete foundation with spill containment walls, installation of a polyethylene storage tank, ferric chloride compatible pump system, steel roof structure, emergency shower/eyewash stations, chain-link fence, gates, stairs, and various electrical conduit, water and chemical piping, cables, wiring, and other appurtenances necessary for a functional system. The chemical pump system includes control and alarm panels with Owner furnished equipment for connection to the existing SCADA system. The work also includes extending power cables and conduits from the existing motor control center in the pump station to contractor provided electrical panels. The work also includes tapping the existing water service line and extension to the emergency showers. The pump station must remain operational throughout the work.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS