Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Plumbing Systems Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Gwinnett County Public Schools is seeking a subcontractor to install sanitary, storm, and potable water systems, including all associated fixtures, piping, and required testing. The contract is categorized under NAICS code 238220 for plumbing, heating, and air-conditioning contractors and is open for bid with a response deadline of August 13, 2026. The work is expected to be performed in Georgia, though specific location details are not provided. The solicitation is issued as a subcontract opportunity without a set-aside designation, indicating it is open to all qualified contractors. Interested parties must submit proposals prior to the deadline through the provided state portal to be considered for award.

General Info

Install sanitary, storm, and potable water systems in Georgia by August 13, 2026, open to all qualified contractors.

Agency

Georgia → Gwinnett County Public SchoolsView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Gwinnett County Public Schools
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Gwinnett County Public Schools
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of sanitary, storm, and potable water systems, including fixtures, piping, and testing.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
ESJC – FIRE EXTINGUISHER SERVICES
Solicitation # esjc-fire-extinguisher-services
This is a subcontracting opportunity for fire extinguisher inspection and replacement services at the Excelsior Springs Job Corps Center in Missouri, solicited under a Request for Quotation with a submission deadline of August 14, 2026, at 12 p.m. CST. The contract requires quarterly inspections of 175 fire extinguishers located across 23 campus buildings and center-owned vehicles, with full replacement of any used, partially used, or uncharged units. Each extinguisher must be tagged with an inspection label, and all work must comply with the current editions of the National Electrical Code and NFPA Standard No. 101, Life Safety Code, as well as applicable OSHA regulations and state, county, and city codes. The service period runs from October 1, 2026, to September 30, 2027, and performance must occur F.O.B. destination with final acceptance conducted by the center, requiring a signed punch list and submitted warranties before payment. The procurement is set aside for small business entities, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Businesses. Bidders must hold an active SAM.gov registration and a Unique Entity ID, and submit a completed bid sheet with a detailed cost breakdown, Missouri-specific licensing and credentials, vendor acknowledgment form, Form W-9, FFATA notice if applicable, anti-lobbying certification, certificates of insurance, and a proposed service schedule. Required certifications include FAR 52.209-6 (debarment), FAR 52.222-41 (Service Contract Act), FAR 52.203-11 (anti-lobbying), and FAR 52.222-55 (minimum wages under EO 14026). Payment will be made within 30 days of invoicing, and no additional charges for packing, delivery, or other incidental costs will be accepted unless explicitly bid and approved. Contractors must adhere to strict conduct rules, including no fraternization with students or staff, prohibition of alcohol, drugs, tobacco, and firearms on site, and compliance with security protocols. The award will be made based on best overall value, not solely on the lowest bid, and ETR reserves sole discretion in evaluation. All bids must be submitted to Michael Bugner at 701 St. Louis Ave., Excelsior Springs, MO
ETR/Excelsior Springs Job Corps

POSTED

about 4 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238220
New
Boiler replacement in IOOF and Administration
Solicitation # boiler-replacement-ioof-administration
The contract seeks a licensed HVAC contractor to replace three boilers across two buildings at the Flint Hills Job Corps Center in Manhattan, Kansas—two units in Building 1 (IOOF) and one high-efficiency unit in Building 2 (Administrative/Academic). The Scope of Work mandates removal of two existing Peerless gas-fired boilers in Building 1 and installation of new units with 1,680,000 B.T.U. input and 1,344,000 B.T.U. output per hour, while Building 2 requires a new 600,000 B.T.U. input, 572,000 B.T.U. output, 94% efficient Energy Star-certified boiler. All work must comply with current Kansas state codes including NEC, NFPA-72, NFPA 101, IBC, IMC, IPC, and IECC, as well as federal EPA regulations 40CFR761 and 40 CFR 61 subpart m, and OSHA 29CFR1926 safety standards. The contractor must install preformed PVC pipe labels with flow direction indicators, secure and store all materials, and ensure compliance with Davis-Bacon wage determinations. Commissioning of the boiler control systems by a qualified agent is required, along with submission of extensive documentation including inspection reports, test results, warranties, commissioning reports, and O&M manuals. Substantial completion must occur within 60 days of the Notice to Proceed, followed by a 30-day closeout period, with all work, including punch-list items, finalized within 120 calendar days of NTP. The contractor must start work within 14 days of NTP and notify the Center at least seven days prior to substantial completion and three workdays before final inspection for walk-throughs and approvals. The contract requires a Certificate of Liability Insurance naming the Center as both Certificate Holder and Additional Insured, current state licensing, and adherence to strict site conduct rules prohibiting fraternization, alcohol, drugs, firearms, and use of center food services. Warranty terms require a 10-year warranty on boiler heat exchangers, a 2-year warranty on all other parts, a 1-year workmanship warranty, and a 1-year preventive maintenance agreement for the Center. Proposals must include a W-9 form and DUNS number, and pricing must be broken down into labor hours, total labor
Serrato Corporation DBA Flint Hills Job Corps

POSTED

about 4 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238220
New
Keystone Lincoln Dorm Water Heater Repair
Solicitation # keystone-lincoln-dorm-water-heater-repair
The contract is for the repair of a specific hot water heater located in the Lincoln dormitory at the Keystone Job Corps Center in Drums, Pennsylvania. The equipment to be repaired is an AquaPlex Turbopower 96, Model #100L400A-TPX with Serial Number F008076, and the work includes replacement or repair of key components such as the blower motor assembly, gas valve, hot surface ignitor, ignitor gasket, and electrode flame rod. The solicitation is set aside exclusively for small business concerns, including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business as defined by the SBA. Contractors must be currently registered and active on Sam.gov to be eligible to respond. Labor standards under the Davis-Bacon Act apply, requiring payment of prevailing wages and submission of certified payroll records. Bidders are required to clearly separate labor and materials costs in their proposals, though no formal pricing schedule, contract value, or estimated budget is provided. The place of performance is fixed at the Keystone Job Corps facility in Drums, PA, and the response deadline is August 14, 2026. No evaluation factors, award methodology, period of performance, or delivery schedule have been specified in the available documentation, and there are no enumerated attachments or packaging requirements outlined. All administrative details, including the solicitation number, contract type, and issuing office, are not formally stated in the provided materials.
Adams & Associates Keystone Red Rock Job Corps

POSTED

about 4 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238220
New
2026-Maui-Dorm Exhaust Fans
Solicitation # 2026- Maui- Dorm Exhaust Fans
This subcontracting opportunity with Management and Training Corporation (MTC) for the Hawaii Job Corps Center – Maui involves the removal and replacement of approximately 25 exhaust fans across three dormitories, requiring full installation, restoration of damaged drywall and plaster, painting to match existing finishes, and comprehensive cleanup. The project is structured as a fixed-price, single lump sum contract with a strict submission deadline of 3:00 PM HST on August 28, 2026, and requires all bids to be submitted via email to Karllene Allen and Mila Handel. Bidders must provide a detailed cost breakout on contractor letterhead, itemizing materials, labor (with categories, hours, and rates), equipment, permits, disposal, testing, commissioning, bonds, subcontractor costs, overhead, profit, and other direct or indirect expenses. A mandatory physical site visit and signature on an attendance roster are required before bid submission, and three references for comparable projects must be provided, with failure to do so potentially disqualifying the bid. The contract value is not specified, but if the bid equals or exceeds $25,000, a 20% bid bond and 100% performance and payment bonds from an A-rated surety are mandatory, along with general liability insurance of $1 million per occurrence and $3 million aggregate, auto liability of $1 million, workers’ compensation of $500,000, and professional liability where applicable. Contractors must comply with prevailing wage requirements under Executive Order 13658, submit weekly certified payroll reports, display bilingual Davis-Bacon posters and the wage determination on-site, and provide two complete operation and maintenance manuals with product data sheets, parts lists, and maintenance protocols, as well as at least two hours of on-site training for facility personnel. All work must adhere to standard commercial packaging practices, follow MTC’s exact shipping instructions, and include proof of shipment documentation upon request. Payment is made through AIA G702 and G703 forms at intervals of completion, with 10% retainage held until substantial completion and formal acceptance by the facility manager or finance director. Substantial completion requires a joint inspection and the creation of a punch list, with final inspection triggered only after written notification of punch list completion. Contractors must also meet federal reporting requirements under FAR clauses, including submission of SF1413, disclosure of executive compensation and first-tier subcontract awards if applicable, and certification of business category under NA
Management & Training Corporation

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 238220
New
NJCC Building 32 Boiler Replacement in Vermont
Solicitation # njcc-building-32-boiler-replacement-vermont
This solicitation seeks bids for the replacement of an existing oil-fired boiler at Building 32 of the Northlands Job Corps Center in Vergennes, Vermont, with a new high-efficiency propane steam boiler system that complies with FEMP JCH-814 standards. The scope of work includes full demolition and proper disposal of the current system, installation of the new boiler and gas burner, replacement of associated components such as the duplex boiler feed tank and control panel, condensate tanks, steam traps, Y strainers, check valves, and condensate receivers, along with new boiler feed water piping featuring a reduced pressure backflow preventer, insulation of all piping, and modification of the existing stack to accommodate the new system. The project also requires installation of a propane gas tank, wiring and testing for proper fuel-oxygen mix, boiler water cleaning and skimming, and full system startup and commissioning. The work must adhere to the International Mechanical Code, International Energy Conservation Code, International Plumbing Code, International Fuel Gas Code, National Electric Code, NFPA Life Safety 101, and NFPA 58. All equipment and materials must be quoted F.O.B. destination, with no additional charges for delivery, packaging, or insurance accepted unless explicitly included and approved by ETR. The solicitation is restricted to small business concerns under the SBA’s set-aside program, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Businesses. Respondents must provide a completed Bid Sheet with detailed line-item cost breakdowns for equipment, materials, and labor, along with all required Vermont licensing and credentials, a proposed schedule of work, Form W-9, Vendor Acknowledgement Form, applicable FFATA and Anti-Lobbying certifications, and comprehensive insurance documentation including a Certificate of Liability Insurance naming Center/ETR as certificate holder. Bidders must also certify compliance with FAR clauses addressing ethical conduct, debarment, labor standards including Davis-Bacon and EO 14026 minimum wage requirements, and the Service Contract Act. A walk-through is scheduled for August 7, 2026, and bids are due by 12:00 p.m. on August 20, 2026. The winning bidder must maintain an active SAM.gov registration with a Unique Entity ID, and bonding is required based on contract value: a 100% payment bond for projects over $35,0
Northlands Job Corps Center /ETR

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238220
New
RFQ#3857 Freezer Door Replacement
Solicitation # RFQ#3857
This is a subcontracting opportunity issued by Management & Training Corporation (MTC) for the replacement of three walk-in refrigeration doors at the Charleston Job Corps Center located at 1000 Curtis Price Way, Charleston, West Virginia. The solicitation, identified as RFQ#3857 Freezer Door Replacement, is a fee-for-service procurement requiring a lump sum bid for the complete removal and installation of one replacement cooler door and two replacement freezer doors, including all hardware, gaskets, thresholds, and accessories, as well as proper disposal of existing units and cleanup of the worksite. All work must comply with OSHA safety standards, applicable refrigeration and building codes, and must be coordinated with Charleston Job Corps to minimize operational disruption. The contract is subject to the Service Contract Labor Standards under FAR 52.222-41, which mandates compliance with Wage Determination number WD# 2015-4347 (Rev 29) dated July 8, 2025. Bidders must be certified as a small business under NAICS Code 238220 with a size standard of $19 million in annual revenue and must self-certify under one or more eligible socioeconomic categories including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned, or Service-Disabled Veteran-Owned Small Business. Submission deadline is August 17, 2026, at 3:00 PM EST, and proposals must be submitted via email to Wendy Lawrence at wendy.lawrence@mtctrains.com. To be eligible for award, respondents must include a completed Bid Sheet and Breakdown, a fully executed Supplier Packet containing a W-9, Self-Certification Form, and Acceptance of Terms & Conditions, three references for similar projects, and proof of insurance covering $1 million per occurrence and $3 million aggregate in general liability, $1 million in auto insurance, and $500,000 in workers’ compensation, with MTC, the Department of Labor, and Charleston Job Corps listed as certificate holders and additional insured. First-tier subcontractors exceeding $30,000 must disclose any debarment, suspension, or ineligibility status under FAR 52.209-6. Invoicing must be submitted weekly or bi-weekly with detailed breakdowns, purchase order numbers, pricing, and invoice dates. Contractors are required to adhere to D
Management & Training Corporation

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 238220
New
Plumbing and Gas Line Repair
Solicitation # plumbing-gas-line-repair
The contract requires the correction of plumbing and gas system deficiencies at the Earle C. Clements Job Corps Center in Morganfield, Kentucky, to ensure full compliance with the International Plumbing Code and fuel gas safety standards. The awarded contractor must provide all labor, materials, equipment, supervision, and incidentals necessary to complete the work in full operating condition, including specific repairs such as isolating and pressure testing gas lines at Building 305, installing backflow preventers at Buildings 607 and 701, and relocating water piping away from electrical panels at Building 610. All work must include piping, fittings, supports, pressure and leak testing, and full restoration of affected areas. The contractor is also required to deliver two complete operation and maintenance manuals with manufacturer data, certificates of warranties, and provide a minimum of two hours of on-site training for facility staff. The contract is a fixed-price, single lump sum arrangement with an estimated value between $0 and $25,000, and the scope must be completed within sixty consecutive business days after receipt of a written Notice to Proceed, with work commencing no later than five business days after the agreed start date. All bids must be submitted via email by 3:00 PM CST on August 10, 2026, using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout on company letterhead, including itemized material, labor, equipment, fees, subcontractor costs, overhead, and profit. The solicitation is set aside for small business categories including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Business, and requires the bidder to hold a Unique Entity Identifier and a nine-digit Tax ID and DUNS number. Subcontractors with awards exceeding $30,000 must disclose if they or their principals are debarred or suspended by the federal government. Contractors must submit a fully executed SF 1413 form to certify compliance with construction wage payment requirements and provide certified payroll weekly, in accordance with Executive Order 13658 and applicable wage determinations. Insurance requirements include $1 million general liability per occurrence with $3 million aggregate, $1 million auto coverage, and $500,000 workers’ compensation. If the bid is $25,000 or more, a 20% bid bond and 100% performance
Earle C. Clements Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 1 day
View Details

More opportunities from Georgia → Gwinnett County Public Schools

Same awarding agency

NAICS: 518210
New
SLED
Travel Card Program & Reimbursement SystemGwinnett County Public Schools is seeking a subcontractor to provide a comprehensive travel card solution integrated with expense reporting, automated reconciliation, and real-time policy enforcement for employee travel expenditures. The solution must streamline the entire travel expense lifecycle by enabling seamless card issuance, automatic transaction categorization, real-time compliance checks against institutional travel policies, and direct syncing with accounting systems to eliminate manual reconciliation. The system should support multi-user access, detailed reporting dashboards, fraud detection capabilities, and audit-ready documentation to ensure accountability and regulatory adherence across all travel-related spending. The contract is solicited as a subcontract under NAICS code 518210, with a response deadline of September 11, 2026. The solicitation is posted through the Georgia Department of Administrative Services procurement portal, and while no specific place of performance or point of contact is listed, the system must be fully functional and accessible to employees across all school district locations in Georgia. The emphasis is on automation, transparency, and policy compliance to reduce administrative burden, minimize errors, and enhance financial oversight without requiring significant manual intervention from finance staff.
Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 518210
New
SLED
Purchasing Card (P-Card) Program Platform & ProcessingGwinnett County Public Schools is seeking a subcontractor to deliver a secure, configurable online platform designed to issue, manage, and reconcile purchasing cards for vendors supporting the district’s operations. The platform must support end-to-end transaction processing including real-time spending controls, customizable usage limits, vendor-specific restrictions, and automated reconciliation capabilities. It must integrate seamlessly with the district’s existing enterprise resource planning system to ensure accurate financial reporting, audit readiness, and streamlined accounting workflows. The solution should be scalable, highly secure, and compliant with all applicable financial and data protection standards to safeguard sensitive procurement data. The platform must enable school district administrators to monitor vendor spending in real time, enforce policy compliance through configurable rules, generate detailed transaction reports, and resolve discrepancies efficiently. The system should provide intuitive dashboards for card issuance, usage analytics, and exception handling, while supporting multi-user access with role-based permissions. Subcontractors are expected to demonstrate proven experience in delivering similar financial technology solutions for public sector entities, with a focus on reliability, ease of integration, and ongoing support. Proposals are due by September 11, 2026, and the contract falls under NAICS code 518210 for data processing and related services, targeting vendors with expertise in financial software systems tailored for educational institutions.
Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 522210
New
SLED
RFP-2702KM Comprehensive Card Solutions for Purchasing, Travel, Emergency Payroll
Solicitation # PE-77021-NONST-2027-000000196
Gwinnett County Public Schools is seeking qualified suppliers to provide a comprehensive card solution program designed to support purchasing, travel, emergency payroll, disaster disbursements, and other ePayables for public agencies. The program must include purchasing cards, travel cards, virtual and electronic card options, and specialized cards for emergency payroll and disaster relief, all backed by a secure, configurable online administration platform that allows agencies to issue accounts, set spending limits, process payments, and monitor and reconcile transactions in real time. Suppliers must demonstrate the ability to deliver a robust, scalable, and compliant financial services solution that meets the strict oversight and security requirements of a public education system. Proposals must be submitted via the Euna Procurement portal by the deadline of September 11, 2026, at 3:00 p.m., with all inquiries directed through the portal’s message center. The solicitation, identified as PE-77021-NONST-2027-000000196, is open to all qualified vendors without a set-aside requirement, and award may result in one or more contracts. The primary point of contact is Kim Murphy, and detailed information can be accessed through the GCPS Purchasing website or the official Euna Procurement portal. All performance will be within the state of Georgia, and suppliers are expected to ensure full compliance with state and federal financial regulations governing public fund use.
Credit Card Issuing

POSTED

2 days ago

DEADLINE

in about 1 month
View Details