Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on October 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

OSU-265184, Ross Heart Hospital - Administrative Suite Renovation

Closed
State & Local
Submission Closed
Solicitation #
OSU-265184

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
DB Major M&R Sector Lake MIchigan, INTERNAL
Solicitation # 70ZS0127RCLEV00018
The Bristol Alliance of Companies is soliciting design-build services for major maintenance and repairs at the U.S. Coast Guard Sector Lake Michigan in Milwaukee, Wisconsin. This firm fixed-price project, estimated between $5 million and $10 million, involves a comprehensive scope of work including the remodel of the Sector Command Center with a redundant HVAC system and independent emergency power, building envelope repairs featuring the replacement of brick and masonry veneer with insulated metal panels, and the replacement of roof and window systems. Additional requirements include HVAC reconfiguration at the Sector Building, roof and boiler replacement at the Station/UPH Building, and the reconfiguration of UPH restroom facilities. The contractor must utilize an architecture and engineering firm licensed in the State of Wisconsin and adhere to strict security standards, including valid security clearances for personnel handling classified information. The project has a projected period of performance of 350 calendar days, with on-site work commencing within 10 days of the notice to proceed. Award will be granted to the lowest total priced responsive offeror, with proposals due by December 17, 2026. Key administrative details include liquidated damages of $222.29 per day for delays and a requirement for performance and payment bonds within 10 business days of award. All work must comply with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) and applicable International Building Codes. There is no set-aside status for this solicitation.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms with new plumbing fixtures and partitions, updating doors and life-safety components, and repainting interior surfaces. Key technical upgrades involve installing new raised flooring and electrical distribution to support classroom needs, replacing variable air volume (VAV) systems using Automated Logic Corporation components, and correcting plumbing deficiencies. The project is a Total Small Business Set-Aside and is structured as a Firm Fixed Price contract. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three factors of equal importance: Past Performance, Corporate Relevant Experience, and Price. Contractors must provide payment and performance bonds, adhere to Davis-Bacon Act wage determinations, and comply with ADA accessibility guidelines. Deliverables include four electronic and one hard copy of Operation and Maintenance manuals submitted within 30 days of the Beneficial Occupancy Date. The solicitation is managed by the Department of Homeland Security, with a final proposal deadline of December 02, 2026.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 involves the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Site improvements encompass paving, drainage upgrades, and hazardous materials abatement. The project is estimated to cost between $10M and $25M with a completion period of 730 days, and the award will be based on the lowest price. The project is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving removal and replacement. Proposals are due by December 2, 2026. Bond requirements vary by proposal value, with those $150K and greater requiring bid, payment, and performance bonds. Key personnel requirements specify that the Quality Control Manager must be a stand-alone position, though the Superintendent and Site Safety and Health Officer roles may be combined. All work must adhere to NFPA 70, UL standards, and 36 CFR 1191 for accessibility. This solicitation is not set aside for any specific category.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, issued by NAVFAC Northwest ROICC Kitsap, focuses on repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at Naval Base Kitsap in Bremerton, Washington. The scope of work includes addressing a Risk Assessment Code Level 4 deficiency by extending fire sprinklers to Building 719, installing a code-compliant locking system for sprinkler control valves in the basement elevator pits of Building 290, and installing missing backflow preventers on wet pipe sprinkler system risers. The contractor is responsible for producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials, labor, and performance testing. The project is an 8(a) Multiple Award Construction Contract (MACC) with a Firm Fixed-Price structure and an estimated magnitude between $1 million and $5 million. The period of performance is 440 days from the date of award. Evaluation for the award will be based on price and MACC past performance. Key technical requirements include compliance with NFPA 13 standards, UFC 4-010-06 cybersecurity standards for facility-related control systems, and specific hazardous waste handling and labeling protocols. Proposals must be submitted via the PIEE portal by December 16, 2026.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 involves a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to have a construction magnitude between $10 million and $25 million. The scope is divided into two critical phases, requiring the facility to remain operational and mission-capable throughout the process. Phase 1 focuses on engineering design and general renovations, while Phase 2 involves the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contractor must manage multiple mobilization and demobilization cycles to accommodate operational constraints. The project requires strict adherence to NAVFAC, UFC, and IBC standards, with specific requirements for cybersecurity (ATO), fire protection, and electronic security system acceptance testing. The basis of award is Price Only with MACC Past Performance. The period of performance requires work to commence within 15 calendar days of award, with the base bid (CLIN 0001) due within 360 days and an option (CLIN 0002) due within 1082 days. Proposals must be submitted via the PIEE portal, and the contract incorporates various DFARS and FAR clauses regarding cybersecurity, domestic material preferences, and labor regulations.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
Federal
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
Solicitation 26-144 is for a full roof replacement of the 1963 LBJ building at the Atterbury Job Corps Center in Edinburgh, Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks and storm damage, including missing shingles and a damaged roof ridge cap. This is a Small Business set-aside opportunity open to SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. A mandatory site visit is scheduled for December 3, 2026, at 11:00 AM, and proposals must be submitted by December 14, 2026. The contract will be awarded based on best value, evaluated on a 100-point scale covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum contract with a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, and certification of compliance with Davis Bacon Act wage rates. Required documentation includes a W9, vendor questionnaire, and proof of a valid Indiana state contractor's license. The contractor must adhere to EPA and OSHA regulations, as well as state and local building codes. Insurance requirements include automobile liability coverage of at least $200,000 per person and $500,000 per occurrence, and workers compensation meeting state statutory limits. The project includes a one-year workmanship guarantee and a two-year manufacturer's product warranty. Payment terms are Net 30, and the center is tax-exempt.
Atterbury Job Corps – Adams & Associates

POSTED

about 3 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Federal
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the P084 Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additional site improvements include an underground stormwater retention system, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking, and exterior lighting. Option 1 includes the construction of a separate 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is issued by J&J Contractors, Inc. and is designated as a Small Business set-aside, including Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, and Veteran Owned Small Business designations. The project is based on Davis Bacon Wage Rates and is exempt from sales tax. Bidding is open for various trades including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, and plumbing. Interested parties should contact Rahul Maheshwari to receive bid invitations and documents via Building Connected.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 14 hours

AI Contract Overview

Show more

The Ohio State University is soliciting bids for project OSU-265184, involving the interior renovation of the Ross Heart Hospital Administrative Suite on the first floor. The scope of work includes reconfiguring office walls and the break room, expanding the unisex restroom to meet 2010 ADA accessibility standards, and performing mechanical demolition and HVAC insulation. The project also includes two alternates: the installation of a permanent metal stud partition in a conference room to replace a moveable one, and the installation of specific type WD-A doors. The base bid is estimated at 663,000.00 dollars, with additional estimates for the alternates. The contract is scheduled for execution on November 11, 2026, with construction beginning the following day and a completion deadline of January 29, 2027, totaling 79 calendar days. Award will be granted to the lowest responsive and responsible bidder. Requirements for bidders include compliance with prevailing wage rates, a 5.0 percent EDGE participation goal, and evidence of a Drug-Free Safety Program approved by the Ohio Bureau of Workers Compensation. Bids must be submitted electronically via BidExpress by October 19, 2026, and must include a bid security form or an equivalent certified check for 10 percent of the total bid amount.

General Info

OSU interior renovation of Ross Heart Hospital Administrative Suite estimated at 663,000 dollars.

Documents

6
PDF, High priority: read this first3 pages · past-performance
High
PDF, High priority: read this first797 pages · rfp
High
PDF, High priority: read this first26 pages · amendment
High
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first2 pages · ifb
High
PDF, High priority: read this first23 pages · specifications
High

Read all 6 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

25 mandatory

25 requirements in 8 areas

  • Submission7 · 7 must
    001

    Proposal Submission Deadline

  • Compliance6 · 6 must
    009

    Prevailing Wage Payment Requirement

  • Technical4 · 4 must
    015

    Project Location

  • 22 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 25 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 19 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 12, 2026 to Oct 19, 2026.

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe Ohio State University
ContactsNo contacts available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Interior renovation of Ross Heart Hospital Administrative Suite located on the first floor of the Ross Heart Hospital. The interior renovation consists of floor plan changes to reconfigure office walls, break room, and increasing the size of the unisex restroom to meet current accessibility requirements. The renovation also includes an alternate to remove the existing moveable partition dividing two conference rooms outside the administrative suite. A new permanent metal stud partition will be built in its location as part of this alternate bid.

More opportunities from The Ohio State University

Same awarding agency

NAICS: 236220
SLED
SSCBC Pharmacy RTU Supply Exhaust and Control Replacements
Solicitation # RFQ-OSU-275082
The Ohio State University is seeking a Design-Builder for the SSCBC Pharmacy RTU Supply Exhaust and Control Replacements (Project OSU-275082). This project involves the comprehensive modernization of mechanical systems for the oncology compounding pharmacy cleanroom (Suite 4200) and the roof of the Stefanie Spielman Comprehensive Breast Center. The scope includes replacing a failing AAON rooftop air-handling unit, installing N+1 redundant exhaust fans, and retrofitting airflow valves with low-pressure Antec Venturi valves integrated into the Building Automation System. Additional work includes sealing above-ceiling partition walls for pressurization and installing chemical-resistant LED cleanroom luminaires. The project is subject to a strict construction budget not to exceed $2,142,199.00 and requires full-system commissioning, third-party certification, and asset tagging. The selection process is a two-stage Best Value selection. First, a qualifications-based RFQ process will develop a short list of at least three candidates based on firm and team experience. Second, an RFP stage will evaluate short-listed firms based on a combination of qualifications and fee. The selected Design-Builder will provide preconstruction services, including Target Value Design and cost estimating, and construction services using an open-book pricing method for subcontracts. The project requires adherence to University Sustainability Standards, OSHA lead exposure limits, and the EDGE Program, with a participation goal of 5% of total compensation. The project timeline includes a qualifications deadline of December 15, 2026, with the final selection of the Design-Builder expected by February 11, 2027.
Commercial and Institutional Building Construction

POSTED

10 days ago

DEADLINE

in 16 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS