Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Periodic Special Events Zoning Code Update, File No. ORD25-0003

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sonoma County Zoning Code is being updated through Ordinance ORD25-0003 to establish a 2,500-person attendance cap for periodic special events that require a Zoning Permit, while clarifying and standardizing the permitting process, public notice procedures, and key definitions related to such events. Events that also require a Special Event Encroachment Permit are exempt from this cap, ensuring that larger or more complex events subject to additional oversight are not unduly restricted. The amendments aim to enhance administrative clarity and consistency for both applicants and county staff, reducing ambiguity in the approval process and minimizing potential conflicts or unintended impacts. This regulatory change is not a procurement or contract action but an administrative update to local land use law, aligned with a CEQA categorical exemption under Section 15061(b)(3) due to its minimal environmental impact. The project is classified as a forecast regulatory action, not a federal contract, and contains no Federal Acquisition Regulation clauses, contracting officer roles, payment or invoicing systems, or procurement-specific requirements such as CLINs, pricing, or contract types. The only associated financial component is a $50 filing fee for environmental documentation, with payment methods including cash, check, or credit. The County of Sonoma acts as the sole lead agency, with no contractors or external vendors involved in carrying out the amendments. All actions are coordinated internally through the Permit Sonoma Project Review Division and the Office of Planning and Research, with Katerina Mahdavi serving as the designated point of contact. Public notice is required through January 12, 2026, and official filings are processed at the County Clerk-Recorder’s office in Santa Rosa, with supporting documents such as the Notice of Exemption and CDFW No Effect Determination submitted as attachments to support the environmental exemption claim. The changes apply countywide and are implemented entirely through local regulatory authority without federal oversight or contractual obligations.

General Info

Establishes 2,500-person cap for special events, clarifies permitting, exempts encroachment-permit events, no federal involvement.

Agency

California → Sonoma County

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Periodic Special Events Zoning Code Update Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sonoma County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sonoma County
Office AddressN/A
Contacts
Katerina MahdaviPlanner II

Full Description

Show more
The ordinance includes amendments to Chapter 26 (Zoning Code) of the Sonoma County Code to establish a 2500-person cap on the number of attendees allowed at periodic special events permitted with a Zoning Permit, and to clarify periodic special event permitting processes, public noticing procedures, and term definitions. Special events that require both a Zoning Permit and Special Event Encroachment Permit would be exempt from the 2500-person attendee cap. The proposed amendments will benefit the public and staff through improved clarity and consistency throughout the Zoning Code and reduce potential for impacts.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SEEKING QUALIFIED SUBCONSULTANTS IN RIVERSIDE COUNTY/SOCAL TO SUPPORT WELL REPLACEMENT PROJECT WITH WATER DISTRICT
Solicitation # seeking-qualified-subconsultants-riverside-countysocal-support-well-replacement-project-water
GHD Inc. is soliciting qualified subcontractors to support the Corydon Well Replacement Design Project for Elsinore Valley Municipal Water District in Riverside County, California, with a focus on engaging Disadvantaged Business Enterprises, Small Business Enterprises, Women-Owned Business Enterprises, Minority-Owned Business Enterprises, and other eligible firms under SBA set-aside programs. The scope of work encompasses a broad range of professional services including engineering, environmental consulting, surveying, geotechnical analysis, permitting, public outreach, and utility location, aligned with NAICS codes such as 541330 and others related to architectural and engineering services, construction, and regulatory support. Interested firms must submit a qualifications package by August 7, 2026, and request solicitation documents by 5 p.m. PST on August 14, 2026, to receive full project details, with the formal response deadline for proposals set for September 15, 2026. All interactions and submissions should be directed to Charlie Brown at charles.brown@ghd.com, and performance is expected to occur within the service area of the Elsinore Valley Municipal Water District in Southern California.
GHD Inc.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project in California, under solicitation number corydon-well-replacement-c2305-1. The project entails designing a new municipal groundwater production well to replace and abandon the existing Corydon well, with work divided into two phases: Phase 1 includes technical specifications, civil site design, line-bid items for drilling and abandonment, bidding assistance, and full-time on-site construction management oversight in compliance with Riverside County and California State Water Resources Control Board requirements; Phase 2 involves detailed architectural, civil, mechanical, structural, electrical, and instrumentation and controls design drawings along with a line-item bid schedule for equipping, testing, and commissioning. The new well must meet AWWA standards, utilize a 24-inch diameter stainless steel Ful-Flo louvered screen, match existing vertical turbine equipment, tie into the Corydon Blend station and Malaga blending location, and comply with SWRCB-DDW, DWR, and EVMWD requirements. Key deliverables include a Preliminary Design Report at up to 30% design completion, review of approximately 200 submittals, assistance with a Domestic Water Supply Permit Amendment, and development of Record Drawings reflecting field changes alongside start-up and operator training support. The contract is governed by the Federal Acquisition Regulation with incorporated clauses including 2 CFR Subtitle A, Part 200, 2 CFR 1400 and 1401, DOI Standard Award Terms, and 48 CFR 52.203-17 for subawards over the simplified acquisition threshold. Respondents must complete mandatory certifications in Attachment “2,” including American Iron and Steel Certification, Debarment and Suspension Certification, SAM Information, Executive Order N-6-22 Certification, Conflict of Interest Disclaimer, Insurance Acknowledgment, Public Works Contractor Registration, and DBE Subconsultant Information. The RFP requires strict adherence to Build America Buy America Act compliance, including domestic-content documentation and waiver procedures for non-compliant materials, and prohibits procurement of equipment from Huawei or ZTE. The award will be based on demonstrated competence and professional qualifications, with evaluation factors weighted as follows: Relevant Qualifications/Experience (25%), Understanding of Project and Project Approach (25%), Scope of Work and Schedule (20%),
Ardurra Group, Inc.

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project entails the design of a new municipal groundwater production well to replace and formally abandon the existing Corydon Well on Elsinore Valley Municipal Water District (EVMWD) property, with all work conducted in compliance with California State Water Resources Control Board and Riverside County regulations. The project is divided into two phases: Phase 1 focuses on hydrogeological evaluation, aquifer analysis, well design matching the existing casing depth and sanitary seal standards per AWWA guidelines, civil and site engineering for wellhead facilities, bidding assistance, and full-time on-site construction management and hydrogeological oversight during drilling. Phase 2 involves engineering design for well equipping—including architectural, structural, mechanical, electrical, instrumentation, and controls systems—alongside support during bidding and ongoing engineering oversight during construction. Technical specifications require a 24-inch diameter stainless steel Ful-Flo louvered screen compatible with local geology, and all materials must comply with the Build America, Buy America Act and domestic content requirements under 2 CFR Part 184, with documented efforts to source U.S.-produced iron, steel, and manufactured products. The project spans from initiation in November 2026 through completion in May 2028, with a contract value not exceeding $1,000,000, partially funded by a $400,000 Bureau of Reclamation grant requiring adherence to federal administrative, audit, and procurement rules under 2 CFR Part 200. Proposals must include detailed qualifications, resumes of key personnel, relevant municipal water and groundwater project experience, current California professional licensure, DBE subconsultant participation details, and a comprehensive cost proposal broken down by task with hourly rates and incidental costs. Submissions must be made through EVMWD’s PlanetBids portal by the September 1, 2026 deadline and include mandatory certifications for debarment and suspension, lobbying compliance, American Iron and Steel compliance, executive order N-6-22 sanctions screening, insurance acknowledgment, and non-collusion declarations. Evaluation prioritizes demonstrated technical competence and experience (25%), followed by understanding of project objectives (25%), schedule and risk management (20%), innovation (10%), cost value (10%), and overall proposal quality (10%), with the award based on qualifications rather than lowest cost. The consultant must provide monthly progress reports, detailed invoices, and maintain full records for four years post-final payment subject to audit. All
GEI Consultants, Inc.

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
SLED
A/E RFQ - Ballistic Aero-Optics and Materials Range Phase 2 - Bryan, Texas
Solicitation # TAMUS-RFQ-01-3489
The Texas A&M University System, through its Office of Facilities Planning & Construction, is seeking qualified Architect/Engineer firms to support the Ballistic Aero-Optics and Materials Range Phase 2 project at the RELLIS Campus in Bryan, Texas. This initiative expands upon a facility completed in 2024 to significantly enhance capabilities in aero-optics and hypersonic testing, including extending aero-optics performance beyond 1,000 meters and hypersonic testing beyond 500 meters, while doubling the recovery tube length from 305 meters to approximately 610 meters. The project calls for the design and construction of critical infrastructure components including a new Tail Building at the south end of the range to house the relocated Laser Firing Tank and final sections of the recovery tube, as well as at least two additional test buildings aligned with project test sections. Standardized 14.6-meter range tube sections will be used throughout the expansion. The total planning budget for the project is $70,605,000, with $17,129,803 allocated specifically for the construction contract, while the remainder covers fees, furnishings, contingencies, and related expenses. Selection will proceed through a qualifications-based process where firms submit statements of qualifications via the e-Builder portal by 2:00 p.m. Central Time on September 1, 2026. The top-ranked respondents may be invited to present their qualifications in an interview, but no pricing or cost information is solicited at this stage. All firms must complete the State of Texas Subcontracting Plan form, for which guidance and a tutorial are provided by the system’s Office of Procurement & Business Services. Inquiries must be directed to Jeff Herring at the Texas A&M University System Office of Facilities Planning & Construction, with contact information provided for phone and email. The solicitation is issued under NAICS code 541330 and administered by a state educational agency with no set-aside provisions identified.
Texas A&M University System

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
International
Transportation and Economic Corridors - Request for Proposal - CON0025815-OVERLAYS of HWY 49:06 and HWY 49:08
Solicitation # AB-2026-05586
Alberta Transportation and Economic Corridors is soliciting proposals from three pre-qualified firms—Associated Engineering Alberta Ltd., Progressive Engineering and Consulting Ltd. (dba CAP Engineering), and ISL Engineering and Land Services Ltd.—for comprehensive engineering services on two sections of Highway 49: Overlay limits 34.946 to 52.425 (WAC0077705) and 0.000 to 2.486 (WAC0077705). The scope includes preliminary engineering, detailed design, contract tendering, contract administration, construction supervision, post-construction review, and warranty inspections. Proposals must be submitted in two separate PDF files under 10 MB each: one detailing technical qualifications and the other containing the proposal fee. This is a Request for Proposal, not an Invitation to Tender, and only submissions from the listed firms will be considered. Alberta Transportation and Economic Corridors reserves the right to request clarifications, accept or reject proposals without negotiation, or negotiate changes with the selected firm. There is no reimbursement for proposal preparation costs. Selection will be based on overall value, not simply the lowest price. The deadline for submissions is September 2, 2026, at 5:30 AM MT, and inquiries should be directed to Rence Balaccua, Project Procurement Officer.
Transportation and Economic Corridors

POSTED

about 20 hours ago

DEADLINE

in 25 days
View Details