Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

SSCBC Pharmacy RTU Supply Exhaust and Control Replacements

Open
RFQ-OSU-275082State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ohio State University is seeking a Design-Builder for the SSCBC Pharmacy RTU Supply Exhaust and Control Replacements (Project OSU-275082). This project involves the comprehensive modernization of mechanical systems for the oncology compounding pharmacy cleanroom (Suite 4200) and the roof of the Stefanie Spielman Comprehensive Breast Center. The scope includes replacing a failing AAON rooftop air-handling unit, installing N+1 redundant exhaust fans, and retrofitting airflow valves with low-pressure Antec Venturi valves integrated into the Building Automation System. Additional work includes sealing above-ceiling partition walls for pressurization and installing chemical-resistant LED cleanroom luminaires. The project is subject to a strict construction budget not to exceed $2,142,199.00 and requires full-system commissioning, third-party certification, and asset tagging. The selection process is a two-stage Best Value selection. First, a qualifications-based RFQ process will develop a short list of at least three candidates based on firm and team experience. Second, an RFP stage will evaluate short-listed firms based on a combination of qualifications and fee. The selected Design-Builder will provide preconstruction services, including Target Value Design and cost estimating, and construction services using an open-book pricing method for subcontracts. The project requires adherence to University Sustainability Standards, OSHA lead exposure limits, and the EDGE Program, with a participation goal of 5% of total compensation. The project timeline includes a qualifications deadline of December 15, 2026, with the final selection of the Design-Builder expected by February 11, 2027.

General Info

OSU seeks a Design-Builder to modernize pharmacy mechanical systems and cleanroom facilities.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

Read the document

Due in 25 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 25 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyThe Ohio State University
Contacts1 person available
OfficeN/A
Organization / AgencyThe Ohio State University
Office AddressN/A

Full Description

Show more
Project number: OSU-275082
For this project, the Owner will be requesting a Competitive GMP at the time of Request for Proposal as part of the Best Value selection process. This project encompasses the comprehensive modernization of the mechanical systems for the oncology compounding pharmacy cleanroom (Suite 4200) on the fourth floor and roof of the Stefanie Spielman Comprehensive Breast Center (SSCBC). Executed within a strict construction budget not to exceed $2,142,199.00, the renovation ensures continuous regulatory compliance and hazardous drug containment. Key mechanical and controls upgrades include replacing the failing AAON rooftop air-handling unit, installing N+1 redundant exhaust fans, and retrofitting all supply and exhaust airflow valves with low-pressure Antec Venturi valves that are fully integrated into the facility's Building Automation System (BAS). Minimal architectural and electrical enhancements include sealing all above-ceiling partition walls to maintain strict room pressurization and replacing existing lighting with chemical-resistant, sealed LED cleanroom luminaires. The scope concludes with comprehensive asset tagging, full-system commissioning, and third-party certification to validate critical environmental controls and airflow performance. The Program of Requirements (“POR”) will be developed as a part of this project by the Criteria Architect/Engineer (“Criteria A/E”), OSU Wexner Medical Center Facilities Engineers. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner’s policies and procedures. This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of meeting this prerequisite and is responsible to support their subcontractors to meet this requirement. The Asset Tagging Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website (https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards; Building Information Modeling (BIM).
Scope of Services: The Owner will be requesting a GMP as part of the Best Value selection process; therefore, self-performed work will be approved, subject to the firm submitting an acceptable subcontractor plan. The short-listed firms are treated as approved subcontractors for this purpose. There will be no obligation for the selected firm to solicit bids from subcontractors for the purpose of comparing the price of proposed self-performed work. In addition, the contingency utilization provisions related to the award of a low subcontractor bid are waived. The selected Design-Builder (“DB”), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: develop and maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and construction schedules; lead and manage the Schematic Design, Design Development, Subcontractor Prequalification and Bidding process, Construction Documents, Construction and Closeout stages. The project shall follow the applicable University Sustainability Standards: https://fdc.osu.edu/building-design-standards The selected DB will be required to sign the standard agreement provided at time of Request for Proposal. No modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per General Conditions Articles 10.3.7, 10.3.8 and 10.3.9. The preconstruction and construction services are generally described below. With the exception of self-performed work, subcontracts including but not limited to Plumbing, Fire Protection, HVAC, and Electrical trades will be awarded by the DB to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the Criteria A/E and the DB. The Contracting Authority/Owner shall have access to all books, records, documents and other data in the DB's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The DB will work cooperatively with the Contracting Authority/Owner, Criteria A/E and Project Team, and will provide, among other services, schedule development, estimate development, program verification, schematic design, design development, subcontractor prequalification and bidding, construction documents preparation, constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning throughout the preconstruction stages. Construction Services: The DB shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The DB shall hold all subcontracts and shall be fully responsible for the means and methods of construction, weekly progress meetings, testing and inspections, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1- 03-02. The Contracting Authority reserves the right to approve the DB’s selection of subcontractors and any supplemental terms to the subcontract form. The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here: https://fod.osu.edu/resources under the section titled “Construction Site Safety Requirements.” Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e- Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio State University Project Closeout Standards can be accessed via the OSU FOD vender resource website (https://fod.osu.edu/resources) under Post Construction / Close Out. The DB will comply with applicable OSU Wexner Medical Center policies, including the Identification Badge Policy, which incorporates the Non-discretionary Vaccination Policy/Employee Health Infection Control and Background Check Policies, as identified at https://wexnermedical.osu.edu/utility/footer/vendor-interaction. The DB is responsible for all costs incurred related to compliance with these policies. The Davis Bacon Wage Rate Determination applicable to this project is part of this solicitation. The Wage Rate Determination may be modified prior to award. Obtain the Wage Rate Determination by emailing the University Prevailing Wage Coordinator at Sign up to see this detail. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Project Delivery Method (DB with competitive GMP) 2. Project delivery in alignment with strict project budget 3. Experience designing and installing HVAC in support of a Pharmacy or Laboratory space For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330), projects must have been completed by the Design Build Firm.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms by replacing vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing a low-profile raised flooring system with electrical distribution for classrooms, replacing variable air volume (VAV) systems using Automated Logic Corporation components, and upgrading lighting controls and ballasts. The project also requires repainting interior surfaces, installing new signage, and correcting plumbing deficiencies. This procurement is a Total Small Business Set-Aside under NAICS code 236220. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three equally weighted factors: Past Performance, Corporate Relevant Experience, and Price. The contractor must provide payment and performance bonds totaling 100% of the contract price and adhere to strict security and background check requirements, including FBI fingerprinting and DHS non-disclosure agreements. All work must comply with ADA/ABA accessibility guidelines and the FLETC Hazardous Waste Management Plan.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 covers the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project encompasses site improvements such as paving, drainage upgrades, and hazardous materials abatement. The project is estimated to cost between $10 million and $25 million with a performance period of 730 days, with the award based on the lowest price. Bidders must provide pricing for two primary exhibit line items: building renovation and the removal and replacement of paving. The contract requires strict adherence to various standards, including MIL-STD-101 for piping identification and ADA accessibility guidelines. Administrative requirements include the use of Wide Area WorkFlow for invoicing and the submission of monthly work-hour reports and certified payrolls. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for projects valued at $150,000 or more. Government acceptance is contingent upon a final inspection report submitted 14 days prior to testing, with electrical systems evaluated according to NETA ATS standards.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
Solicitation N4425527RB007 is an 8(a) Multiple Award Construction Contract (MACC) task order for a design-build project to repair fire sprinkler deficiencies at Building 290 and the adjoining Building 719 loading dock platform at Naval Base Kitsap, PSNS, in Bremerton, Washington. The contractor is responsible for final design documentation per FC 1-300-09N, labor, supervision, and all materials necessary to resolve critical hazards. Key deficiencies include a Risk Assessment Code Level 4 (RAC-4) deficiency regarding missing sprinklers at the loading dock, unmonitored and unlocked sprinkler control valves in basement elevator pits, and missing backflow preventers on wet pipe sprinkler system risers. Because Building 290 is on the historical register, any exterior modifications require approval from the State Historic Preservation Office (SHPO). The period of performance is 440 days from the award of the task order. Proposals are due by December 2, 2026, at 2:00 PM PST via the PIEE portal and will be evaluated based on price and MACC past performance. Required submissions include a cover letter, a completed schedule of prices, and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. The project mandates strict adherence to safety and technical standards, including EM 385-1-1, the International Plumbing Code, and UFC 3-420-01. Additionally, the contractor must provide a Quality Control Manager, a Site Safety and Health Officer, and comply with FAR 52.219-14 limitation of subcontracting, ensuring no more than 85 percent of the government payment is paid to non-similarly situated entities.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to be valued between $10 million and $25 million and is structured in two phases to ensure the facility remains operational and mission-capable throughout the process. Key scopes of work include the demolition and replacement of deteriorated components, the construction of a 400-square-foot addition for forklift battery charging, and the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. All design documents for both phases must be completed and approved during Phase 1. The contract requires strict adherence to Unified Facilities Criteria (UFC) and cybersecurity standards, including CMMC Level 1 and DFARS safeguarding requirements. Performance is measured by a multi-stage inspection process involving preliminary and final inspections, with specific testing for sound attenuation and electronic security systems. The base bid (CLIN 0001) must be completed within 360 calendar days of award, while the option (CLIN 0002) has a completion window of 1,082 calendar days. Award is based on price and MACC past performance. Proposals are due by December 7, 2026, via the PIEE portal.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This solicitation, number 26-144, is for a full roof replacement of Building 1963 LBJ at the Atterbury Job Corps Center in Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks, missing shingles, and storm damage. The contract is a single lump sum award, with the selection based on best value rather than the lowest price. Evaluation factors include price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). A mandatory site visit is scheduled for December 3, 2026, and proposals are due by December 14, 2026. The successful contractor must provide a sequenced construction schedule within 10 days of the Notice to Proceed and start work within 14 days. Requirements include a one-year workmanship guarantee, a two-year manufacturer's product warranty, and compliance with EPA, OSHA, and Indiana state and local building codes. Bidders must provide a valid Indiana Contractor's License, a W9, a completed vendor questionnaire, and proof of specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30.
Atterbury Job Corps – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 24 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 SF multi-story steel frame laboratory and office facility, as well as an optional 17,978 SF laboratory facility. Construction features shallow foundations, structural steel framing, masonry and metal panel exterior walls, and standing seam roofs. The project also encompasses comprehensive site improvements, including a stormwater retention system, utilities, telecommunications, landscaping, and parking. Additionally, the demolition of Building 1272T, a 548 m2 engineering facility, is required. The contract is a small business set-aside, including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran Owned Small Business, and Service-Disabled Veteran-Owned Small Business. Work is based on Davis Bacon Wage Rates and is exempt from sales tax. Bidding is open for various trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, and plumbing. Interested parties should contact Rahul Maheshwari at J&J Contractors, Inc. to receive bid invitations and documents via BuildingConnected.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
This solicitation is for the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors that comply with all local, state, and federal building codes, while reusing existing closure systems and push bars. The contractor must provide a sequenced construction schedule, a dated punch list for substantial completion, and all necessary training and maintenance manuals. Work must be performed in accordance with EPA and OSHA regulations, and the contractor must adhere to Davis-Bacon Act wage rate decisions. The contract is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Proposals must be submitted as a single lump sum on official company letterhead by December 11, 2026, and must include a valid Indiana Contractor's License, a W9, and proof of insurance. A mandatory bid conference is scheduled for December 1, 2026, and a site visit is required. Payment terms are Net 30, and the project includes a one-year guarantee of workmanship.
Atterbury Job Corps – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
SLED
Construction Manager at Risk Services for Sacramento International Airport Airfield Maintenance Facility Project
Solicitation # 4722
The County of Sacramento, through its Department of Airports, is soliciting Statements of Qualifications from qualified Construction Manager At Risk (CMAR) firms for the Airfield Maintenance (AFMX) Facility project at Sacramento International Airport. The project involves the construction of a new pre-engineered steel structure of approximately 20,000 square feet, with an additional 3,000 square foot accessory structure, designed to centralize maintenance equipment, vehicles, materials, and administrative functions. The estimated construction budget ranges from 17.5 million to 18.5 million dollars, with a base evaluation figure of 18 million dollars for the direct cost of work and general conditions. Eligible firms must hold a current Class B or higher California Contractors License, be registered with the California Department of Industrial Relations for public works, and possess experience with Guaranteed Maximum Price (GMP) contracts and government agencies. The selection process includes a pass/fail initial screening, an evaluation of qualifications, and interviews for the top three ranked respondents. The final award is based on interview performance and other solicitation criteria. The project is divided into a preconstruction phase and a construction phase, with final completion dates to be established during the first phase. The CMAR is responsible for all management, labor, materials, and supervision, ensuring compliance with OSHA, ADA, and FAA Advisory Circular 150/5370-26. Required submissions must be filed electronically via OpenGov by December 1, 2026, at 2:00 PM PST. Selected firms must provide performance and payment bonds and adhere to California Labor Code prevailing wage requirements.
Airports

POSTED

about 12 hours ago

DEADLINE

in 28 days
View Details
NAICS: 236220
New
SLED
General Construction Services For Campus Enclosure - Phase Two
Solicitation # PE-55046-NONST-2027-000000030
The Muscogee County School District is soliciting proposals for General Construction Services for Campus Enclosure - Phase Two in Georgia. The project involves providing metal and masonry fencing to secure the perimeters of multiple campuses, including Brewer, Clubview Elementary, Dimon Elementary, Kendrick High, Midland Middle, Reese Road Elementary, Richards Middle, Waddell Elementary, and Veterans Memorial Middle. The scope of work encompasses all typical construction trades, including mechanical, electrical, plumbing, demolition, painting, and finishes, while ensuring ADA and local ordinance compliance. The project is divided into pre-construction services, such as cost estimating and constructability analysis, and construction services. The contract will be executed using the AIA A133-2019 Standard Form of Agreement, with the successful proposer serving as the Construction Manager at Risk (CM). Payment is structured based on the cost of work plus a fee, with a guaranteed maximum price (GMP). Substantial completion is required no later than July 24, 2027. Proposers must provide proof of 100% performance and payment bonds and maintain comprehensive insurance, including a $5 million excess liability umbrella and builder's risk coverage for 100% of the GMP. Award decisions will be based on the best interest of the School District, evaluating the stability of the proposer, past performance, and the quality of the proposed management plan. Compliance with the Georgia Security and Immigration Compliance Act of 2006 is mandatory.
Muscogee County School District

POSTED

about 13 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from The Ohio State University

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS