Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Utah was posted on June 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Paving and Asphalt Work

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; heavy construction involving tunneling, boring, jacking, and micro tunneling; and finishing work including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Additional requirements encompass the supply of ready mix, precast concrete, and various utility materials, as well as adherence to Storm Water Pollution Prevention standards. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, with certifications required from approved agencies such as the SBA or MBDA prior to the bid opening. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and furnish bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Interested parties must be invited through the Building Connected electronic system, with the final bid deadline set for November 18, 2025. Primary coordination is managed by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28) is a public works solicitation issued by the County of Marin Department of Public Works. Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, California, the project scope includes the installation of two crosswalks, ADA-compliant concrete landings, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins. Additional work consists of minor grind and pave operations, traffic striping, and pavement markings. The engineer's estimate for the project is $550,000, with a required completion timeline of 35 working days. Bids must be submitted electronically via BidExpress by October 27, 2026. To be eligible, bidders must possess a valid Class A license and be registered with the Department of Industrial Relations (DIR) to perform public work. Submission requirements include a bid security of 10% of the base bid, a bidder's qualification statement, and various certifications, including compliance with CARB Off-Road Diesel-Fueled Fleets Regulations and federal debarment and suspension certifications. The contract award will be based on budget requirements and granted to the responsible and responsive bidder with the lowest total base bid. The project is governed by the 2025 Caltrans Standard Specifications (Divisions II through XII), the 2024 Green Book, and 2018 Marin Uniform Construction Standards. Contractors are required to provide a baseline schedule within 15 days of contract execution and maintain a comprehensive Quality Control program. Payment is processed monthly via payment requests submitted to the Engineer, with change order bills submitted through the Department's internet billing system. The contract also mandates strict adherence to prevailing wage rates per Labor Code Sec. 1720 et seq. and full compliance with ADA and Section 504 accessibility standards.
County of Marin

POSTED

2 days ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

2 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves grading, base preparation, and asphalt paving services specifically for roads, parking lots, and access drives. It is classified under NAICS code 237310, which pertains to highway, street, and bridge construction. The work is designated as a subcontract opportunity issued by the state of Utah, with important deadlines including a posted date of June 12, 2026, and a response deadline of June 25, 2026. Key elements of the contract include the focus on paving and asphalt work, which encompasses a range of preparatory and finishing activities necessary for constructing durable and functional roadways and paved surfaces. While specific details such as the exact location of the work, points of contact, and office addresses are not provided, interested parties can find further information through the provided online link hosted by Utah’s procurement platform. This opportunity is open to qualified subcontractors capable of delivering comprehensive paving and asphalt services within the timeframe outlined.

General Info

Subcontract for grading, base preparation, asphalt paving in Utah; deadlines June 12 and 25, 2026.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of JF27-005-IFB.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction: Perimeter Security Upgrades at Multiple Locations

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Grading, base preparation, and asphalt paving for roads, parking lots, and access drives.

More opportunities from Utah

Same awarding agency

NAICS: 237110
New
SLED
Rose Park Golf Course Irrigation and Turf Reduction / Nibley Park Golf Course Irrigation
Solicitation # PRK23041 / PRK26019
The Salt Lake City Department of Public Services is seeking prequalified contractors for irrigation and infrastructure upgrades at Rose Park Golf Course and Nibley Park Golf Course under solicitation numbers PRK23041 and PRK26019. The scope of work includes the demolition and removal of existing irrigation laterals and heads without disturbing playable turf, the installation of new mainlines, laterals, and heads, and the construction of a two-staged settling pond with clay sealed liners. Additionally, the project requires the installation of a new pump station, wet well, and corresponding piping, as well as electrical equipment and wiring. At Nibley Park, the existing manual irrigation system will be replaced with an automatic system and a new factory-built booster pump station. The estimated value for the work is approximately 6,000,000 dollars for Rose Park and 2,600,000 dollars for Nibley Park. Both courses must remain operational and occupied throughout construction, except within active work phases. To prequalify for bidding, contractors must achieve a minimum score of 75 out of 100 points based on evaluation factors including project experience (40 points), key personnel experience (30 points), and project management approach (30 points). A pass/fail assessment is also conducted regarding safety, training, and certifications. Applicants must provide a Utah State Contractor License, certify at least four years of business longevity, and provide a bonding agent certification letter. Submissions must be made electronically via the Bonfire portal by the specified deadline. The prequalification process is the first step toward separate bidding phases tentatively scheduled for November 2026 for Rose Park and January 2027 for Nibley Park.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 16 days
View Details
NAICS: 115112
New
SLED
AS27-123 Central Utah Aerial Seeding Project Phase 1 - 2026
Solicitation # AS27-123
The State of Utah Division of Purchasing and the Division of Wildlife Resources are seeking a single contract award for the Central Utah Aerial Seeding Project Phase 1 - 2026. This Invitation for Bids aims to secure a responsive and responsible vendor to perform aerial seeding across three specific project areas: the Widemouth 2 Fire Rehab Project Phase I (3,964 acres), the Watts Mtn Phase II Project (2,210 acres), and the Tower Fire Aerial Seeding Project (206 acres), totaling 6,380 acres. The performance period is strictly scheduled from November 4, 2026, through November 16, 2026. Bids must be submitted on a cost-per-acre basis, and the award will be granted to the lowest total cost responsive and responsible vendor. Technical requirements mandate that aircraft be equipped with GPS for 100% coverage and maintain a maximum 80-foot seeding swath width to prevent stripping. The use of drones is strictly prohibited, and operations must be postponed if wind speeds exceed 10 miles per hour. Upon completion, the contractor must provide electronic coverage documentation in UTM projection North America Datum 1983. The contractor is responsible for securing flight operations from airports in Redmond, Fillmore, or Richfield, Utah. Administrative requirements include maintaining Commercial General Liability insurance with limits of $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation. Vendors must certify compliance with E-Verify, anti-boycott laws regarding the State of Israel, and various non-discrimination statutes. Invoices must be submitted within 30 days of delivery and will be paid within 30 days of receipt of a correct invoice. The State Entity reserves the right to inspect deliverables within 30 days of delivery to ensure conformity with the specified standards before final acceptance.
Soil Preparation, Planting, and Cultivating

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 115112
New
SLED
Cherry Fire Aerial Seeding
Solicitation # CS27-114
The State of Utah Division of Purchasing, on behalf of the Division of Wildlife Resources, is soliciting quotes for aerial seeding services for the Cherry Fire project in Tooele County. The scope of work involves the application of a seed mix consisting of grasses, shrubs, and forbs across 4,651 total acres at elevations between 5,700 and 6,700 feet. Specifically, the contractor must apply seed at a rate of 12 lbs/acre over 704 acres of TLA lands and 18 lbs/acre over 3,947 acres of private lands. All work must be completed by November 11, 2026. Technical requirements include the use of GPS technology to ensure 100% coverage and a requirement to begin seeding by 8:00 a.m. to minimize drift, with the government reserving the right to postpone operations if wind speeds exceed 10 miles per hour. The contract will be awarded to the responsive and responsible vendor submitting the lowest cost, with bids required on a cost-per-acre basis. Selected vendors must maintain Commercial General Liability insurance of at least $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation insurance. Administrative terms specify that deliveries are F.O.B. Destination Freight Prepaid and Allowed, with a 30-day window for the state to accept or reject deliverables. Invoices must be submitted within 30 days of delivery, and payments are due within 30 days of invoice execution. Contractors must also comply with the Utah Government Data Privacy Act and certify compliance regarding anti-boycott actions, forced labor restrictions, and E-Verify registration for personnel employed in Utah.
Soil Preparation, Planting, and Cultivating

POSTED

2 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS