Pine Valley Dam Flood Damage Repairs Sole Source Justification
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Construction work is required to repair flood damage caused by post-fire flooding in October 2025 at the Pine Valley Reservoir and Dam in Utah’s Dixie National Forest. The damage has resulted in sediment buildup in the reservoir basin, altered excavation boundaries, erosion on the downstream slope, and structural damage to the spillway dissipation basin. The scope includes excavation, slope grading, enlargement of the outlet structure, spillway repairs, masonry reconstruction, riprap installation, and associated earthwork to restore original design grades and ensure the structural integrity and safety of the dam. All work must be executed with strict adherence to engineering specifications to mitigate ongoing risks and prevent future failures. The contract is being awarded on a sole-source basis because the flood repair work is physically and operationally integrated with an existing active reconstruction contract already being performed by Jackson Excavation Inc. Market research and engineering analysis confirm that separating the flood-related tasks into a competitive procurement would create significant safety hazards, scheduling conflicts, and operational inefficiencies due to shared work zones, constrained access, and tightly sequenced construction activities. The incumbent contractor has already mobilized specialized equipment, established site infrastructure, implemented safety and environmental controls, and is actively managing moisture, compaction, and grading in real time across interdependent phases of the project. Introducing a second contractor would lead to overlapping responsibilities, rework disputes, congestion on limited work platforms, and unacceptable risks to project continuity, cost, and dam safety. Only the current contractor possesses the necessary on-site presence, procedural familiarity, and operational control to execute the repairs without jeopardizing the integrity of the broader reconstruction effort.
General Info
Agency
NAICS
Place of Performance
Cedar City, UT, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
DESCRIPTION:
Justification for Other Than Full and Open Competition Notification: 1240LT26P0018
1. Description of Services/Scope:
Construction work is required due to post-fire flooding that occurred in October of 2025 on the Pine Valley Reservoir and Dam, Dixie National Forest, Utah. The flooding introduced significant sediment into the reservoir basin, altered excavation limits, caused erosion on the downstream slope, and damaged the spillway dissipation basin. The work includes excavation, slope grading, outlet excavation widening, spillway repairs, masonry reconstruction, riprap installation, and related earthwork necessary to restore planned design grades and ensure dam safety.
2. Rationale for Other than Full and Open Competition:
There is a current active contract to reconstruct the Pine Valley Dam that had been awarded prior to the flood event. Market research consisted of discussions with engineering staff, review of the project schedule, analysis of the construction sequencing requirements, and evaluation of whether any portion of the added flood-related work could be reasonably separated and competitively awarded. The team reviewed similar dam and embankment projects and confirmed that when additional earthwork and spillway repairs are interwoven with an active construction contract, splitting tasks between contractors reliably results in schedule impacts, safety conflicts, and claims.
The reconstruction work at Pine Valley Dam occurs on limited work platforms with constrained access and requires continuous sequencing of excavation, embankment placement, compaction, and structural construction. Engineering staff confirmed that inserting an additional contractor would prevent proper control of moisture, density, grades, and safety zones. Because the added work occurs within the same trench, slope, or foundation zones as the current Pine Valley Dam Reconstruction contract work, no distinct portion could be competitively separated without creating operational conflicts.
Given the integrated nature of the work, the incumbent’s existing mobilization, and the risks associated with multiple contractors performing interdependent tasks, competitive procedures are not practicable and would not meet the Government’s minimum needs.
3. Unique Qualifications of Selected Source:
The incumbent contractor, Jackson Excavation Inc., is the only contractor capable of performing the required post-fire flood repair work because the added work is physically and operationally integrated with the current ongoing contract construction activities. The additional excavation, embankment reconstruction, outlet widening, slope grading, spillway repairs, and masonry restoration occur in the same locations, on the same work platforms, and within the same tightly sequenced construction phases as the original contract work. These tasks cannot be isolated or separated for performance by a second contractor without creating overlapping responsibilities, conflicting site control, unsafe work conditions, and significant risk of delays or claims.
Much of the added work directly precedes or follows base contract tasks involving compaction, foundation preparation, concrete placements, and embankment stabilization. These operations rely on continuous control of moisture, density, equipment staging, and grade management; conditions that require a single contractor’s uninterrupted execution. If another contractor attempted to perform portions of the work, the original contractor would have to re-enter the same work areas to complete subsequent phases, leading to disputes over workmanship, access, responsibility boundaries, and rework.
The incumbent contractor already has mobilized equipment, established staging areas, implemented environmental controls, and is actively performing work under approved quality-control and safety plans. Introducing a second contractor would require duplicating these setups and would create congestion on narrow haul routes, limited work benches, and constrained access points. Based on site configuration and the integrated nature of dam reconstruction, only the incumbent can perform the work without unacceptable risk to cost, schedule, continuity, and project safety.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS