Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Plumbing and Piping Systems Installation

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for the installation of potable water, sanitary sewer, and storm drainage piping systems, along with associated fixtures and venting, under a subcontract titled Plumbing and Piping Systems Installation. The work is targeted toward small business entities, with set-asides reserved for Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, SBA-certified Service-Disabled Veteran-Owned Small Business, and Disadvantaged Business Enterprise under the Department of Transportation. The North American Industry Classification System code is 238220, indicating specialized trade contracting for plumbing, heating, and air conditioning. The solicitation was posted on August 4, 2026, with responses due by August 28, 2026, and the contracting agency is Ardurra Group, Inc. The place of performance and detailed location information are not specified, but the opportunity is accessible through a link to the SBA’s procurement portal.

General Info

Plumbing and piping installation subcontract set aside for small and disadvantaged businesses, due August 28, 2026.

Agency

Ardurra Group, Inc.View Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

CA, US

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArdurra Group, Inc.
ContactsNo contacts available
OfficeN/A
Organization / Agency
Ardurra Group, Inc.
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of potable water, sanitary sewer, and storm drainage piping systems, including fixtures and venting.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
Roof Drain and Scupper ModificationsThe contract seeks modifications or replacements of roof drains, overflow drains, and scuppers to ensure full integration with a new roofing system and compliance with International Building Code drainage standards. This work is essential to maintain proper water runoff, prevent structural damage, and meet contemporary safety and performance requirements for the facility. The project is classified as a subcontract under the NAICS code 238220, indicating it involves roofing subcontracting services, and is set aside exclusively for small businesses, including specifically designated categories such as Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses. The solicitation was posted on August 4, 2026, with a response deadline of August 20, 2026, and pertains to the Ottumwa Job Corps facility in Iowa. Although specific location details like street address or zip code are not provided, the place of performance is identified as the Ottumwa Job Corps site, where the roofing system is undergoing replacement. The contract emphasizes compliance with regulatory drainage requirements and requires contractors to have the expertise to coordinate seamlessly with the new roofing installation, ensuring long-term durability and functionality of the drainage infrastructure. All bidders must qualify under one of the specified small business categories and demonstrate the capacity to deliver the work within the given timeframe.
Ottumwa Job Corps

POSTED

about 8 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238220
New
General Plumbing System CorrectionsThe contract titled General Plumbing System Corrections requires comprehensive repairs and corrections to plumbing systems across multiple buildings to ensure compliance with the International Plumbing Code and all applicable safety standards. Work includes repairing or replacing defective piping, fixtures, and water distribution components to restore proper function, eliminate hazards, and achieve long-term reliability. The scope is broad in nature, targeting systemic deficiencies rather than isolated fixes, and demands adherence to strict regulatory requirements to safeguard occupant health and facility integrity. This is a subcontract classified under NAICS code 238220 for plumbing installation and repair, with set-aside status reserved exclusively for small business entities including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses. The opportunity was posted on August 4, 2026, with a response deadline of August 10, 2026, and is administratively managed by the Earle C. Clements Job Corps Center. While specific location details are not provided, performance is expected at facilities operated by the center, and all proposals must demonstrate capability to execute large-scale, multi-building plumbing remediation in alignment with federal compliance benchmarks.
Earle C. Clements Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Ardurra Group, Inc.

Same awarding agency

NAICS: 541620
New
Environmental Compliance and MonitoringThe contract under the title Environmental Compliance and Monitoring requires the provision of stormwater management, erosion control inspections, and regulatory compliance reporting throughout the duration of construction activities. The services are critical to ensuring adherence to environmental regulations and mitigating impacts on surrounding ecosystems during infrastructure development. The successful bidder must conduct routine inspections, document findings, implement corrective actions as needed, and submit timely compliance reports to meet state and federal environmental standards. The work is tied to a specific construction project, though the exact location is not specified in the available data. This is a subcontract awarded under a Small Business set-aside program, allowing eligibility to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, SBA-certified Service-Disabled Veteran-Owned Small Business, and Disadvantaged Business Enterprise entities. The NAICS code 541620 indicates that the work falls under Environmental Consulting Services, aligning with technical environmental monitoring and compliance functions. Solicitations were posted on August 4, 2026, with responses due by August 28, 2026. The contracting agency is Ardurra Group, Inc., and the procurement is linked to the Corydon Well Replacement C2305-1 project, as referenced through the SBA Opportunity portal.
Environmental Consulting Services

POSTED

about 8 hours ago

DEADLINE

in 23 days
View Details
NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project in California, under solicitation number corydon-well-replacement-c2305-1. The project involves replacing an existing groundwater production well with a new 24-inch diameter stainless steel Ful-Flo louvered well screen, matching existing vertical turbine equipment and integrating discharge piping into the Corydon Blend station and Malaga blending location, in full compliance with AWWA, SWRCB, DWR, and EVMWD standards. Services encompass structural, geotechnical, architectural, noise, survey, corrosion, and potholing engineering, delivered in two distinct phases: Phase 1 focuses on civil site design, technical specifications, line-bid items for drilling and well abandonment, bid assistance, and full-time on-site construction management oversight; Phase 2 covers detailed architectural, mechanical, electrical, instrumentation, and controls design for equipment, testing, and commissioning. The contract requires submission of a detailed cost proposal broken down by task, with total estimated project costs at $2,260,788 including $2 million in construction costs and a negotiable not-to-exceed professional services fee. Proposals must adhere to strict format requirements, including a cover letter, demonstrable project experience, resumes of primary staff and subconsultants, three references, and a comprehensive scope of work. Key attachments include Exhibit B for the Schedule of Services, Exhibit C for compensation rates, and Attachment 2 which mandates completion of certifications for American Iron and Steel compliance, lobbying, debarment/suspension, SAM information, DBE subconsultant disclosures, Executive Order N-6-22, conflict of interest, insurance acknowledgment, and public works registration. All proposers must be certified DBEs and submit comprehensive data on any DBE subconsultants used, including certification numbers and justifications for non-selection. The evaluation process prioritizes relevant qualifications and experience (25%), followed by understanding of the project and technical approach (25%), scope and schedule (20%), innovation (10%), cost and value (10%), and overall proposal quality (10%), with award based on demonstrated competence rather than lowest cost. Mandatory compliance requirements include adherence to the Build America Buy America Act, prohibition of covered telecommunications equipment from Huawei or ZTE, sanctions compliance under Executive Order N-6-22
Engineering Services

POSTED

about 8 hours ago

DEADLINE

in 28 days
View Details