OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves constructing a 0.3-mile multi-use trail along the Historic Columbia River Highway State Trail, stretching from Mitchell Point Drive to Ruthton Trailhead, approximately four miles west of Hood River, Oregon. Work includes clearing, excavation, grading, drainage installation, aggregate-base and asphalt surfacing, a precast concrete arch culvert, temporary traffic control, and permanent signage and striping. The contract is structured as a sealed bid, firm-fixed-price agreement with an estimated price range between $5 million and $10 million, and is targeted for completion in late winter or spring of 2028. The solicitation is designated as a total small business set-aside under SBA rules, ensuring eligibility is restricted to qualified small businesses, and the solicitation is expected to be released in fall or winter of 2026. All interested parties must register on SAM.gov and be linked to an entity to access the Interested Vendors List and receive updates, with notifications available by following the opportunity on the SAM.gov portal. The contracting office is the Western Federal Lands Division of the Department of Transportation, located in Vancouver, Washington, and the primary point of contact is the Contracts Office with the provided email and phone number.
General Info
Agency
NAICS
Place of Performance
Hood River, OR, USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
PROJECT: OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
LOCATION: 4 miles west of Hood River, OR
WORK: This project consists of a new multi-use trail, precast concrete arch culvert, clearing, excavation, grading, drainage, aggregate-base, asphalt surface course, temporary traffic control and permanent signage and striping. See “Project Description” posted under Attachments for additional details.
LENGTH: 0.3 miles
TENTATIVE COMPLETION DATE: Late Winter/Spring 2028
CONTRACT TYPE: Sealed Bid, firm-fixed-price
ESTIMATED PRICE RANGE: Between $5,000,000 and $10,000,000.
INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE.
This project is anticipated to be solicited Fall/Winter 2026
To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Transportation → 690567 Western Federal Lands Division
Same awarding agency
