Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on February 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Patching and Painting of Affected Areas

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238340
New
SLED
Fire Station #8 Kitchen Remodel - Porcelain Tile Replacement
Solicitation # SPT-27-001
The City of Hialeah is seeking an experienced contractor for the Fire Station #8 Kitchen Remodel, specifically for the removal, disposal, and installation of new porcelain tiles. The scope of work requires the installation of 495 square feet of Prissmacer Ceramica wall tile in Pris Sun Pearl color, sized 30cm x 60cm, using 5027 Silver grout. All work must adhere to applicable building codes, manufacturer installation instructions, and be approved by the Construction and Maintenance Department. The project is managed by the Fire Department under solicitation number SPT-27-001, with the Purchasing Division Director serving as the sole point of contact. Award selection is based on the lowest responsive and responsible bidder, with the City reserving the right to award on a split-order or lump sum basis. To be considered, bidders must submit a quote on company letterhead and a Certificate of Insurance. The selected contractor must be a Florida corporation in good standing, possess all required state and county licenses, and complete a business entity registration before the contract award. Compliance with Florida Statutes regarding E-Verify, human trafficking, and foreign countries of concern is mandatory. Payment terms follow the Local Government Prompt Payment Act, with construction payments processed within twenty-five business days of proper invoicing.
Fire Department

POSTED

about 19 hours ago

DEADLINE

in 14 days
NAICS: 238340
New
Federal
USCG Station Saginaw River Galley Flooring
Solicitation # 70ZL1727QCLEV0004
The US Coast Guard Base Cleveland is soliciting a firm-fixed-price contract for the removal of existing tile flooring and the installation of new epoxy or tile flooring in the galley at USCG Station Saginaw River in Essexville, Michigan. This is a total small business set-aside under NAICS 238340. The contractor must provide all labor, materials, and equipment to ensure the new flooring is smooth, durable, nonabsorbent, and compliant with FDA Food Code 2026, Ch 6-101 Indoor Areas. Additionally, any decorative flake applied must meet a minimum Dynamic Coefficient of Friction of 0.42 per ANSI A326.3. The project requires strict adherence to site safety, dust containment, and a final cleanup that returns the site to its original or better condition. The contract is subject to the Davis-Bacon Act and requires the use of domestic construction materials. Work must commence within five calendar days of award and be completed within 30 calendar days. Award will be granted to the lowest-priced, responsive, and responsible offeror who demonstrates satisfactory performance on similar work within the last three years. Proposals must be submitted to the Contract Specialist by December 3, 2026, and must include a statement on whether the work will be self-performed or subcontracted. Site visits are highly recommended to ensure accurate quoting.
Base Cleveland

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 238340
New
SLED
Fire Station #2 Kitchen Remodel - Porcelain Tile Replacement
Solicitation # SPT-27-003
The City of Hialeah, through its Construction and Maintenance Department, is soliciting bids for the Fire Station #2 Kitchen Remodel. The project requires a qualified contractor to provide all labor, materials, tools, and supervision to remove existing porcelain tiles and setting materials from designated floor and wall areas and install new porcelain tiles. All new tile and layouts must be approved by the Construction and Maintenance Department, and the project specifically requires the use of 5027 Silver grout for both floors and walls. This is an Invitation for Bid (IFB) where the contract will be awarded to the lowest responsive and responsible bidder. To be eligible, contractors must be Florida corporations in good standing, possess all required licenses and certificates of competency for the State of Florida and Miami-Dade County, and must not be listed as convicted or discriminatory vendors. Selected bidders are required to register with the City of Hialeah and utilize the E-Verify system for employment eligibility. Responses must be submitted electronically via the City's e-procurement portal by December 15, 2026. Submissions must include a quote on company letterhead and a Certificate of Insurance, with all pricing and terms remaining valid for sixty calendar days from the solicitation opening. The City reserves the right to terminate the agreement if budgeted funds become unavailable and may award the contract on a lump sum, split-order, or individual-item basis.
Construction & Maintenance Department

POSTED

5 days ago

DEADLINE

in 28 days
NAICS: 238340
New
Federal
Provision of Services for Supply and Installation of Swimming Pool Tiles at US Consulate General Karachi
Solicitation # 19PK4027Q5002
Solicitation 19PK4027Q5002 is a Request for Quotation issued by the U.S. Consulate General Karachi for the supply and installation of swimming pool deck and interior tiles. The scope of work involves replacing deteriorated tiles across a 419 square meter pool deck using natural stone tiles with a leathered finish, as well as replacing 345 square meters of pool floor and wall tiles with high-quality water-resistant porcelain. The contractor is responsible for providing all labor, materials, and equipment, ensuring that deck tiles originate from a single quarry lot for consistency and providing 0.5 percent extra tiles for future repairs. Performance must be completed within 45 calendar days after the notice to proceed, and the contractor must provide an English-speaking supervisor on-site at all times. The government intends to award the contract to the responsible company offering the lowest price, provided they meet all technical and acceptability criteria, including successful Risk Analysis Management vetting. Interested offerors must be registered in the System for Award Management and submit their proposals in English via email by December 02, 2026, at 15:00 Pakistan standard time. Required submission documents include the SF-1442, detailed pricing breakdowns, representations and certifications, and a technical proposal featuring a project completion bar chart and a record of similar work performed over the last three years. A pre-quotation site visit is scheduled for November 19, 2026, with registration required by November 16, 2026.
American Consulate Karachi

POSTED

5 days ago

DEADLINE

in 15 days
NAICS: 238340
New
SLED
Restroom Renovation at Presidio La Bahia State Historic Site
Solicitation # 808-27-270293
The Texas Historical Commission is soliciting competitive sealed bids for comprehensive restroom renovation and flooring restoration at the Presidio La Bahia State Historic Site in Goliad, Texas. The project scope includes demolition of existing Saltillo tile and mortar beds, plumbing drain line scoping, and sub-floor corrections to ensure a strict 1:48 slope and compliance with Texas Accessibility Standards (TAS). The contractor will be responsible for providing all labor, equipment, and materials to install new Saltillo tile, grouting, and gloss sealing, as well as replacing 25 square feet of hallway tile. The work is estimated to be performed between November 28, 2026, and December 28, 2026, and is divided into four milestones covering site preparation, plumbing corrections, flooring finish, and final turnover. Qualified vendors must have a minimum of five years of experience and must attend a mandatory site walkthrough on November 17 or 18, 2026, to obtain a signed Site Visit Form. Bids must be submitted as a single combined PDF to [email hidden] by November 24, 2026, at 2:00 PM CST. Award decisions will be based on best value, considering probable performance indicators and past performance measured by pass/fail criteria. The contract requires strict adherence to the Americans with Disabilities Act (ADA), the Federal Occupational Safety and Health Act of 1970, and various Texas Government Code provisions regarding lobbying, financial participation, and cybersecurity training. Invoices may be submitted monthly, with payments subject to withholding if disputes remain unresolved for 30 days or if the contractor is a delinquent obligor under the Texas Family Code.
Texas Historical Commission

POSTED

7 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

Napa County is seeking a subcontractor for a project focused on the patching and painting of affected areas following demolition work. The scope of work includes repairing damaged walls and surfaces and applying commercial-grade paint. To ensure environmental and health standards are met, all materials used must be low-VOC and CALGreen-compliant. This opportunity was posted on February 10, 2025, and falls under NAICS code 238340. Interested parties must submit their responses by the deadline of March 13, 2025. Further details and submission guidelines can be accessed through the official Napa County bids portal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of PW 24-34.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

JJC Skyline Academy Project, PW 24-34

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Fire Station #8 Kitchen Remodel - Porcelain Tile ReplacementOpen now, due in 15 days
  • USCG Station Saginaw River Galley FlooringOpen now, due in 17 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Napa County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Patching damaged walls and surfaces post-demolition, followed by commercial painting using low-VOC, CALGreen-compliant materials.

More opportunities from California → Napa County

Same awarding agency

NAICS: 541620
SLED
Napa County Regional Climate Action and Adaptation PlanThe Napa County Regional Climate Action and Adaptation Plan is a coordinated regional initiative led by Napa County in partnership with the cities of American Canyon, Calistoga, Napa, St. Helena, and the Town of Yountville, aimed at reducing greenhouse gas emissions and enhancing climate resilience across the county. The plan targets key emission sources including vehicle travel, electricity use, natural gas consumption, and local land use practices, with measurable strategies organized across sectors such as energy, transportation, waste, and land use. Implementation timelines span from near-term actions starting in 2026 to long-term goals extending through 2045, with annualized cost estimates ranging from $386,085 in 2030 to $718,500 by 2045, reflecting projected investments in emissions reduction and adaptation measures. The plan includes specific project actions with clear performance targets and financial projections, though it does not conform to traditional federal procurement structures or include standard FAR clauses, contract line items, or formal bid evaluation criteria. The plan requires rigorous environmental compliance under CEQA, Cal/OSHA, CALGreen, and state and federal endangered species protections, with mandatory biological surveys, qualified biologist oversight, and habitat conservation measures. Construction and project activities must adhere to strict protocols including equipment decontamination to prevent invasive species spread, use of certified weed-free materials, installation of tire track stations, and implementation of spill prevention plans. All personnel must undergo environmental training, and work may be halted immediately if special-status species are detected. Mitigation efforts must include permanent conservation of affected lands via easements, and coordination with CDFW and USFWS is required for any project impacting protected species or habitats. Submission of proposals is due by August 31, 2026, via email, postal mail, or through an online portal, with oversight coordinated by Jesse Gutierrez, Principal Planner – Sustainability at Napa County’s Department of Planning, Building and Environmental Services. While the initiative involves significant environmental and infrastructure investment, it is structured as a policy implementation framework rather than a competitive procurement, with no formal contracting officer, COR, COTR, payment office, or federal accounting identifiers designated.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Fulton Ranch Vineyard Agricultural Erosion Control Plan (ECPA) #P23-00326-ECPA
Solicitation # P26-00176-ECPA
The contract pertains to the implementation of an agricultural erosion control plan for the development of a 4.79-acre vineyard on three parcels within a larger 182.78-acre property in Calistoga, California, with approximately 3.66 net acres designated for planting in five distinct vineyard blocks. It authorizes land-disturbing activities on slopes exceeding 5%, including the clearing of oak woodland, Douglas fir forest, and ruderal vegetation within defined limits, as well as earthmoving, land contouring, and the installation and ongoing maintenance of erosion and runoff control measures necessary to support agricultural infrastructure. The project was approved by the Napa County PBES Director on July 14, 2026, and the associated plan is formally identified as ECPA #P23-00326-ECPA. The activity is governed under the jurisdiction of Napa County, with the place of performance specified as Calistoga, CA 94515, and the primary point of contact is Pamela Arifian, Planner III, who can be reached via email or phone for administrative and regulatory inquiries. Dirk Fulton, Manager and General Partner, is listed as a secondary contact, indicating direct ownership or operational involvement in the project. The plan is publicly accessible through the California Environmental Quality Act database via the linked online portal, ensuring transparency and compliance with state environmental standards. No set-aside or NAICS classification is applied, reflecting its status as a local agricultural development subject to county-level environmental review.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1260 Shady Brook Vineyard Track I Agricultural Erosion Control Plan (ECPA) P25-00011-ECPA
Solicitation # P25-00011-ECPA
The project, identified as P25-00011-ECPA, involves the development of approximately 1.3 gross acres of vineyard within a 41.8-acre parcel located at 1260 Shady Brook Lane in Napa, California. Approved by Napa County on June 29, 2026, the scope of work includes land disturbing activities on slopes greater than 5%, the clearing of oak woodland and ruderal lands, earthmoving, land contouring, and the installation of agricultural infrastructure. The project is supported by a Mitigated Negative Declaration under CEQA, concluding that the development will not have a significant environmental effect provided specific mitigation measures are implemented. Key technical requirements include a soil loss analysis and hydrologic analysis to ensure that sediment delivery and peak runoff do not exceed pre-project levels. Environmental protections are central to the contract, requiring the preservation of oak woodlands, pre-construction surveys for Crotch's bumble bee between April and August, and the installation of protective fencing around Napa bluecurl and Green monardella populations. Additionally, a water availability analysis confirmed that groundwater demands for the vineyard are within the site's recharge capacity. The project is managed by Daniel and Deborah Chen and implemented by Applied Engineering, Inc., with oversight from the Napa County Planning, Building and Environmental Services Department.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541330
SLED
230 Long Ranch Road LLC Vineyard Development Agricultural Erosion Control Plan #P24-00114-ECPA
Solicitation # P24-00114-ECPA
The 230 Long Ranch Road LLC Vineyard Development project, identified by Agricultural Erosion Control Plan #P24-00114-ECPA, involves the development of a vineyard on a 48.42-acre property in St. Helena, California. Approved by the Napa County PBES Director on June 8, 2026, the scope of work includes clearing vegetation, earthmoving, and land contouring to develop approximately 14.8 to 18.8 gross acres of vineyard, consisting of four vineyard blocks with approximately 12.1 to 15.8 net planted acres. The project specifically addresses land disturbing activities on slopes greater than 5% and requires strict adherence to erosion control measures to ensure no net increase in soil loss or runoff. Environmental compliance is a central component of the contract, governed by the California Environmental Quality Act (CEQA). A Mitigated Negative Declaration was adopted following a public review period from November 27 to December 27, 2025. Key environmental mandates include the retention of at least 3.0 acres of chamise alliance habitat and the preservation of 4.1 acres of Scrub Interior Live Oak habitat. The project also requires preconstruction surveys for nesting birds, protection of special-status plant species, and a three-year monitoring period for any replaced vegetation. Technical adequacy has been verified by the Napa County Engineering Division, and the project is subject to a specific grading season from April 1 through September 15. Administration of the project is handled on a time and materials basis, with the Napa County Planning Division overseeing inspections of fencing and habitat preservation before earthmoving begins.
Engineering Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Crush Partners Vineyard Track I Agricultural Erosion Control Plan Application (ECPA) P25- 00003-ECPA
Solicitation # P25-00003-ECPA
The Crush Partners Vineyard project, identified by permit P25-00003-ECPA, involves the development of approximately 18.3 gross acres of vineyard within a 27.98-acre parcel located on Wooden Valley Road in Napa, California. The scope of work includes clearing grassland, earthmoving with approximately 1,000 cubic yards of cut and fill, and the installation of erosion and runoff control measures on slopes greater than 5 percent. The project consists of 7.8 acres of replanted existing vineyard and 7.8 acres of new vineyard, totaling approximately 15.6 net planted acres. Performance requirements include maintaining a permanent cover crop and vineyard avenues with a minimum vegetation cover density of 75 percent to prevent soil loss and manage peak storm flow. The project was approved by Napa County on August 3, 2026, following a Negative Declaration under CEQA indicating no significant environmental impacts. Key technical requirements include a 35-foot setback from ephemeral streams, adherence to a grading season from April 1 through September 15, and preconstruction nesting bird surveys between February 1 and August 31. The project is supported by comprehensive analyses, including a Water Availability Analysis for groundwater use, a Landslide Hazard Evaluation, and a Biological Resources Reconnaissance Survey to protect oak woodlands and special-status species. Administrative terms specify that the applicant, Rob Lloyd, is responsible for all county processing fees, with payments due within 30 days of billing.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
AXR Napa Valley Winery - Major Use Permit Modification, Variance, and Viewshed
Solicitation # P22-00417
The AXR Napa Valley Winery project, approved by the Napa County Planning Commission on June 3, 2026, involves a major modification to Winery Use Permits P08-00099 and P04-0541. The scope of work includes the construction of a 17,190 square foot type I wine cave and the conversion of several existing structures for tasting and hospitality purposes, including a 1,492 square foot barrel storage building, a 1,204 square foot outdoor crush/tank pad, and the 4,147 square foot main floor of the historic Hirsch residence for office and tasting room use. These modifications are intended to support an expanded marketing program and an increase in both employees and visitor traffic at the St. Helena, California location. Infrastructure improvements are a central component of the project, featuring water and wastewater system upgrades and the installation of a left turn lane and driveway modifications on Highway 29. To facilitate these improvements, the project includes a variance to the 600-foot winery setback from SR 29 for aboveground wastewater structures and an Administrative Viewshed Permit for cave portals and utility improvements on slopes between 15 and 18 percent. The project is governed by a Mitigated Negative Declaration, with specific mitigation measures and monitoring plans adopted as conditions for approval. Administrative oversight is managed by Hannah Spencer of the Napa County Planning, Building, and Environmental Services Department.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 111332
SLED
B&F Farms Vineyard Conversion $P25-00029-ECPA
Solicitation # P25-00029-ECPA
The project involves the conversion of approximately 120 acres in Yountville, California, into a vineyard, with 10.1 gross acres developed for planting and 7.4 net planted acres dedicated to vine cultivation. Activities include clearing diverse vegetation types such as non-native grassland, coyote brush scrub, coast live oak woodland, and knobcone pine forest, followed by earthmoving, installation of erosion and runoff controls, and development of agricultural irrigation infrastructure. All work is subject to strict seasonal limitations to protect sensitive species, particularly avoiding ground disturbance during the Northern Spotted Owl nesting season from February through July. Biological surveys for Clara Hunt’s milk-vetch and owl activity must be conducted by qualified biologists using protocols mandated by the California Department of Fish and Wildlife and the U.S. Fish and Wildlife Service, with reports submitted prior to any ground-disturbing activities. A 0.25-mile no-disturbance buffer must be maintained if active nests are detected, and an Incidental Take Permit under the California Endangered Species Act may be required if impacts to protected species cannot be fully avoided. The project is governed by California Environmental Quality Act (CEQA) compliance procedures and has been determined to proceed under a Mitigated Negative Declaration, contingent upon adherence to approved mitigation measures outlined in a Draft Mitigation Monitoring and Reporting Program. Regulatory oversight is administered by Napa County’s Department of Planning, Building, and Environmental Services, with Donald A. Barrella serving as the Principal Planner and primary point of contact. Compliance with the Migratory Bird Treaty Act, CDFW survey protocols, and potential Lake and Streambed Alteration Agreement requirements are mandatory. There is no formal federal contract structure, pricing data, or procurement evaluation criteria; instead, this is a local land-use permit requiring environmental mitigation and regulatory approvals. The project site is located in ZIP code 94558, and all submissions must be filed electronically through the CEQA Submit Portal or physically delivered to Napa County offices, with public review ending on May 29, 2026. No federal acquisition regulations, contract clauses, or financial terms apply, as this falls entirely under state and local environmental permitting authority.
Grape Vineyards

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Barnett Winery - Use Permit (P19-00125-UP), Viewshed Protection Program (P20-00121-VIEW), and Exception to the Road and Street Standards
Solicitation # P19-00125-UP
The Barnett Winery project seeks approval through Napa County to expand operations at its existing 20,000-gallon winery located at 4018/4070 Spring Mountain Road in Calistoga, California. The proposal includes remediation of unpermitted activities such as increased employee count, daily tours and tastings by appointment, marketing events, and on-premise outdoor wine consumption, which have triggered requirements for public water system upgrades, wastewater system improvements, and an exception to the Road and Street Standards for driveway modifications. Beyond compliance, the project proposes significant expansion: increasing annual wine production to 30,000 gallons, raising the full-time employee count to nine, intensifying visitor programs, constructing a new 1,700-square-foot hospitality building with a tasting room and office, adding parking spaces, installing a 12,000-gallon fire protection water tank, and implementing new landscaping, all subject to the stringent design and visual preservation requirements of the Viewshed Protection Program. Environmental compliance is central, with mandatory adherence to CEQA guidelines, implementation of a Mitigation Monitoring and Reporting Program, specific biological surveys to protect nesting raptors during seasonal restrictions, and strict control over stormwater, dust, and groundwater impacts in accordance with Napa County ordinances, California Fish and Game Code, and best management practices from CASQA and BAAD. The project has been processed under a land use permit framework rather than a traditional procurement contract, with no federal acquisition regulations, contract clauses, pricing structures, or procurement-specific terms such as LPTA or Best Value applied. Oversight is managed by Napa County’s Planning and Building Department, with Matt Ringel as the primary point of contact, and key approvals contingent upon engineering certification, environmental mitigation execution, and on-site compliance verification during construction and final inspection phases. All operations must align with existing groundwater protection standards, fire safety codes, and land use zoning restrictions, ensuring that growth is balanced with ecological and aesthetic preservation in the region.
Other Heavy and Civil Engineering Construction

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS