This Solicitation opportunity from Ohio was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ODOC-SFM-ACAD-FY27 Class B Live Fire Training Mobile Lab Trailer Builds: OFA Project 10 & Project 16
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the construction of mobile lab trailers designated for Class B live fire training, under OFA Project 10 and Project 16, with a solicitation number SRC00000443 and a response deadline of July 31, 2026. The trailers are intended to serve as mobile training platforms for fire safety and emergency response personnel, emphasizing real-world fire suppression scenarios. The work is to be performed in Ohio, and the solicitation is issued by the State Fire Marshal’s office under the SLED category, indicating a state, local, or educational government agency. The posting date is listed as July 28, 2026, suggesting this is a near-term procurement with a narrow window for submissions. The contract does not specify a type of set aside or NAICS code, leaving eligibility open to all qualified contractors without demographic or size-based restrictions. The trailer bodies must meet technical specifications for live fire operations, including durability, safety systems, mobility, and environmental controls necessary for repeated training use. Although the point of contact details are missing, the official portal for all information and submissions is provided through the OhioBuys platform, which prospective bidders must use to access full specifications and submit proposals. There is no indication of existing contracts or prior performance requirements, but adherence to safety standards and proven experience in building specialized mobile facilities is likely critical for evaluation.
General Info
Agency
NAICS
Place of Performance
OH, USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Itemized Quote. The quote shall be itemized and include the following: estimated shipping, company name, contact information, including name, phone number and email to which COM should remit the purchase order.Nothing herein guarantees that the quote will be accepted by Commerce.Form of Payment. Please state in the quote if you accept credit card as form of payment and if there are any additional fees applied to those purchases. If so, please state the additional fees and/or surcharge in the quote.Current State Contract or Agreement. If the products and/or services are currently contracted under a Department of Administrative Services (“DAS”) Contract, State Term Schedule (“STS”), Master Maintenance Agreement (“MMA”) or Master Cloud Services Agreement (“MCSA”), provide the contract number and confirm your quote pricing matches what is listed in the pricing section of the DAS contract. If the pricing contained in your responsive documents fails to match the DAS contract pricing, your quote may be rejected.If the product and/or service requested is not quoted from an existing DAS Contract or Agreement, please provide supplier’s Software License Agreement, Maintenance Agreement, and Terms and Conditions documentation when quoting.If not all products and/or services are referenced on a DAS Contract, please provide two separate quotes: one for products and/or services addressed in the DAS contract and one for the products and/or services not addressed by the DAS contract.If signature is required for products and/or services not addressed by the DAS contract, please provide the agreement and/or terms and conditions related to the purchase. This includes software license agreements.
Trailer body
Inquiries Inquiry 92805 | Section 2 SOW2c. The electrical generation equipment shall utilize the on-board propane at its fuel source.Question: In section 3.10 F. It states Quiet Diesel Generator. Do you want a propane generator or a quiet diesel?2f. Offered pricing includes a minimum $5000 vinyl graphics allowanceQuestion: In section 3.10I. Graphic allowance for OFA branding on trailer, $4000. Is it $4000 or $5000?Section 3. Tech Spec3c. The chassis shall not be fabricated by the proponent; any exceptions to this will disqualify the respondent.Question: If the trailer is being custom fabricated from the ground up by a trailer builder does this apply?Section 3.1 Flatbed trailer specifications…ensure the trailer meets the demands of the OFA’s Regional Delivery ProgramQuestion: Is there a document stating what the demands of the OFA’s Regional Delivery Program are?G. Dual rear wheels with steel wheelsQuestion: In Section 3.10 I, it states Aluminum wheels. What is to be delivered?H. Belly box storage, both sides.Question: What are the dimensions required for belly boxes?J. Observation Viewing WindowQuestion: Where does client want this window?Section 3.2 Live Fire Traiing EquipmentQuestion: Which mock ups do you wat for the interchangeable prop? Section 3.2 states bed, clothes dryer, boiler/water and heater. Section 3.11 mentions flange, marine engine, radar console, sofa, storage rack, gas bottles, hazmat drums.If boiler/water and heater, please clarify the configuration/appearance of this prop.Section 3.6 Equipment Storage CompartmentQuestion: Is there a list of what equipment and quantities of each that are needing storage? This is to size the compartment.Section 3.7 Propane Storage compartmentMinimum 200 gallons of propane. The LP gas storage tank shall be ASME approvedQuestion: Do you want a 200 gallon ASME propane motor fuel tank or will 2 of 420lb DOT cylinders be an alternate?Section 3.11.B.2 System Specifc DetailsThe TSCP shall be …Question: What is the TSCP?Section 3.13 Warranty and MaintenanceQuestion: Do you want three years of maintenance pricing included in the base price, or do you want this listed as an option separately?Section 3.16 Set up and DeliveryThe set up and handover checklist mentions Smart Class A. Is this a typo or do you expect Class A burns in the trainer? | Answer: Section 2 SOW2c. The electrical generation equipment shall utilize the on-board propane at its fuel source.Question: In section 3.10 F. It states Quiet Diesel Generator. Do you want a propane generator or a quiet diesel?RFP states can be propane or diesel. We prefer propane.2f. Offered pricing includes a minimum $5000 vinyl graphics allowanceQuestion: In section 3.10I. Graphic allowance for OFA branding on trailer, $4000. Is it $4000 or$5000?$5000Section 3. Tech Spec3c. The chassis shall not be fabricated by the proponent; any exceptions to this will disqualify the respondent.Question: If the trailer is being custom fabricated from the ground up by a trailer builder does this apply?Trailer builds must be done by a semitrailer builder with all semi-trailer components. It must meet DOT standards as described in the RFPSection 3.1 Flatbed trailer specifications…ensure the trailer meets the demands of the OFA’s Regional Delivery ProgramQuestion: Is there a document stating what the demands of the OFA’s Regional Delivery Program are?There is no document, and all trailers must be built as semi-trailers by a semi-trailer builder with all semi-trailer components. It must meet DOT standards as described in the RFP to ensure they meet the needs of the OFA Regional Delivery Program.G. Dual rear wheels with steel wheelsQuestion: In Section 3.10 I, it states Aluminum wheels. What is to be delivered?Aluminum is preferred but the vendor can spec steel if they want in their bidH. Belly box storage, both sides.Question: What are the dimensions required for belly boxes?This is to the vendor's design according to DOT standards for height and hauling regulations. J. Observation Viewing WindowQuestion: Where does client want this window?This is the vendor's design in their development of these trailers.Section 3.2 Live Fire Traiing EquipmentQuestion: Which mock ups do you wat for the interchangeable prop? Section 3.2 states bed, clothes dryer, boiler/water and heater. Section 3.11 mentions flange, marine engine, radar console, sofa, storage rack, gas bottles, hazmat drums.If boiler/water and heater, please clarify the configuration/appearance of this prop. All props considered for these trailers can be the vendor's design; according to the RFP to design 2 story/ 2 roomy residential fire components with rollover.Section 3.6 Equipment Storage CompartmentQuestion: Is there a list of what equipment and quantities of each that are needing storage? This is to size the compartment.This is the vendor's responsibility to design. The RFP states that this storage area will hold PPE equipment, etc for our trainers. Section 3.7 Propane Storage compartmentMinimum 200 gallons of propane. The LP gas storage tank shall be ASME approvedQuestion: Do you want a 200 gallon ASME propane motor fuel tank or will 2 of 420lb DOT cylinders be an alternate?We can not have more than 500lbs and be able to legally transport. The vendor should spec the best design to meet DOT standards for this training prop. We currently use 2-250 lb DOT cylinders as an example.Section 3.11.B.2 System Specifc DetailsThe TSCP shall be …Question: What is the TSCP?Thermal Safety Control PanelSection 3.13 Warranty and MaintenanceQuestion: Do you want three years of maintenance pricing included in the base price, or do you want this listed as an option separately?Priced separatelySection 3.16 Set up and DeliveryThe set up and handover checklist mentions Smart Class A. Is this a typo or do you expect Class A burns in the trainer?That is a typo. We expect Class B. | Answered: 7/22/2026 Inquiry 94479 | Round 3 calls for technical drawings and detailed specifications. Please confirm that detailed conceptual/design drawings, together with comprehensive technical specifications, are sufficient for the purpose of bid submission and evaluation, with the successful bidder to subsequently prepare and submit detailed manufacturing/fabrication drawings for review and approval prior to commencement of manufacturing. | Answer: Vendors must submit a detailed conceptual drawing with all technical specifications. Once selected the vendor will be required to provide manufacturing/fabrication drawings that will be reviewed prior to contract award | Answered: 8/13/2026 Inquiry 94483 | Section 3. C. states the chassis shall not be fabricated by the proponent. If the proponent is a licensed chassis manufacturer holding an active State of California DMV manufacturer license and has the capability to manufacture chasis intended to comply with applicable DOT requirements, is this acceptable? Please clarify whether chassis fabrication by the proponent would be considered Acceptable where the proponent is itself a licensed chassis manufacturer and provides, as part of its bid submission, documentation demonstrating its active manufacturer license along with technical speciifcaitons and drawings. Alternatively, please confirm whether the stated prohibition against chassis fabrication by the proponent applies without exception, including to propoinets that are independently licensed and qualified chassis manufacturers. | Answer: Trailer builds must be done by a semitrailer builder with all semi-trailer components and must meet commercial DOT standards as described in the RFQ. All trailers and chassis must meet ODOT requirements. This build is to be placed on commercial chassis on commercial axels supporting 34,000 lbs in tandem. (Non-Floating axels can be used in this commercial set up). If the manufacture meets all specs described in the SOW and are sub-contracted with you as your chassis/trailer builder, you must be able to insure they meet ODOT standards for commercial use and transport. | Answered: 8/13/2026
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
