Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Transportation was posted on September 5, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NV PRA LAME 112-1(1), ECHO BAY ACCESS ROAD

Awarded
Federal
Submission Closed
Solicitation #
DTFH68-12-B-00008

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
International
Transportation and Economic Corridors - Invitation to Bid - TND0025216 - Cold Milling, Asphalt Concrete Pavement and Other Work, 697:02 Hwy 35 - 18 Km E of Hwy 35 selective
Solicitation # TND0025216
Transportation and Economic Corridors is soliciting bids for project TND0025216, involving cold milling, asphalt concrete pavement, and related construction work on Hwy 35 in the Peace Region, specifically from kilometre 0.000 to 16.740. The scope of work includes the installation of 43,900 tonnes of asphalt concrete pavement (EPS Mix Type M1), 74,050 square metres of cold milling, 31 kilometres of milled rumble strips, and various culvert works including grouting and the installation of smooth wall steel pipe and culvert liners. The contract completion date is October 15, 2027. The contract will be awarded to the lowest priced compliant bidder. Bidders must possess a valid Certificate of Recognition (COR), Temporary Letter of Certification (TLC), or Certificate of Recognition Equivalency Letter (COREL) as a precondition for the award; a Small Employer Certificate of Recognition (SECOR) is not acceptable. Tenders must be submitted in an unprotected PDF format via email to [email hidden] by January 13, 2027, at 2:01:00 p.m. Each submission must include a digital bid bond equal to 10% of the tender amount. Payment is processed through Proper Invoices with a 28-day payment timeline and a 5% holdback. The contractor is required to implement a Quality Control Inspection Program (QCIP) and provide a one-year warranty for workmanship and a minimum two-year manufacturer's warranty for materials. There is no set-aside status for this solicitation.
Transportation and Economic Corridors

POSTED

about 10 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

Project NV PRA LAME 112-1(1) involves the rehabilitation, restoration, and reconstruction of the Echo Bay Access Road leading to the Echo Bay Marina at Lake Mead. The scope of work includes realigning roadway curves to improve the overall grade and upgrading the pavement section using pulverized pavement, aggregate base coat, tack coat, hot asphalt concrete, and an open graded friction course. Additional requirements include shoulder reconditioning, the installation of guardrails, concrete curbs, sidewalks, curb ramps, culvert pipes, signing, and striping. The project covers 6.789 kilometers of roadway paving and pullouts, requiring approximately 10,391 cubic meters of excavation and 10,079 metric tons of hot asphalt concrete. With an estimated construction cost ranging between 4 and 7 million dollars, the work was tentatively scheduled to take place from September 1, 2012, to March 31, 2013. This contract was managed by the Department of Transportation's Central Federal Lands Division.

General Info

Contract Value

$4,167,745.24

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Lake Mead National Recreation Area, LAS VEGAS, NV, 89005, USA

Set-Aside

NONE

Award Issued Date

Potential End Date

August 31, 2013

Documents

3
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstifb
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 4 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 19 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Aug 22, 2012 to Aug 24, 2012. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA

Full Description

Show more
This project will be advertised on a full and open (unrestricted) basis. This is not an invitation for bid. Bid documents will NOT be available until project advertisement, tentatively scheduled for July 24, 2012. PROJECT NUMBER: NV PRA LAME 112-1(1) PROJECT NAME: Echo Bay Access Road PROJECT DESCRIPTION: The project consists or 4Rwork on Echo Bay Access Road (rehabilitating, restoration and rehabilitation and reconstruction). The reconstruction portion of this consists of some realignment of the curves on the roadway to improve the grade of the overall roadway This route is the last portion of improvement along the Northshore Road at Lake Mead and this section accesses the Echo Bay Marina area in the park. This work consists of improving the roadway pavement section with pulverized pavement, aggregate base coat, tack coat , hot asphalt concrete pavement and open graded friction course on the roadway section. The project also consists of shoulder reconditioning, guardrail, concrete curb, sidewalk and curb ramp, culvert pipe, signing and striping. The pavement area of the work starts at the north end of this route at the junction with Northshore Road and extends southeasterly to the Echo Bay Marina and parking area. SIGNIFICANT QUANTITIES: o Schedule A - 6.789 km of roadway paving and pullouts. Total of 10,391 cubic meters of Roadway Excavation. Approximately 23,005 metric tons of Aggregate Base. Approximately 8.67 km of Shoulder Reconditioning. Approximately 10,079 metric tons of Hot Asphalt Concrete Pavement. Approximately 2,063 meters of concrete curb. Approximately 2,023 tons of Open graded Asphalt Friction Course. ENGINEER'S ESTIMATE: Estimated Construction Cost Range for Schedule A $4-7 million. CONSTRUCTION DURATION: Tentative construction duration is from September 1, 2012 to March 31, 2013

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
UT NP ARCH 100(2) Bridges on Delicate Arch Road
Solicitation # 6982AF27B000005
The Bridges on Delicate Arch Road project (UT NP ARCH 100(2)) is a construction effort within Arches National Park designed to replace inadequate culverts at Salt Valley Wash, Salt Wash, and Winter Camp Wash with 100-foot span concrete bridges. The project aims to mitigate flooding and sediment deposition that currently create unsafe conditions for visitors and high operational costs. The scope of work includes the design and construction of these bridges, roadway realignment at Salt Valley Wash, and the rehabilitation of roadway sections and parking areas through full depth reclamation and a 4-inch pavement overlay. Key work items include embankment construction, structural concrete, epoxy-coated reinforcing steel, and drilled shafts. This solicitation is a full and open competition with a HUBZone price preference, with an estimated cost range between $10,000,000 and $20,000,000. The project is structured with a base requirement (Schedule A) covering 0.99 miles of roadway and two parking lots, with additional options for further roadway (Option X) and one parking lot (Option Y). The anticipated schedule begins with an award in November 2026 and a notice to proceed in December 2026, with a target completion date of December 2028. Award will be granted to the lowest responsive, responsible bidder. All work must adhere to the FP-14 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237310
Federal
CO OMAD 300(71) Minuteman Missile Access
Solicitation # 6982AF27B000010
The Office of Missile Air Defense Program (OMAD) is seeking a contractor for the maintenance and improvement of Minuteman Missile Access Roads located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. The scope of work involves roadway reconditioning, the addition of a four-inch aggregate surface course with a maximum width of 24 feet and a 4% crown, and the replacement of culverts. All work must remain on the existing roadway bench and conform to the FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. The project encompasses approximately 114 miles of road across three schedules and includes deliverables such as construction schedules, drainage structures, and soil erosion and sediment control. This is a Total Small Business Set Aside procurement under NAICS code 237310, with an estimated project value between $5,000,000 and $10,000,000. The contract will be awarded to the lowest responsive and responsible bidder, with the government evaluating schedules in the priority order of Schedule C, then B, and finally A. Requirements include the submission of bid, performance, and payment bonds, as well as resumes for key personnel and on-site managers. The project is subject to the Davis-Bacon Act and the Buy American Act, and payments will be made via monthly progress invoices.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in 6 days
View Details
NAICS: 237310
Federal
ND OMAD 2025(1) Minuteman Missile Access Road
Solicitation # 6982AF27B000011
The ND OMAD 2025(1) Minuteman Missile Access Road project, solicitation 6982AF27B000011, is a total small business set-aside managed by the FHWA Central Federal Lands Highway Division. The project focuses on the annual maintenance and improvement of certified gravel roads across six counties in North Dakota, specifically within Bottineau, McHenry, McLean, and Ward counties. The scope of work includes roadway reconditioning, the installation of a four-inch aggregate surface course with a maximum width of 24 feet, drainage improvements, and the replacement of culverts. The project is divided into three schedules (A, B, and C) covering approximately 40.84 to 44.84 miles of road work, with an estimated contract value between $2,000,000 and $5,000,000. Technical requirements are governed by the FP-24 Standard Specifications for Construction of Roads and Bridges. Contractors must adhere to strict grading tolerances, provide a baseline construction schedule, and comply with the Davis-Bacon Act and the Buy American Act. Bidders are required to submit sealed physical bids and provide performance and payment bonds. The government will evaluate the schedules in order of priority, starting with Schedule C, then B, and finally A, based on available funding. Performance must commence within 10 calendar days of the notice to proceed.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in 6 days
View Details
NAICS: 237310
Federal
HI FLAP CR562(1) Kilauea Point
Solicitation # 6982AF27B000008
The Kilauea Point Access Improvements project, managed by the Federal Highway Administration Central Federal Lands Highway Division, focuses on enhancing pedestrian and bicycle access at the Kilauea Point National Wildlife Refuge on the island of Kaua'i. The scope of work involves the installation of a sidewalk from the Kuhio Highway intersection to the KPNWR Overlook, covering approximately 1.70 miles, divided into Schedule A (1.47 miles) and Option X (0.24 miles). Key construction activities include pavement rehabilitation, roadway widening with full depth pavement on aggregate base course, the reconstruction of a turnaround, and the installation of two mini-roundabouts, guardrails, curbs, gutters, and pedestrian crossings. The project also includes minor utility adjustments and is governed by the FP-14 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. This firm fixed price solicitation, under NAICS 237310, is open for full and open competition. Award will be granted to the lowest responsible bidder, with a 10 percent price evaluation preference applied to all offers except those from HUBZone small business concerns and other successful small business concerns. Bidders must submit prices for all items in Schedule A and Option X. Performance requirements include a strict schedule for shutdown connections, which are limited to Tuesdays through Thursdays and prohibited during specific holiday windows. The contractor is required to submit a construction schedule within 15 to 45 days of the notice to proceed. All materials must be approved by the engineer prior to the commencement date.
Highway, Street, and Bridge Construction

POSTED

10 days ago

DEADLINE

in 21 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS