Potable Water Distribution Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Potable Water Distribution Installation involves the installation of potable water distribution systems for prime contractors on Santa Rosa County Public Works projects. The scope of work includes the installation of 12 inch and 14 inch CROP PVC water mains, 14 inch HDPE pipe, fire hydrant assemblies, gate valves, and tapping sleeves. The contractor is responsible for delivering a fully tested and chlorinated system, ensuring all work adheres to the Owner's Utility Design Manual and ASTM density and compaction standards. This project falls under NAICS code 237110, with a response deadline of September 21, 2026.

General Info

Subcontract for potable water distribution installation in Santa Rosa County, deadline September 21, 2026.

Agency

Florida → EngineeringView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-054.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Woodbine Road North Widening Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs potable water distribution systems for prime contractors on Santa Rosa County Public Works projects. Installs 12" and 14" CROP PVC water mains, 14" HDPE pipe, fire hydrant assemblies, gate valves, and tapping sleeves. Performs pressure testing and chlorination per Owner's Utility Design Manual and ASTM density/compaction standards. Delivers a fully tested and chlorinated potable water distribution system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction elements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. Civil works requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. Issued by James W. Fowler Co., the solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The bid response deadline is September 29, 2026. The prime contractor is actively seeking subcontractor pricing and encourages the participation of minority, women, and disadvantaged firms, offering assistance with bonding, insurance, and equipment procurement to maximize M/W/DBE involvement. The project also encourages the utilization of apprentices. All work must be performed according to the plans and specifications provided on the James W. Fowler website.
James W. Fowler Co.

POSTED

about 3 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Florida → Engineering

Same awarding agency

NAICS: 237110
New
SLED
Mid-Clay Water Reclamation Facility (WRF) Ground Storage Tank (GST) No. 3
Solicitation # ITB# 2025/2026-A12
The Clay County Utility Authority (CCUA) has issued solicitation ITB# 2025/2026-A12 for the construction of a 750,000-gallon prestressed concrete ground-level reclaimed water storage tank (GST #3) and associated yard piping at the Mid-Clay Water Reclamation Facility in Middleburg, Florida. With a project budget of 1.5 million dollars, the scope includes site preparation using compacted fill, mobilization, environmental protection, and the delivery of record drawings. The contract will be awarded to the lowest responsive responsible bidder, with a focus on compliance, bidder qualifications, and financial ability. Bids must be submitted via the OpenGov Procurement Portal by October 9, 2026, at 2:00 P.M. EDT, accompanied by a five percent bid security. Eligible contractors must be licensed Florida Underground or General Contractors with at least three years of business history and a record of performing satisfactory work for a Florida government entity within the last three years. Additionally, bidders must have served as the Prime Contractor for at least three lift stations with an average day flow rate of 750 GPM or more within the last ten years. The project timeline requires material procurement to begin within 10 calendar days of the Notice to Proceed, with substantial completion due within 240 days and final completion within 270 days. The agreement is governed by EJCDC C-700 Standard General Conditions with specific supplementary modifications, including a 45-day payment cycle and a one-year statute of limitations for claims. Contractors must provide performance and payment bonds equal to the contract price and maintain comprehensive general liability insurance, including explosion, collapse, and underground coverages. Quality control is managed through a dual-inspection process involving both the contractor's CQC Plan Manager and an independent testing firm employed by the owner.
Water and Sewer Line and Related Structures Construction

POSTED

about 23 hours ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS