Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from International Boundary And Water Commission: Us-Mexico was posted on January 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Operation & Maintenance of the South Bay Wastewater Treatment Plant

Closed
FY26OMSBIWTPFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new process systems, administrative and support buildings, and utility connections. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project also requires a 12-month operational support period following construction. The estimated magnitude of construction exceeds 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating proposals based on technical experience, technical approach, management approach, key personnel experience, and price. Key personnel requirements include a Project Manager, Construction Superintendent, Quality Control Manager, Safety Specialist, and Historic Preservation Treatment Specialist. Contractors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements emphasize strict cybersecurity hygiene for SCADA/MES equipment, granting the government full access to software source code, and compliance with ADA standards. Invoicing is managed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a draft review by the Contracting Officer's Representative seven days prior to final submission.
Dsc Contracting Services Division

POSTED

about 17 hours ago

DEADLINE

in 21 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

8 days ago

DEADLINE

in 2 months
NAICS: 221320
Federal
Waste Water Treatment Plant Services
Solicitation # FA448627Q0002
Solicitation FA448627Q0002 is a Request for Quotation issued by the Department of the Air Force for Waste Water Treatment Plant Services at Lajes Field in Praia da Vitoria, Azores, Portugal. The contractor will be responsible for the operation and maintenance of a waste water treatment plant with a capacity of 800,000 gallons per day, as well as the associated lift station, oil-water separator, and grease traps. Key requirements include providing a Lead Operator with a Level II or higher WPI Certification and at least three years of experience, implementing a 52-week preventive maintenance plan, and ensuring compliance with ISO/IEC 17025 laboratory standards and Portuguese decree law 183/2009 for waste landfills. The scope also encompasses corrosion control, painting, and the management of hazardous materials. The government intends to award a single Firm-Fixed-Price contract with a total duration not to exceed 66 months, consisting of a base period and four option periods. This is an unrestricted acquisition, and proposals must be submitted electronically by November 23, 2026, at 14:00 Azores Time. Offers are evaluated through a three-step sequential process: an administrative compliance review, a technical acceptability evaluation based on experience, approach, and a quality control plan, and finally a price evaluation in Euro currency. Award is contingent upon the availability of funds. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4486 765 Abs Conf

POSTED

16 days ago

DEADLINE

in 26 days

General Info

NAICS

221320 - Sewage Treatment Facilities

Place of Performance

San Diego, CA, 92154, USA

Set-Aside

NONE

Documents

48

Amendment 0001 to Solicitation 191BWC26R0001

PDF, High priority: read this first3 pages · amendment
High

Amendment 0002 to Solicitation 191BWC26R0001 for South Bay IWTP O M Services

PDF, High priority: read this first10 pages · amendment
High

Amendment 0003 to Solicitation 191BWC26R0001

PDF, High priority: read this first4 pages · amendment
High

Amendment 0004 to Solicitation 191BWC26R0001

PDF, High priority: read this first1 page · amendment
High

Amendment 0005 to Solicitation 191BWC26R0001

PDF, High priority: read this first1 page · amendment
High

Amendment 0006 to Solicitation 191BWC26R0001 for South Bay IWTP O M Services

PDF, High priority: read this first6 pages · amendment
High

Amendment 0007 to Solicitation 191BWC26R0001 - Proposal Page Limits Clarification

PDF, High priority: read this first4 pages · amendment
High

Amendment 0008 to Solicitation 191BWC26R0001

PDF, High priority: read this first4 pages · amendment
High

Canyon Collector Daily Inspection Template MAR 2025

XLSX, High priority: read this first40 pages · inspection-template
High

Cease and Desist Order R9-2025-0139 for South Bay International Wastewater Treatment Plant

PDF, High priority: read this first13 pages · cease-and-desist-order
High

Contract 191BWC24C00008 Early Work Package 1C Replacement in Kind at SBIWTP

PDF, High priority: read this first117 pages · construction-drawings
High

Emergency Response and Contingency Plan - South Bay IWTP

PDF, High priority: read this firstemergency-response-plan
High

FY26 SBIWTP O&M Performance Work Statement Amendment Dec 2025

PDF, High priority: read this first37 pages · amendment
High

FY26 SBIWTP O&M Performance Work Statement Amendment Dec 2025

PDF, High priority: read this first37 pages · pws-amendment
High

FY26 SBIWTP Operation and Maintenance Performance Work Statement

PDF, High priority: read this first37 pages · sow
High

FY26 SBIWTP Operation and Maintenance Quality Assurance Surveillance Plan

DOC, High priority: read this first8 pages · qasp
High

IBWC SBIWTP Asset Maintenance Schedule

XLSX, High priority: read this first2292 pages · sow
High

IBWC Spill and Transboundary Flow Event Prevention and Response Plan 2021

PDF, High priority: read this first56 pages · plan
High

IBWC Wastewater Treatment Facility Condition Assessment Report Jan 2024

PDF, High priority: read this first148 pages · condition-assessment-report
High

SBIWTP Operation and Maintenance Contract Performance Work Statement 2020

PDF, High priority: read this first34 pages · pws
High

SBIWTP PDB Expansion Coordination SOW Section 01.31.83.01

PDF, High priority: read this first7 pages · sow
High

Sequence of Operations for South Bay International Wastewater Treatment Plant

PDF, High priority: read this first70 pages · sow
High

Solicitation 191BWC26R0001 IFB for OM Services SBIWTP

PDF, High priority: read this first58 pages · ifb
High

Solicitation 191BWC26xxxxxx RFI Tracker

XLSX, High priority: read this first9 pages · rfi
High

Solicitation 191BWC26xxxxxx RFI Tracker for Industry Day and Site Visit

XLSX, High priority: read this first8 pages · rfi
High

South Bay International Wastewater Treatment Plant Capital Improvement Plan 2025-2029

PDF, High priority: read this first32 pages · capital-improvement-plan
High

South Bay International Wastewater Treatment Plant O&M Manual Volume 1 of 4

PDF, High priority: read this first1773 pages · sow
High

Updated Chemical Dosage Report September-October 2025

PDF, High priority: read this firstspecifications
High

USIBWC Southbay Wastewater Treatment Plant Risk Assessment March 2025

PDF, High priority: read this first124 pages · risk-assessment
High

Wage Determination CA20240001 San Diego County California 07/26/2024

PDF, High priority: read this first34 pages · wage-determination
High

2024 Annual Biosolids Report for South Bay International WWTP

PDF, Low priority38 pages · annual-biosolids-report
Low

Attachment Wage Determinations CA20240001 07.26.2024

PDF, Low priority34 pages · other
Low

FIPS PUB 199 - Standards for Security Categorization of Federal Information and Information Systems

PDF, Low priority13 pages · other
Low

FY26 O&M South Bay IWTP Required Performance Metrics Table

XLSX, Low priority3 pages · other
Low

IBWC SBIWTP Asset Registry 2024

XLSX, Low priority46 pages · other
Low

Monthly Chemical Dosage and Solids Report March 2024 to March 2025

PDF, Low priority22 pages · report
Low

NIST SP 800-171r3 Protecting Controlled Unclassified Information May 2024

PDF, Low priority120 pages · other
Low

NPDES Permit Order R9-2023-0009 for South Bay International Wastewater Treatment Plant

PDF, Low priority241 pages · contract-document
Low

SBIWTP Capital Project List as of April 2025

PDF, Low priority1 page · other
Low

SBIWTP Expansion Site Visit Presentation (11.7.2025)

ZIP, Low priority7 pages · industry-day
Low

SBIWTP O&M 2026 Submittal Register

XLSX, Low priority4 pages · other
Low

SBIWTP Plans & Drawings Memorandum May 19, 2025

DOCX, Low priority1 page · other
Low

SBIWTP SCADA System Security Plan Version 2.0

PDF, Low priority116 pages · other
Low

South Bay International Wastewater Treatment Plant List of Permits and Fees

DOCX, Low priority1 page · other
Low

South Bay International Water Treatment Plant Map Attachment

PDF, Low priority13 pages · other
Low

Tijuana Wastewater Flow Diagram October 2025

PDF, Low priority1 page · flow-diagram
Low

USIBWC Organizational Chart

PDF, Low priority1 page · other
Low

Veolia Organization Chart (7/16/2019)

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

11 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice title changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 18, 2025 to Dec 13, 2025. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Dec 13, 2025 to Jan 17, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyInternational Boundary And Water Commission: Us-Mexico → Internat Boundary And Water Commission
Contacts2 people available
OfficeEl Paso, TX, 79902, USA

Full Description

Show more

Amendment 0008: aditional Q&As. 


Amendment 0007: Clarification on Page Limits and Proposal Requirements


Ammendment 006


Update section L04B Access Request Deadline: All access requests must be submitted no later than 01/15/2026, at 12:00 PM MST. SharePoint Access Period: Vendors will be granted access to upload proposals starting January 15, 2026Proposal Submission Deadline: All proposals must be uploaded by Friday, January 16th, 2026, at 5:00 PM MST. Late uploads will not be accepted, and expired links will not be reactivated.


Amendment 005 corrects the Governemt's responce to Q&A #110 removing "Hard Copy and Electronic Copy: Both are required."


Corrected response: 


Page Size and Limits: Standard Page Size: 8.5" x 11", Maximum Length: Technical Proposal: 20 double-sided pages (or 40 single-sided), Qualifications Proposal (Phase One): 10 double-sided pages (or 20 single-sided); Exclusions from Page Count: Cover page, table of contents, resumes, client authorization letters, divider pages, and OSHA forms.11" x 17" Sheets: Allowed only for schedules or organizational charts. Counted as one 8.5" x 11" page toward the page limit. Font and Readability: Minimum Font Size: 10-point for body text. This does not apply to graphics, captions, tables, and charts. Legibility: Proposals must be clear, easy to read, and logically presented. Submission Format: Electronic Format: PDF only. Must be either a high-quality scan or a document produced directly to PDF. Page Numbering: All pages must be consecutively numbered, including tables and exhibits.


Amendment 004 incorporates the O&M PWS amended 16 December 2025 and updates the RFI. Both are added to the attachments of this solicitation. 


Amendment 003 Amendment 003 incorporates changes to the PWS, Q&A, adds attachments, and changes the due date of proposal to 16 January 2026. Question due date has passed but questions can still be submitted in accordance with instructions below, but the Contracting Officer has the discretion if an answer is warranted.  


Note - PWS added as attachment. Amendment 002 is adding updating Clauses and changing dates below:


Key Deadlines & Due Dates


Questions & Clarifications


•             Deadline to Submit Questions changed to 10:00 AM PST (11:00 AM MST), November 26, 2025


Proposal Submission


•             SharePoint Access Request Deadline changed to December 5, 2025, 12:00 PM MST


•             SharePoint Upload Window Opens changed to December 8, 2025


Solicitation Close


•             Solicitation Closing Date changed to December 22, 2025, 5:00 PM MT 


Questions shall be submitted via- SharePoint: request access to contact@example.gov, contact@example.gov and contact@example.gov, once access is requested you will receive confirmation. Each vendor must submit all solicitation and site visit questions in writing by 10:00 AM PST (11:00 AM MST) on November 17, 2025 referencing Solicitation No. 191BWC26R0001.

Only the individual who requested access will be granted permission to the vendor’s designated Q&A folder. Access links are unique and must not be shared or forwarded.

All questions must be uploaded directly to that folder, then an email notification must be sent to contact@example.gov confirming submission.

Each question must identify the specific solicitation page or section it refers to.

File Naming Convention
File name must follow this format:
[YYYYMMDD]_[CompanyName]_191BWC26R0001_QA.docx
Example: 20251105_ABC_Engineering_191BWC26R0001_QA.docx

Submission Requirements
1. Upload one consolidated document per company.
2. Use Word or Excel format only.
3. Include page or section references for each question.
4. Do not include photos or unrelated attachments.
5. Questions will be answered publicly through the SAM.gov.

 


------------------------------------------------


Attachment 14 was revoked 


Amendment 001 - Changing Site Visit date to Friday, 7 November 2025


Current contract 191BWC20C0003 



INTRODUCTION


The United States Section of the International Boundary and Water Commission (USIBWC), has a requirement for contract for the operation and maintenance (O&M) of the South Bay International Wastewater Treatment Plant (SBIWTP) and facilities located in San Diego County, California.  Type of contract, Firm Fixed Priced, Cost Reimbursable, Hybrid, etc. to be determined.  


The Contractor shall provide, all labor, material, management (including bi-national participation with Mexico), and other resources required to perform full-service O&M of the SBIWTP and its conveyance system, plus Canyon Collectors, Pump Stations, and South Bay Land Outfall (SBLO). Full service operation and maintenance is defined as complete facility operation and maintenance, including but not limited to providing day-to-day contract management, planning, supervision, administration, personnel; plant influent and effluent sampling and laboratory testing; equipment operation, maintenance, servicing, repair and replacement; system monitoring and operation; data recording, markups of plant as built, management and reporting; quality control; capital improvements; vehicles and vehicle fleet management, operation, maintenance and repair; housekeeping; grounds maintenance; consumable supplies including chemicals, and other services related to the operation and maintenance of the SBIWTP.   


BACKGROUND  


The SBIWTP is a twenty-five (25) million gallon per day (MGD) wastewater treatment plant located at 2995 Clearwater Way, in San Diego, San Diego County, California, , north of the International Boundary, and near the intersections of Monument and Dairy Mart Roads.  Construction of the plant’s advanced primary treatment phase was completed in September 1997, and construction of the secondary treatment phase was completed in January 2011.  The plant is treating wastewater originating in Tijuana, Baja California, Mexico and the SBIWTP is operated under the authority of the United States Section, International Boundary and Water Commission (USIBWC).  An average of twenty five million gallons per day (25 MGD) of effluent is being discharged through the South Bay Ocean Outfall (SBOO), and is subject to the requirements of the National Pollutant Discharge Elimination System (NPDES) Permit, Permit Number CA0108928, Order Number R9-2023-0009; the California Regional Water Quality Control Board (CRWQCB) Monitoring and Reporting Program, Number: R9-2023-0009; and the California Ocean Plan.   


In 2024, USIBWC awarded a $600M contract for the design and construction of the rehabilitation and expansion of the SBIWTP. USIBWC awarded the contract to PCL Construction (PCL) of Long Beach, California. In turn, PCL selected Stantec Consulting Services, Inc. (Stantec), of San Diego, as the design firm. The project was awarded using the Progressive Design-Build (PDB) contract delivery method consistent with Government contracting practices and regulations. 


Expansion of Capacity 


According to USIBWC's timeline, the design process of the plant’s expansion will unfold in strategic phases, with the complete plant expansion targeted for completion by 2027. The initial phase of the plant’s expansion encompasses design development for the entire SBIWTP scope, while subsequent phases will implement rehabilitation efforts concurrent with the ongoing expansion work. 


During the expansion, the PDB team will work closely with the future SBIWTP Operator of this Contract to rehabilitate the plant while also expanding it. The USIBWC and PDB team aims to enhance the plant's treatment capacity from the current 25 MGD to 35 MGD by 2025, with a subsequent expansion to 60 MGD projected for completion by 2027. This will likely be done in incremental increases of, for example, 10 MGD or 20 MGD at a time, with a maximum potential capacity of 60 MGD. Throughout the incremental expansion period, the Operations and Maintenance contract will be adjusted as needed to accommodate the changing requirements and milestones of the Progressive Design-Build project. While the PDB project team will retain responsibility for all construction activities, modifications to this contract will undergo review and receive appropriate authorization when necessary. 


There will be a sixty (60) day phase in/outperiod. The Contract will consist of a Base Year from date of award 6March 30, 2027 plus four (4) one-year option periods.  This is anticipated to be an unrestricted procurement under the NAICS code 221320 (Sewage Treatment Facilities), the small business size standard is $50 million. 



List of Attachments: 


  1. SOM- Submittal Registry (aka deliverables) 
  2. Quality Assurance Surveillance Plan (QASP) 
  3. Required Performance Metrics (RPM) 
  4. NPDES Permit R9-2023-0009; 4A CDO-R9-2025-0139
  5. List of Permits 
  6. SBIWTP Asset Registry  
  7. SBIWTP Condition Assessment Report- January 2024 
  8. SBIWTP Asset Maintenance Schedule 
  9. SBIWTP Capital Project List- April 2024 
  10. Monthly Chemical Dosage from March 2024- March 2025, updated Sep-Oct 2025
  11. Canyon Collector Daily Inspection Template 
  12. NPDES Annual Biosolids Report 2024 
  13. SBIWTP O&M Manual 
  14. SBIWTP System Security Plan (Need to Request access through file share), updated 042020
  15. NIST SP 800-17r3 
  16. Plans/Drawings 
  17. Maps 
  18. NIST SP 199 
  19. SBIWTP Sequence of Operations (SOO) 
  20. Wage Determination (WD) 
  21. IBWC Spill and Transboundary Plan 2021
  22. USIBWC SDFO Org Chart 22A 2019 Contractor Org Chart
  23. IBWC SBIWTP Capital Improvement Plan 2025-2029
  24. 2025 2025 IBWC Risk Assessment Final
  25. 2025 Tijuana wastewater flow diagram
  26. Emergency Response Plan
  27. SBIWTP PDB O&M Contract PWS 2020
  28. SBIWTP PDB Expansion PWS section 01.31.83.01
  29. CUI_SBIWTP PDB Early Work Package 1C replacement in kind
  30. Temp_Capacity_Incr_BOD_TM8 (need to request access through file share)
  31. Temp_Capacity_Inc_OM_TM10 (need to request access through file share)
  32. Plant Flow Diagram_2025_Temp_increase 35 mgd (need to request through file share)
  33. Thickening & Dewatering Service (need to request through file share)
  34. 12 months O&M reports (need to request through file share)
  35. 12 months NPDES Reports (need to request through file share)


More opportunities from International Boundary And Water Commission: Us-Mexico → Internat Boundary And Water Commission

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS