Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Plaza Improvements

Active
I-26-2059State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation I-26-2059, issued by the Illinois State Toll Highway Authority, covers plaza improvements on the Tri-State Tollway (I-94) between Mile Post 4.7 and Mile Post 13.8 in Lake County, Illinois. The scope of work includes ramp pavement and shoulder replacement, demolition of existing toll plaza median islands, equipment, and canopies, and the construction of barrier wall extensions. Key technical deliverables involve the installation of toll plaza monotubes, lighting, pavement markings, and signing, as well as electrical work including I-PASS antennas, VES camera power and data cables, and quantum-solution loops. The contractor is also responsible for installing conductive resilient flooring in designated rooms, underground conduits, landscaping, erosion control, and the maintenance of traffic. The project is scheduled to begin on or about February 16, 2027, with a final completion deadline of November 11, 2028. Bidders must submit electronic proposals via the BidBuy system by November 13, 2026, at 10:30 a.m. local time and may be required to be pre-qualified by the Illinois Department of Transportation. A bid guaranty of five percent of the total bid amount is required. Performance standards are governed by specific DOT and standard drawings, including SD 94-27A for pavement striping and SD 94-26 for lane markers. Throughout the project, the contractor must ensure all lanes remain operational using existing or temporary equipment and coordinate final work with the Illinois Tollway Business System.

General Info

Illinois State Toll Highway Authority contract for Tri-State Tollway plaza improvements and construction.

Place of Performance

Not specified

Set-Aside

NONE

Documents

60
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
XLSX, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first21 pages · specifications
High
PDF, High priority: read this first50 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first178 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first48 pages · specifications
High
PDF, High priority: read this first36 pages · specifications
High
PDF, High priority: read this first36 pages · specifications
High
PDF, High priority: read this first42 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first1 page · ifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first94 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first16 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityspecifications
Low
PDF, Low priority23 pages · specifications
Low
PDF, Low priority83 pages · specifications
Low
X-CFB

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois Tollway
Contacts1 person available
OfficeIL
Organization / AgencyIllinois Tollway
Office AddressIL

Full Description

Show more
The work under this contract includes ramp pavement and shoulder replacement; removal of the existing toll plaza median islands, equipment, and canopies; structure demolition; construction of barrier wall extensions; installation of toll plaza monotubes, lighting, pavement marking and signing; toll plaza electrical work; landscaping, erosion control, and maintenance of traffic

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements encompass the installation of utilities, manholes, traffic signs, signals, lighting, and landscaping, along with support services for traffic control, storm water pollution prevention, and quality control. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237310
New
SLED
West Side Improvements - Bus Stops Package 1
Solicitation # 26-035
The City of Pueblo is soliciting bids for the West Side Improvements - Bus Stops Package 1 (Solicitation 26-035), a project focused on enhancing community connectivity and mobility. The scope of work involves the rehabilitation of 23 existing bus stops on the west side of Pueblo, including the installation of new concrete pads, sidewalks, curb and gutter, and ADA-compliant curb ramps. Additional improvements include the installation of new or replacement benches and illuminated bus stop signs, specifically utilizing Urban Solar PV Stop+ products. The project is funded through a Federal Highway Administration RAISE Grant and requires strict adherence to the Davis-Bacon Act for prevailing wages, Buy America/BABA requirements, and FHWA construction oversight standards. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid. Key requirements for bidders include a bid security of 5 percent of the grand total bid and the submission of performance and payment bonds prior to the Notice to Proceed. The project has a completion timeline of 180 days, with work commencing within three calendar days of contract execution. Contractors must comply with various federal and local mandates, including EEO bulletin board postings, FFATA reporting, and City of Pueblo licensing and sales tax regulations. All materials and workmanship are guaranteed by the contractor and surety for two years following final acceptance.
Public Works

POSTED

about 6 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
8798
Solicitation # 8798
The Union Lindell Bridge Replacement is a federal construction project (STP-9901(663)) managed by the City of St. Louis Board of Public Service. The scope involves the reconstruction of the Union and Lindell Boulevard Bridge over Forest Park Parkway and the MetroLink Railway in St. Louis, Missouri. Key technical requirements include the installation of MSE retaining walls, steel H-piles, drilled shafts, and specific trackwork components such as transition tie spacing and rubberized gap fillers. The project is governed by a hierarchy of specifications, with Job Special Provisions taking precedence, followed by standards from the City of St. Louis, the Missouri Department of Transportation, and the Metropolitan St. Louis Sewer District. The contract carries a performance responsibility value of approximately 27.41 million dollars and a completion timeline of 452 working days, with liquidated damages set at 4,300 dollars per day. Bidders must provide a 5 percent bid deposit and ensure surety companies have a policyholder rating of A- or better and a financial rating of V or higher. Compliance requirements are extensive, including mandatory E-Verify participation, adherence to the Buy America Certification for iron and steel, and a ten-hour OSHA Construction Safety Program for on-site employees. Additionally, the project mandates strict adherence to Disadvantaged Business Enterprise (DBE) goals and the payment of the higher of the Missouri state or federal Davis-Bacon prevailing wage rates. Submissions must be made electronically via the Bid Express Online Portal, accompanied by a comprehensive package including a signed bid proposal, various affidavits, and detailed DBE participation forms. Final acceptance of the project is contingent upon meeting ADA and PROWAG standards, with specific quality control requirements for EPS fill and AASHTO accreditation for third-party concrete testing facilities.
City of St. Louis Board of Public Service

POSTED

about 6 hours ago

DEADLINE

in about 16 hours
View Details
NAICS: 237310
New
SLED
Construction of Sun Mountain Boulevard
Solicitation # 26-009
The City of Pueblo has issued solicitation 26-009 for the West Side Improvements Project, which primarily involves the construction of Sun Mountain Boulevard. This project consists of building a new 0.75-mile, two-lane roadway connecting 31st Street and 24th Street, featuring ADA-compliant curb ramps, storm sewers, water mains, and a double box culvert at the Wildhorse Creek Drainageway. Additionally, the broader initiative includes the implementation of three bus stop packages covering 67 locations. The project is funded through a U.S. Department of Transportation Federal Highway Administration RAISE Grant, necessitating strict adherence to federal requirements, including the Davis-Bacon Act for prevailing wages, Buy America and Build America Buy America (BABA) domestic sourcing preferences, and Title VI of the Civil Rights Act of 1964. The contract will be awarded to the responsible bidder providing the lowest and most responsive total base bid plus any selected alternates. Bidders must provide a bid bond for five percent of the grand total, and the successful contractor must furnish performance and payment bonds within ten business days of notice. Key performance requirements include a minimum of 100 training hours dedicated to workforce development and labor-management partnership programs. Technical compliance is governed by CDOT Standard Specifications and specific project addenda, with particular emphasis on geotechnical recommendations and strict packaging and storage standards for biotic soil amendments. Bids are submitted electronically via the OpenGov portal, with a final deadline of November 4, 2026.
Public Works

POSTED

about 6 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
NH-099-1(033) Kamehameha HWY Intersection Improvements Kuala St
Solicitation # B27000703
Solicitation B27000703, titled NH-099-1(033) Kamehameha HWY Intersection Improvements Kuala St, is a project managed by the Hawaii Department of Transportation to improve the intersection of Kamehameha Highway and Kuala Street in the vicinity of Pearl City, Oahu. The scope of work includes the installation of traffic signals, concrete pavement, and highway lighting upgrades, as well as resurfacing and reconstructing weakened pavement, upgrading guardrails, adding drain lines and storm drain structures, and applying pavement markings and signage. The project must be completed within 663 calendar days from the start work date, and the award will be granted to the lowest responsible and responsive bidder. The contract is subject to various federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America (BABA) Act, and the Disadvantaged Business Enterprise (DBE) program. Required security includes bid, performance, and labor and material payment bonds, along with certifications for workers' compensation and temporary disability insurance. Final acceptance is contingent upon the Engineer's verification that all work is completed, including specific pavement smoothness requirements verified by a High-Speed Inertial Profiler. Proposals must be submitted via the HIePRO portal by the deadline of December 4, 2026.
Department of Transportation

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Illinois Tollway

Same awarding agency

NAICS: 237310
New
SLED
Systemwide Pavement Repairs
Solicitation # RR-26-2069
Solicitation RR-26-2069, issued by the Illinois State Toll Highway Authority on October 28, 2026, is an advertisement for bids for systemwide pavement repairs across multiple Illinois counties, including Cook, DuPage, Will, Kane, Lake, McHenry, Boone, Winnebago, DeKalb, Ogle, Lee, and Whiteside. The scope of work encompasses full-depth intermittent pavement repairs, asphalt partial depth patching, sealing of asphalt shoulders, pavement crack repairs and sealing, removal and replacement of pavement reflectors, mainline pavement striping, and maintenance of traffic. Performance is specifically noted for the Tri-State, Jane Addams Memorial West, and Jane Addams Memorial East facilities. All work must adhere to Illinois Department of Transportation (IDOT) Standard Specifications and Illinois Tollway Supplemental Specifications. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must be IDOT pre-qualified and submit their bids electronically via the BidBuy portal by December 10, 2026, at 10:30 a.m. local time. A bid guaranty of five percent of the total bid amount is required. The financial structure includes a Contractor's Quality Program valued at 210,000 dollars and various contract allowances for apprentices, concrete temperature control, and additional milling and overlay. Strict penalties are established for non-compliance, including 7,500 dollars per day for non-completion, 10,000 dollars per occurrence for fiber optic utility damage, and 2,500 dollars per incident for traffic maintenance violations.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
SLED
Roadway & Bridge Construction
Solicitation # I-25-4767
Contract I-25-4767 is a solicitation issued by the Illinois State Toll Highway Authority for comprehensive roadway and bridge construction on I-490 between Mile Post 0.9 and 2.8 in DuPage and Cook Counties, Illinois. The scope of work includes earthwork, grading, stockpile and haul road construction, mainline and ramp pavement construction, and the building of bridges, retaining walls, and drainage systems. Additional requirements encompass the installation of lighting, traffic signals, Intelligent Transportation Services infrastructure, Toll Plaza facilities, and overhead sign truss foundations, alongside landscaping, fencing, and maintenance of traffic. The project specifically involves improvements to Ramp Z1, including roadway profiling and the construction of bridges over the ramp with a design speed of 50 MPH. The contract is scheduled to begin on or about March 22, 2027, with a completion deadline of July 15, 2030. Bids must be submitted electronically via BidBuy by November 20, 2026, and require IDOT prequalification and registration with the Illinois Department of Human Rights. The project is subject to rigorous safety and environmental standards, including CDA Construction Safety Manual requirements and OSHA regulations for hazardous materials removal. Financial terms include a 5 percent bid guaranty and various liquidated damages for non-completion or failure to reopen airport runways and taxiways. Technical execution will be guided by IDOT Standard Specifications and AASHTO standards, supported by extensive geotechnical and environmental site assessments to manage soil stability and potential contaminants.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS