Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Commerce was posted on September 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PMEL Freezer Farm Renovation Project

Closed
1305M326Q0426Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 04, 2026. A critical component of this contract is strict adherence to DBE Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach and recruitment, including posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to provide proof of these specific postings and agency utilizations within the bid package will result in the proposal being deemed non-responsive. Prime contractors are further required to flow these GFE obligations down to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, along with an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project is scheduled for completion within 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor system, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing wastewater treatment plant in service during the first two phases of construction. Managed by C. Overaa & Co., the solicitation encourages participation from small and disadvantaged businesses, including DBE, DVBE, MBE, WBE, and SBE certified firms. There is a specific local hiring goal requiring that 50 percent of the total construction workforce consist of residents from Monterey, San Benito, and Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are required to accept the standard Overaa agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements feature reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation work using rigid inclusions and load transfer mats. The project encompasses a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Site work is extensive, requiring clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, by contacting the primary point of contact to receive the formal bid invitation and documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC has issued a price-based Request for Bid for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes structural modifications such as saw cutting reinforced concrete walls and installing headers, as well as exterior excavation and the construction of retaining walls. A critical requirement of the project is the creation of an ADA-accessible route featuring the necessary ramps, landings, and handrails to reach the existing grade or sidewalk. The contractor is also responsible for weatherproofing the installation and restoring all disturbed interior and exterior surfaces. Bids are due by November 20, 2026, with a projected contract award date of December 4, 2026, and a completion target of March 31, 2027. This is a firm fixed-price solicitation where the lowest responsive and qualified bidder will be selected, subject to budgetary limits and Indian preference requirements under Chapter 10-3 of the Colville Tribal Code. Preference-eligible bidders may be awarded the contract even if their bid is higher than the lowest responsive bid, provided it falls within specific allowable differentials based on the total project cost. Qualified bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Mandatory insurance requirements include Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability of 1 million dollars per accident, and Worker's Compensation as required by Washington state law. Final project acceptance by Colville Fuels is contingent upon the exit being fully operational and receiving all necessary approvals from the Authority Having Jurisdiction.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation 1305M326Q0426 is a request for a firm-fixed-price purchase order to execute the Freezer Farm Renovation Project for the NOAA Pacific Marine Environmental Laboratory in Seattle, Washington. This project is 100% set aside for small business concerns and involves the conversion of Building 3, Rooms 1037 and 1040, into a mission-critical freezer farm. The scope of work includes selective demolition, architectural and interior modifications, the installation of emergency power distribution, HVAC upgrades to support twelve portable laboratory freezers, and the removal and replacement of glass piping. The project also requires fire protection updates, including the installation of a smoke detector and the re-installation of sprinkler heads. The contract is structured with a base period of performance of 365 calendar days following the Notice to Proceed. Key deliverables include modifications to the tracer laboratory and plumbing repairs, with optional line items for the demolition of the existing freezer farm and the creation of 3D building models via laser scanning. Award will be based on the best value tradeoff method, evaluating the quoter's organizational experience, technical approach, and past performance. Quotations must be submitted electronically to Contracting Officer Remo Dela Cruz by September 8, 2026, at 10:00 AM Pacific Time. Compliance requirements include the Davis-Bacon Act for prevailing wages, the provision of bid, performance, and payment bonds, and adherence to Buy American construction material standards.

General Info

NOAA small business solicitation for Freezer Farm Renovation in Seattle, due August 31, 2026.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

WA, 98115, USA

Set-Aside

SBA

Documents

13

1305M326Q0426 Amendment 0001

PDF, High priority: read this firstamendment
High

1305M326Q0426 Amendment 0002

PDF, High priority: read this firstamendment
High

Attachment 4 - Pricing Sheet for Tracer Laboratory Modifications

XLSX, High priority: read this firstpricing-sheet
High

NOAA PMEL Freezer Farm Renovation Project Drawings

PDF, High priority: read this firstdrawings
High

NOAA PMEL Freezer Farm Renovation Statement of Work July 30, 2026

PDF, High priority: read this firstsow
High

PMEL Freezer Farm Renovation SOW Rev. 1

PDF, High priority: read this firstsow
High

PMEL Freezer Farm Renovation SOW Rev 2

PDF, High priority: read this firstsow
High

Pricing Sheet Rev 1 - CLIN Schedule

XLSX, High priority: read this firstspecifications
High

Rev 2 Pricing Sheet for CLIN 0001-0006

XLSX, High priority: read this firstpricing-sheet
High

RFQ 1305M326Q0426 Freezer Farm Renovation Project

PDF, High priority: read this firstrfq
High

RFQ 1305M326Q0426 Questions and Answers

PDF, High priority: read this firstq-and-a
High

Wage Determination WA20260108 for Construction in King County, WA

PDF, High priority: read this firstwage-determination
High

Attachment 2 - Drawings Rev 1

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Aug 31, 2026 to Sep 1, 2026. The notice description changed.

Notice updated

Response deadline changed from Sep 1, 2026 to Sep 8, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Noaa
Contacts1 person available
OfficeSEATTLE, WA, 98115, USA
Organization / AgencyDepartment Of Commerce Noaa
Office AddressSEATTLE, WA, 98115, USA
Contacts
Remo Dela Cruz

Full Description

Show more

4 September 2026


The subject solicitation has been amended.


The purpose of this solicitation amendment is to extend the Request for Quote (RFQ) due date and time. In accordance with this solicitation amendment, quotes are now due 8 September 2026 at 10:00 AM Pacific Time. The following changes are incorporated into the current solicitation amendment:


1. CLINs 0003 (Demolition of Existing Freezer Farm) and 0004 (Three-dimensional (3D) building Model, New Freezer Farm) are now optional CLINs
2. Incorporate Attachment 1 - Statement of Work Revision 2
3. Incorporate Attachment 4 - Pricing Sheet Revision 2


Quoters are required to acknowledge any and all attachments.


Quoters are required to utilize Attachment 4 - Pricing Sheet Revision 2 in submitting price quotations.


See updated attachments uploaded in this posting.


All other terms and conditions remain the same. 


--------------------------


25 August 2026


The subject solicitation has been amended.


The purpose of this solicitation amendment is to extend the Request for Quote (RFQ). Quotes are now due 31 August 2026 at 5:00PM Pacific Time. The following changes are also being incorporated into the current RFQ:


1. Incorporate Revision 1 of Attachment 1 - Statement of Work
2. Incorporate Revision 1 of Attachment 2 - Drawings
3. Incorporate Revision 1 of Attachment 4 - Pricing Sheet
4. Incorporate CLIN 0006 for (Optional) Blue Line Fire Retardant Polypropylene (FFRP) instead of Schedule 40 CPVC. See SOW, Rev 1, page 8. 
5. Post Government responses to industry questions.
6. An additional organized site visit has been scheduled for 28 August 2026 at 9:00 AM Pacific Time. Please refer to Section 2 of the initial RFQ for additional information on site visit requirements. 
 


See updated attachments for further details



--------------------------


  1. This is a combined synopsis/solicitation for commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued.

    Solicitation number 1305M326Q0426  is issued as a request for quotation (RFQ) for the Freezer Farm Renovation Project in support of the Pacific Marine Environmental Laboratory (PMEL) located in Seattle, WA.

    This acquisition is 100% set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.
     
  2. A list of line-item numbers can be found in the SF1449 within the attachment labeled RFQ (CSS) 1305M326Q0426, and items, quantities, and units of measure can be found in the attachment labeled Attachment 4 - Pricing Sheet.
     
  3. Description of requirements for the items to be acquired can be found in the attachment labeled Attachment 1 – Statement of Work (SOW).
     
  4. Dates, place of delivery, and place of acceptance can be found in clauses CAR 1352.246-70 and CAR 1352.270-70 within Section 3 - Contract Terms and Conditions of the attachment labeled RFQ (CSS) 1305M326Q0426. Acceptance terms for this solicitation are f.o.b. destination only.
     
  5. A list of solicitation provisions that apply to the acquisition can be found in Section 5 - Provisions within the attachment labeled RFQ (CSS) 1305M326Q0426.
     
  6. A list of contract clauses that apply to the acquisition can be found in Section 3 - Contract Terms and Conditions within the attachment labeled RFQ (CSS) 1305M326Q0426.
     
  7. The date, time, and place for receipt of quote and point of contact can be found in the solicitation details within the SAM.gov post.

More opportunities from Department Of Commerce Noaa

Same awarding agency

NAICS: 541512
New
Federal
NOAAPort Replacement Capabilities
Solicitation # 142083-27-0002
The Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), and the National Weather Service (NWS) have issued Request for Information (RFI) No. 142083-27-0002 to conduct market research for the replacement of the legacy NOAAPort Satellite Broadcast Network (SBN). The government is seeking information on innovative, high-reliability distribution capabilities—which could be cloud-based, terrestrial, satellite, or hybrid—to deliver mission-critical weather data to a geographically dispersed user community. The replacement system must support the exchange, ingestion, processing, and distribution of data products and must integrate with the NWS Hydrometeorological Interactive Virtual Environment (HIVE) and the Centralized Integrated Real-Time Repository for Unified Services (CIRRUS) using common internet protocols such as APIs and MQTT. This notice is for planning purposes only and is not a solicitation for award; no funds have been authorized or appropriated for this effort at this time. The NWS intends to deactivate the legacy SBN as early as August 31, 2027, and is requesting industry feedback on technical architectures, cloud migration strategies, security protocols, and rough order of magnitude cost estimates. Interested respondents must submit their responses in Microsoft Word or PDF format to the designated points of contact by October 29, 2026, at 12:00 p.m. Eastern Time. The government is utilizing this RFI to inform its acquisition strategy and evaluate potential small business set-aside opportunities under NAICS code 541512.
Computer Systems Design Services

POSTED

1 day ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS