Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Phase 2 – Plating Shop Renovation (CLIN 0002)

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
SLED
Design Build Precision Guided Munitions (PGM) Facility Nellis AFB
Solicitation # W912PL26RA022
The U.S. Army Corps of Engineers, Los Angeles District, is soliciting proposals for the design and construction of a Precision Guided Munitions (PGM) Facility at Nellis Air Force Base, Nevada. This firm-fixed-price, single-phase design-build project is a total small business set-aside with an estimated magnitude between 10 million and 40 million dollars. The scope involves the creation of a 14,685 square foot base facility with an option for an additional 1,531 square foot maintenance bay. The high-bay facility will feature reinforced concrete foundations, structural steel frames, fully grouted CMU, and a standing seam metal roof. It is designed to accommodate missile and glide munitions assembly, disassembly, inspection, testing, and repair, including four drive-through work bays, each equipped with a 2-ton overhead bridge crane, a test cell for rocket motors, and secure administrative spaces. The facility must adhere to strict technical and security standards, including DoD Unified Facilities Criteria, Nellis and Creech AFB Installation Facility Standards, and ICD/ICS 705 for secure spaces. Key security requirements include an intrusion detection system, access control, CCTV, and specific cybersecurity protocols for facility systems. The project has a performance period of 730 calendar days following the Notice to Proceed. Award will be based on a best-value tradeoff process, prioritizing the past performance of the prime construction contractor and lead design firm, followed by the technical approach, management plan, and proposed schedule. Eligible offerors must meet CMMC Level 1 requirements and submit their proposals electronically by September 14, 2026.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 2 days
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation FA8137-26-R-0040, is a competitive Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for general construction services. The contract supports a broad range of sustainment, maintenance, repair, alteration, and renovation projects for real property facilities at Tinker AFB, Oklahoma. The scope includes three execution methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total aggregate maximum value of 950 million dollars and is structured with an initial five-year ordering period beginning March 26, 2027, followed by a five-year option period. The procurement is a partial small business set-aside under NAICS 236210. Award decisions are based on the Highest Technically Rated Offeror (HTRO) methodology, where candidates must meet a Minimum Technical Threshold Rating (MTTR) of 8,190 points for Appendix C or 7,140 points for Appendix D. Evaluation focuses exclusively on technical experience, including construction and design history, certifications, and staffing, with no cost evaluation performed at the IDIQ level. Contractors are required to provide 100 percent performance and payment bonds for task orders and must adhere to strict TAFB facility standards, safety regulations, and cybersecurity requirements. Proposals must be submitted electronically to the designated MACC Workflow Org Box, and all offerors must maintain active registration in the System for Award Management.
FA8137 Afsc Pzioc

POSTED

2 days ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The second phase of the plating shop renovation focuses on continued demolition and system integration within an operational environment, requiring careful sequencing to maintain functional continuity during upgrades to the plating line. This subcontract, identified under CLIN 0002, is part of a structured, phased approach to modernize critical infrastructure while minimizing disruption to ongoing operations. The work is constrained by the need to execute tasks sequentially in a live facility, demanding precise coordination, scheduling, and adherence to safety and operational protocols. The project is governed under NAICS code 236210, indicating construction of commercial buildings, and is being conducted under the oversight of the Department of Defense through the W075 Endist Sacramento office. The place of performance is located in the 84041 zip code area. The solicitation, posted on May 4, 2026, requires responses to be submitted by May 26, 2026, at 8:00 PM, with no set-aside classification specified. As a subcontract, this opportunity is likely targeted at specialized contractors experienced in industrial renovation, system integration, and working under stringent military logistics and environmental constraints. The absence of defined point of contact or agency address details suggests that potential bidders must rely on the provided SAM.gov link for full procedural and compliance guidance. Execution of this phase is critical to the broader renovation initiative, with success dependent on technical precision, adaptability in a dynamic work environment, and strict timeline compliance.

General Info

Second phase plating shop renovation, phased demolition, system integration; DoD subcontract, zip 84041 location.

Agency

Department Of Defense → W075 Endist SacramentoView Agency

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

CA, 84041

Set-Aside

NONE

Documents

This scope was carved out of W9123826RA004.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

USACE SPK Hill Air Force Base Plating Shop Renovation SATOC

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W075 Endist Sacramento
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Second phase of renovation, continuing demolition and system integration in a phased, operational environment with sequential execution of plating line upgrades.

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

NAICS: 237990
New
Federal
USACE SPK DBB Construction - Natomas Reach I Contract 2 - Sacramento, CA
Solicitation # W9123826BA010
The United States Army Corps of Engineers Sacramento District is soliciting a firm-fixed-price, design-bid-build construction contract for levee improvements supporting the American River Common Features Natomas Basin. The project focuses on Reach I Contract 2 and Reach H, involving approximately 2.18 miles of landside slope flattening from Gateway Oaks Drive to Northgate Boulevard. Key scope elements include the excavation and reuse of 15,000 cubic yards of levee embankment fill, the import of 12,000 cubic yards of fill, utility relocations, the construction of a 12-foot maintenance road, and tree and stump removal. Additionally, the work includes the exposure and backfill of a 12-inch asbestos cement waterline. Due to environmental and structural constraints, activities impacting the levee prism are restricted to the period between April 15 and November 1. The project is estimated to cost between 10 million and 13 million dollars and is designated as a total small business set-aside under NAICS code 237990. The performance period is 590 calendar days from the receipt of the Notice to Proceed. Award will be granted to the responsive and responsible offeror providing the lowest price for all contract line items. Bids must be submitted electronically via the PIEE system by September 16, 2026. Contractors are required to maintain a quality control system compliant with FAR 52.246-12 and adhere to USACE EM 385-1-1 safety standards. Payment will be processed through the Resident Management System in accordance with FAR 52.232-27, with a 14-day payment window following the receipt of a complete pay request package.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 561730
New
Federal
IIS USFS Tanbark Hazard Tree Removal
Solicitation # W9123826QA035
Solicitation W9123826QA035 is a firm-fixed-price contract issued by the Department of Defense, W075 Endist Sacramento, for hazard tree removal and trimming services at the United States Forest Service Tanbark Administrative Site within the San Dimas Experimental Forest in California. This total small business set-aside, specifically designated for HUBZone and SDVOSB entities, requires the contractor to provide all personnel, equipment, and supervision to fell 75 trees, grind and remove slash, and maintain stumps at a six-inch height. Additional requirements include providing a biological monitor and performing washout stabilization. The project is governed by a 116-day period of performance running from October 1, 2026, to January 31, 2027, and requires specialized qualifications, including a certified arborist and a certified crane operator. The award will be based on price only, provided the offeror is determined responsible and the pricing is not unrealistically low or unbalanced. Key deliverables include pre-work submittals such as an Environmental Protection Plan, an Accident Prevention Plan, and a project schedule. All work must comply with USACE EM 385-1-1 safety standards and the Tanbark Flat Arborist Tree Inventory. Proposals are due by September 22, 2026, at 6:00 PM, with a mandatory site visit held on September 3, 2026. Invoicing and reporting shall be conducted through the Wide Area WorkFlow system.
Landscaping Services

POSTED

2 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS