Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

OR FS FREWN602 28(1), Road 28 Reconstruction

Active
69056727B000001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The OR FS FREWN602 28(1) project involves the reconstruction of Road 28, located approximately six miles south of Silver Lake, Oregon. This total small business set-aside contract, managed by the Western Federal Lands Division of the Department of Transportation, focuses on full depth reclamation of the existing roadway, aggregate surfacing, and drainage. The estimated price range for the project is between 5,000,000 and 10,000,000 dollars, with the work falling under NAICS code 237310. The scope of work is divided into a base requirement and three options. The base project includes approximately 8.3 miles of full depth reclamation, aggregate surfacing, and drainage, with a tentative completion date of July 2027. Option X provides an additional 3.4 miles of reclamation due by July 2027, Option Y covers an additional 14.1 miles of reclamation due by September 2027, and Option Z includes 7.5 miles of minor asphalt patches due by August 2027. The tentative solicitation date is scheduled for January or February 2027 under solicitation number 69056727B000001.

General Info

Small business contract for reconstructing Road 28 in Oregon, including reclamation and drainage.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Silver Lake, OR, USA

Set-Aside

SBA

Documents

3
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first3 pages · sow
High
PDF, Low priority1 page · presolicitation
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Office AddressVANCOUVER, WA, 98661, USA
Contacts

Full Description

Show more

OR FS FREWN602 28(1), Road 28 Reconstruction


Total Small Business Set-Aside 


This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage.


  • Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage.
  • Option X: includes an additional 3.4 miles of full depth reclamation
  • Option Y: includes an additional 14.1 miles of full depth reclamation
  • Option Z: includes 7.5 miles of minor asphalt patches.

Project Location: This project is located approximately six miles south of Silver Lake, OR.


Estimated Price Range: Between $5,000,000 and $10,000,000


Tentative Solicitation Date: January/February 2027


Tentative Fixed Completion Date:


  • Base: July 2027
  • Option X: July 2027
  • Option Y: September 2027
  • Option Z: August 2027

INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.


PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.


To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (IFB) (specifications and plans) will be posted at this link.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements encompass the installation of utilities, manholes, traffic signs, signals, lighting, and landscaping, along with support services for traffic control, storm water pollution prevention, and quality control. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237310
New
SLED
West Side Improvements - Bus Stops Package 1
Solicitation # 26-035
The City of Pueblo is soliciting bids for the West Side Improvements - Bus Stops Package 1 (Solicitation 26-035), a project focused on enhancing community connectivity and mobility. The scope of work involves the rehabilitation of 23 existing bus stops on the west side of Pueblo, including the installation of new concrete pads, sidewalks, curb and gutter, and ADA-compliant curb ramps. Additional improvements include the installation of new or replacement benches and illuminated bus stop signs, specifically utilizing Urban Solar PV Stop+ products. The project is funded through a Federal Highway Administration RAISE Grant and requires strict adherence to the Davis-Bacon Act for prevailing wages, Buy America/BABA requirements, and FHWA construction oversight standards. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid. Key requirements for bidders include a bid security of 5 percent of the grand total bid and the submission of performance and payment bonds prior to the Notice to Proceed. The project has a completion timeline of 180 days, with work commencing within three calendar days of contract execution. Contractors must comply with various federal and local mandates, including EEO bulletin board postings, FFATA reporting, and City of Pueblo licensing and sales tax regulations. All materials and workmanship are guaranteed by the contractor and surety for two years following final acceptance.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement is a federal construction project (STP-9901(663)) managed by the City of St. Louis Board of Public Service. The scope involves the reconstruction of the Union and Lindell Boulevard Bridge over Forest Park Parkway and the MetroLink Railway in St. Louis, Missouri. Key technical requirements include the installation of MSE retaining walls, steel H-piles, drilled shafts, and specific trackwork components such as transition tie spacing and rubberized gap fillers. The project is governed by a hierarchy of specifications, with Job Special Provisions taking precedence, followed by standards from the City of St. Louis, the Missouri Department of Transportation, and the Metropolitan St. Louis Sewer District. The contract carries a performance responsibility value of approximately 27.41 million dollars and a completion timeline of 452 working days, with liquidated damages set at 4,300 dollars per day. Bidders must provide a 5 percent bid deposit and ensure surety companies have a policyholder rating of A- or better and a financial rating of V or higher. Compliance requirements are extensive, including mandatory E-Verify participation, adherence to the Buy America Certification for iron and steel, and a ten-hour OSHA Construction Safety Program for on-site employees. Additionally, the project mandates strict adherence to Disadvantaged Business Enterprise (DBE) goals and the payment of the higher of the Missouri state or federal Davis-Bacon prevailing wage rates. Submissions must be made electronically via the Bid Express Online Portal, accompanied by a comprehensive package including a signed bid proposal, various affidavits, and detailed DBE participation forms. Final acceptance of the project is contingent upon meeting ADA and PROWAG standards, with specific quality control requirements for EPS fill and AASHTO accreditation for third-party concrete testing facilities.
City of St. Louis Board of Public Service

POSTED

about 8 hours ago

DEADLINE

in about 14 hours
View Details
NAICS: 237310
New
SLED
Construction of Sun Mountain Boulevard
Solicitation # 26-009
The City of Pueblo has issued solicitation 26-009 for the West Side Improvements Project, which primarily involves the construction of Sun Mountain Boulevard. This project consists of building a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street, featuring ADA-compliant curb ramps, storm sewers, water mains, and a double box culvert at the Wildhorse Creek Drainageway. Additionally, the broader initiative includes the implementation of three bus stop packages covering 67 locations. The project is funded through a U.S. Department of Transportation Federal Highway Administration RAISE Grant, necessitating strict adherence to federal requirements, including the Davis-Bacon Act for prevailing wages, Buy America and Build America Buy America (BABA) domestic sourcing preferences, and Title VI of the Civil Rights Act of 1964. The contract will be awarded to the responsible bidder providing the lowest and most responsive total base bid plus any selected alternates. Bidders must provide a bid bond for five percent of the grand total, and the successful contractor must furnish performance and payment bonds within ten business days of notice. Key performance requirements include a minimum of 100 training hours dedicated to workforce development and labor-management partnership programs. Technical compliance is governed by CDOT Standard Specifications and specific project addenda, with particular emphasis on geotechnical recommendations and strict packaging and storage standards for biotic soil amendments. Bids are submitted electronically via the OpenGov portal, with a final deadline of November 4, 2026.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
NH-099-1(033) Kamehameha HWY Intersection Improvements Kuala St
Solicitation # B27000703
Solicitation B27000703, titled NH-099-1(033) Kamehameha HWY Intersection Improvements Kuala St, is a project managed by the Hawaii Department of Transportation to improve the intersection of Kamehameha Highway and Kuala Street in the vicinity of Pearl City, Oahu. The scope of work includes the installation of traffic signals, concrete pavement, and highway lighting upgrades, as well as resurfacing and reconstructing weakened pavement, upgrading guardrails, adding drain lines and storm drain structures, and applying pavement markings and signage. The project must be completed within 663 calendar days from the start work date, and the award will be granted to the lowest responsible and responsive bidder. The contract is subject to various federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America (BABA) Act, and the Disadvantaged Business Enterprise (DBE) program. Required security includes bid, performance, and labor and material payment bonds, along with certifications for workers' compensation and temporary disability insurance. Final acceptance is contingent upon the Engineer's verification that all work is completed, including specific pavement smoothness requirements verified by a High-Speed Inertial Profiler. Proposals must be submitted via the HIePRO portal by the deadline of December 4, 2026.
Department of Transportation

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS