Osceola Avenue Corridor Improvements

Closed
22-0017-ENState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil and infrastructure scopes, including site preparation, land surveying, subsurface investigation, and shoring. Specialized pipeline and utility work is required, specifically tunneling, boring, jacking, micro tunneling, and the installation of steel casing and cathodic protection. Additional requirements include subgrade roadbed construction, asphalt paving, concrete drilling, and the provision of ready mix and precast concrete, as well as site finishing tasks such as landscaping and the installation of traffic signs, signals, and lighting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, bidders must demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for responses is November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 237310
New
SLED
Parking Lot E8 Repairs
Solicitation # CSULBSOQ80
The Parking Lot E8 Repairs project (Project Number PE825PK023) at California State University, Long Beach, involves the complete removal of existing four-inch asphalt pavement and the upper 18 inches of soil, including cement-treated soil. The scope of work requires the installation of new asphalt over non-expansive fill compacted to at least 95 percent relative compaction, as well as the installation of one new EV charging station and the conversion of nine EV-ready stalls to full charging capability. The owner's construction estimate for this public works project is 3,700,000 dollars, with anticipated construction occurring between April 1 and July 30, 2027. Bidders must hold a valid California contractor's license in either the C-12 or B classification and must be prequalified through the PlanetBids portal. A mandatory site walk was scheduled for November 16, 2026, and sealed bid proposals are due by 2:00 p.m. on December 16, 2026. The project is subject to prevailing wage rate laws, requiring all contractors and subcontractors to be registered with the Department of Industrial Relations. Additionally, the project will be enrolled in the CSU Builders Risk Insurance Program and potentially the Owner-Controlled Insurance Program. Award will be based on the lowest responsive and responsible bid, with specific incentives provided for Disabled Veteran Business Enterprise (DVBE) participation. While a minimum of 3 percent DVBE participation is required, incentives ranging from 1 to 3 percent are available for participation levels between 4 percent and 6 percent or more, subject to a 50,000 dollar cap when combined with Small Business Preferences and a total cumulative adjustment limit of 100,000 dollars.
Purchasing Office Department of California State University, Long Beach

POSTED

about 5 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
T32-D6-Drainage A1 Cherokee-Pickens-194617
Solicitation # 48400-eRFQ-002148-2027
The Georgia Department of Transportation (GDOT) is soliciting bids under solicitation number 48400-eRFQ-002148-2027 for Drainage Rehabilitation, Repair, Replacement, and Miscellaneous Maintenance Services. These services are ancillary to the construction and maintenance of public roads within the state of Georgia. Eligibility is strictly limited to Qualified Contractors who have been awarded a Master Service Agreement (MSA) through prequalification process 48400-410-000043083. All participants are subject to the terms and conditions of MMSA 48400-410-000034480 and the specific requirements of the Invitation to Bid/Request for Quote. The submission deadline for this solicitation is November 17, 2026, at 5:00 PM EST. Required documentation for a valid bid includes the bidder's contact information, a completed Tax Compliance Form, and a notarized Georgia Security and Immigration Compliance Act Affidavit for the contractor and any applicable subcontractors. Additionally, offerors must certify that they are not a scrutinized company conducting business in Sudan as defined by O.C.G.A. Section 50-5-84 and acknowledge strict communication restrictions regarding state staff, board members, and legislators. All bid packages must be uploaded electronically through the designated supplier attachment section of the sourcing portal.
Department of Transportation

POSTED

about 5 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Clearwater’s Osceola Avenue Corridor Improvements solicitation, project number 22-0017-EN, is a sealed-bid public works project managed by the Public Works department in Clearwater, Florida, with bids due by September 21, 2026. The work is centered on Osceola Avenue from Court Street to Drew Street, a critical downtown corridor that supports daily mobility, major downtown events at Coachman Park and the Capitol Theatre, and access to nearby development activity including the Osceola Parking Garage, The Bluffs, and Harborview. The solicitation is a unit-price construction contract with required bid-on-all-items pricing, and the city anticipates a single award. While the full contract value is not stated, the bid schedule includes multiple pay items and two not-to-exceed allowances of $150,000 each for phasing/coordination and temporary access/special event accommodation. The contract calls for roadway reconstruction, stormwater and utility improvements including potable water, reclaimed water, and sanitary sewer work, as well as pedestrian and signal upgrades, intelligent transportation systems, landscaping, and related reconstruction activities. The project also includes a project site and utility coordination framework, and the contractor is expected to manage adjacent work, maintain safe access and mobility, minimize disruption to residents and businesses, and accommodate downtown events throughout construction. The solicitation documents include instructions to bidders, supplemental general conditions, supplemental technical specifications, and appendix forms and supporting project documentation. Bid submission requirements are specific: bidders must provide the required bond/security, affidavits, addenda acknowledgment, proposal pages, scrutinized companies certification, and E-Verify form, with electronic submission through the city procurement portal preferred and fax or email submissions prohibited. Bid security is required in the amount of 10% of the maximum bid price, and the successful bidder must furnish payment and performance bonds before the security is released. The supplemental instructions impose a four-page limit and formatting rules on technical proposals, and require content addressing project approach, qualifications, comparable projects, references, staffing, subcontractors, and responsible office information. The supplemental general conditions emphasize coordination and phasing, requiring a coordination matrix and project coordination plan within 14 days after notice to proceed, and integrating adjacent project milestones and special events into the CPM schedule. Technical requirements also include compliance with specific material and installation standards, including supplemental specifications for TEAM InsertValve and split restraint devices, packaging and storage requirements, quality assurance and field quality control provisions, property preservation obligations, and ADA-compliant sidewalk replacement where needed. Administrative and contractual details identify

General Info

Clearwater downtown corridor reconstruction; unit-price sealed bid, due September 21, 2026, with utility, roadway, event coordination.

Place of Performance

FL, USA

Set-Aside

NONE

Documents

6

22-0017-EN Osceola Avenue Corridor Improvements ITB

PDF, High priority: read this firstitb
High

Osceola Ave Bid Docs – Section IVa Supplemental Technical Specifications

PDF, High priority: read this firstsow
High

Osceola Corridor Improvements Project - Section IIA Supplemental Instructions

PDF, High priority: read this firstsow
High

Osceola Corridor Improvements Project - Section IIIA Supplemental General Conditions

PDF, High priority: read this firstsow
High

Appendix Forms and Other Project Documentation

PDF, Low priorityother
Low

22-0017_EN_Osceola_Ave_-_PLANS_S&S.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts2 people available
OfficeClearwater, FL, 33756, USA
Organization / AgencyFlorida → Public Works
Office AddressClearwater, FL, 33756, USA
Contacts
Jennifer BurgettContract and Procurement Specialist
Kelly RogersProcurement Analyst II

Interested Companies (65)

Crisdel GroupTampa, FL
DB Civil ConstructionSaint Augustine, FL
Gibbs & RegisterWinter Garden, FL

See All 65 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Osceola Avenue corridor is a vital component of Clearwater's downtown transportation network and is located adjacent to several ongoing development projects, including the Osceola Parking Garage, The Bluffs, and Harborview. The corridor also serves as a primary route for major downtown events at Coachman Park and the Capitol Theatre. The City of Clearwater is soliciting sealed bids from qualified contractors for construction of the Osceola Corridor Improvements. The work generally includes roadway reconstruction, stormwater improvements, potable water, reclaimed water and sanitary sewer improvements, pedestrian and signal improvements, intelligent transportation systems, landscaping, and related work. The Contractor will be required to coordinate with adjacent construction projects, maintain safe access and mobility, accommodate downtown events, minimize impacts to residents and businesses, and complete the work in accordance with the contract documents.

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Other Heavy and Civil Engineering Construction

POSTED

about 13 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
SLED
Construction of Building at Eagle Skate Park
Solicitation # 2026-ITB-PW-055-MR
The City of Cape Coral, Florida, is soliciting bids for the construction of a new building at Eagle Skate Park under solicitation number 2026-ITB-PW-055-MR. The project involves the construction of approximately 3,870 square feet of facility space, which will include office space, multipurpose rooms, a pro shop, a concession area, and various storage and building support services. The scope of work requires the contractor to provide all labor, materials, and equipment, with a performance period of 365 calendar days for substantial completion and 395 calendar days for final completion. Technical requirements include adherence to the 2017 NEC and NFPA standards, the 8th Edition Florida Building Code, and specific guidelines for electrical, plumbing, mechanical, and landscape installations. Bids must be submitted electronically via the OpenGov platform, with a final deadline of November 10, 2026, at 2:00 PM EST. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a local vendor preference available for those within 2.5 to 10 percent of the low bid. Required submittal documentation includes a bid bond equal to 5 percent of the base bid, a corporate resolution, a non-collusion affidavit, and proof of E-Verify enrollment. Additionally, the contractor must comply with strict environmental protections for the threatened burrowing owl and provide performance and payment bonds recorded in the Lee County Clerk of Courts within 15 days of contract execution. Payments will be issued via direct deposit, contingent upon annual appropriation by the City Council.
Commercial and Institutional Building Construction

POSTED

about 14 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
SLED
Construction of Oasis Sports Fields
Solicitation # 2026-ITB-CP-058-JM
The City of Cape Coral, Florida, is soliciting sealed bids for the construction of the Oasis Sports Fields located at 3415–3519 Oasis Boulevard. This comprehensive project involves the development of a multi-purpose athletic complex featuring seven facilities: a two-story gymnasium and locker building, a concession hall, home and away dugouts, a baseball equipment shed, a track and field equipment shed, and a ticket kiosk. The scope of work includes all labor, materials, and equipment necessary for a code-compliant facility, including structural supports for spectator bleachers, scoreboards, shot clocks, and a wheelchair lift, as well as ADA-compliant access and parking improvements. The contract is based on EJCDC C-700 Standard General Conditions and requires substantial completion within 450 calendar days of the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by December 2, 2026, at 1:30 PM ET. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluations focusing on capacity, past performance, and financial stability. Required submission documents include a bid bond equal to 5 percent of the base bid, a non-collusion affidavit, and a full list of proposed subcontractors. Awarded contractors must provide construction performance and payment bonds. Project specifications mandate strict adherence to ASTM, ANSI, ASME, and IEEE standards, with specific environmental protections in place for gopher tortoise burrows. Payments will be made via direct deposit, contingent upon annual appropriation by the City Council.
Commercial and Institutional Building Construction

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 339950
New
SLED
2709ITB - Citywide Banner Printing & Fabrication
Solicitation # 2709ITB
The City of Daytona Beach is soliciting bids under solicitation 2709ITB for the as-needed printing, fabrication, finishing, packaging, and delivery of various large-format signage, including vertical and horizontal pole banners, event banners, facility banners, and yard signs. This is a production and delivery only contract; installation, removal, and maintenance are specifically excluded. All bids must be submitted electronically via the OpenGov platform by November 19, 2026, at 3:00 pm, as paper submissions will not be accepted. Award will be granted to the lowest responsive and responsible bidder based on the combined total of all line item unit costs in the base bid pricing proposal. Qualified bidders must have at least three years of successful operation and possess the necessary organizational capacity and equipment to meet the city's requirements. Technical specifications mandate the use of heavy-duty vinyl for vertical pole banners with specific tensile ratings and double-sided full-color printing. Bidders are required to provide a bid security equal to 10 percent of the bid and, upon award, performance security equal to 100 percent of the contract price. Additionally, the successful contractor must maintain insurance with a combined single limit of at least 1 million dollars per occurrence and a general aggregate of 2 million dollars. The contract emphasizes strict quality control, requiring vendors to inspect products for dimensions and material quality before delivering them to the Public Works facility at 950 Bellevue Ave. Bidders must also comply with the U.S. Department of Homeland Security E-Verify system and provide a drug-free workplace certification. Local vendor preference under Code 30-86 will be considered as a primary tie-breaking factor. All artwork and production files provided by the city remain its exclusive property and must be protected from unauthorized distribution.
Sign Manufacturing

POSTED

1 day ago

DEADLINE

in 22 days
View Details
NAICS: 541330
New
SLED
Construction, Engineering And Inspection (CEI) Services For The Sands Boulevard And Surfside Boulevard Bridge Repair Projects
Solicitation # 2026-RFP-PW-070-KR
The City of Cape Coral is soliciting proposals for Construction Engineering and Inspection (CEI) services for two federally funded bridge repair projects: the Sands Boulevard Bridge over Eternity Canal and the Surfside Boulevard Bridge over Maxine Canal. The selected engineering firm will provide construction contract administration to restore resiliency to bridge approaches, bulkheads, and shoreline protection. These projects are funded through the FDOT Local Agency Program and must adhere to FDOT manuals, FHWA requirements, and federal-aid compliance standards. The contract duration is 300 calendar days from the Notice to Proceed, and the consultant must be capable of supporting both projects concurrently or independently. The procurement follows a Qualifications-Based Selection process, with proposals due by November 5, 2026. To be responsive, firms must be FDOT prequalified and provide evidence of professional licensure in Florida. Evaluation is conducted by a Selection Advisory Committee based on personnel qualifications, team management, and prior experience. Awarded consultants must provide payment and performance bonds and meet comprehensive insurance requirements for professional and general liability. Compliance mandates include the Davis-Bacon Act, Build America Buy America Act, and specific environmental protections for threatened burrowing owls.
Engineering Services

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
SLED
Wastewater Collections Point Repair and Improvements
Solicitation # 26-0060-UT
Solicitation 26-0060-UT is a unit price contract issued by the City of Clearwater Public Works department for Wastewater Collections Point Repair and Improvements. The scope of work is divided into six groups: Group A for sanitary sewer trenchless reconstruction, Group B for sewer cleaning and televising inspection, Group C for wastewater point repair, Group D for sanitary cleanouts and laterals, Group E for polyurethane manhole surfacing, and Group F for smoke and dye testing. Work is performed on an as-needed basis authorized through individual work orders, and the City is not obligated to a minimum or maximum quantity of work. The initial contract period is 365 consecutive calendar days from the Notice to Proceed, with the City reserving the right to renew for up to three additional years. The contract will be awarded to the lowest responsible and responsive bidder. Bidders must provide bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds upon award. Key technical requirements include compliance with the Florida Trench Safety Act, OSHA provisions, and the City's Utilities Standards and Specifications Manual. Performance is verified through pre- and post-installation CCTV inspections, and payment is contingent upon work being watertight and free of defects. Contractors are required to provide a one-year warranty, or a two-year manufacturer warranty if the standard term cannot be met from the date of substantial completion. Invoicing requires electronic submission of applications for payment accompanied by progress photographs, as-built documentation, and lien waivers.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS