Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Professional Design Engineering Services for Lytle Creek Community Center and Park Renovations, Contract No. GB25-006

Closed
RFP F-27-1060State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of San Bernardino, through its Finance Department, is soliciting professional design engineering services for the comprehensive renovation of the Lytle Creek Community Center and Park under Contract No. GB25-006, issued via RFP F-27-1060. The scope includes renovation of interior spaces such as the kitchen, common areas, restrooms, and office, along with exterior improvements like a secondary access path from the parking lot, a concrete patio on the south side of the building, and design of a pad for exterior pre-fabricated restrooms. The work spans five distinct phases: planning, conceptual design, design development, construction documents, and bid and construction support, with deliverables including 30%, 60%, 90%, and 100% design drawings, revised cost estimates, book specifications, bid schedules, plan check coordination, weekly progress meetings, site visits, resolution of RFIs, and final as-built record drawings. All work must comply with federal, state, and local codes, including the Uniform Building Code, California Department of Industrial Relations prevailing wage requirements, and health department standards for kitchen renovations. Proposals must be submitted as a single electronic PDF via the PlanetBids portal by 3:00 p.m. local time on August 6, 2026, and must adhere to a strict format including labeled sections from executive summary to certification of proposal, with no deviations permitted without explicit identification and justification. Evaluation is based on a best-value trade-off approach, with key factors including content quality (25%), fee proposal (25%), proposer experience (20%), team qualifications (15%), clarity and conformance to RFP (10%), and reference feedback (5%). Pass-fail criteria include California licensure, absence of conflict of interest, no unresolved deviations, and no litigation history within five years. The contractor must designate key personnel approved by the City, maintain minimum insurance coverage of $2 million commercial general liability and $1 million auto liability, and prohibit subcontracting without prior written consent. The City holds unilateral option rights to extend the contract for up to three additional one-year terms. All records must be retained for five years subject to audit, and proprietary information must be clearly marked with justification. The place of performance is the Lytle Creek Community Center in San Bernardino, California, with payment and administrative oversight managed by the City’s finance and public works departments.

General Info

San Bernardino seeks design engineering services for Lytle Creek Community Center renovation with strict compliance, phased deliverables, and best-value selection.

Place of Performance

380 South K Street, San Bernardino, CA 92410., CA, USA

Set-Aside

NONE

Documents

3

RFP F-27-1060 Professional Design Engineering Services for Lytle Creek Community Center and Park Renovations

PDF, High priority: read this firstrfp
High

GB25-006 Lytle Creek Community Center Pre-Proposal Sign-in Sheet

PDF, Low prioritypre-proposal-sign-in
Low

Drawings and Cut Sheets.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Finance Department of City of San Bernardino
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts
Jennifer BroadnaxContact

Full Description

Show more
Scope: Renovation of the kitchen, common areas, restrooms, and office. Outdoor improvements include construction of a secondary access path from the parking lot to the community center, construction of a concrete patio on the south side of the community center, and design of a pad for exterior pre-fab restrooms. Services include planning, conceptual design, design development, construction documents, bid and construction support, plan check coordination, cost estimates, book specifications, and as-built record drawings.
Please see solicitation documents for full details.

More opportunities from California → Finance Department of City of San Bernardino

Same awarding agency

New
SLED
CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003
Solicitation # RFQ F-26-4070
The City of San Bernardino Finance Department is soliciting bids for the Connector Pipe Screen (CPS) Phase 4 project, identified as Project No. 13683 and Contract No. SD 26-003. The scope of work involves the preliminary measurement, fabrication, and installation of CPS units within catch basins to intercept stormwater runoff and remove debris larger than 5 mm in diameter. The project requires the use of S-304 stainless steel for frames and S-316 stainless steel for hardware, with specific load capacity requirements to withstand lateral water force and vertical loads when clogged. Contractors must also clean existing catch basins and apply specific interior markings, including staff gauges and red stripes to indicate screen height. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid. Bidders must submit their proposals via the Planetbids portal by November 23, 2026, including a bid guarantee of 10 percent of the total bid price. Successful awardees must provide faithful performance and labor and material payment bonds each equal to 100 percent of the contract price. The project is subject to prevailing wage requirements, California Labor Code compliance for certified payroll and apprenticeships, and a 5 percent retention on progress payments. Work must commence within ten days of the Notice to Proceed, with a required construction schedule and submittal plan delivered shortly thereafter.

POSTED

4 days ago

DEADLINE

in 25 days
View Details
NAICS: 624229
SLED
MAILBOX ONLY – FY 2027-2028 CDBG and ESG Notice of Funding Availability
Solicitation # NOFA FY 2027-2028
The City of San Bernardino's Community Development and Housing Department is seeking applications for FY 2027-2028 Community Development Block Grant (CDBG) and Emergency Solutions Grant (ESG) funding. The city anticipates approximately $2,600,000 in CDBG funds and $256,500 in ESG funds, subject to final HUD allocations. These grants are designed to support community improvements and services that benefit low- and moderate-income residents, specifically addressing housing instability and homelessness. Eligible projects must align with the 2025-2029 Consolidated Plan and CDBG National Objectives. Applications must be submitted through the Neighborly Participant Portal by December 7, 2026, at 3:00 p.m. Pacific Time. Required documentation includes a signed cover letter, current Articles of Incorporation and By-Laws, audited financial statements for the last two fiscal years, and a valid SAM registration with a Unique Entity Identifier (UEI). ESG applicants must specifically provide a 100 percent funding match and serve residents at or below 30 percent of the Area Median Income. Awards are determined via a priority ranking process by a review panel, with final approval granted by the Mayor and City Council. Projects are scored on a 100-point scale, requiring a minimum of 70 points for a funding recommendation. Evaluation factors include project need, alignment with the Consolidated Plan, project description, agency experience, and fiscal capacity. Successful recipients must maintain general liability insurance of at least $2 million per occurrence and adhere to 24 CFR Part 84 and 2 CFR 200 regulations. Quarterly Performance Reports are required every October, January, April, and July.
Other Community Housing Services

POSTED

8 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
SLED
Professional Design Engineering Services for Safe Streets and Roads for All (SS4A) Implementation Grant Plan
Solicitation # F-27-1064
The City of San Bernardino is soliciting proposals under RFP F-27-1064 for professional design engineering services to implement roadway safety improvements at five locations: Highland Avenue at Eucalyptus Drive, 30th Street, Meridian Avenue, Kendall Drive, and Lynwood Drive. Funded by the Fiscal Year 2024 Safe Streets and Roads for All (SS4A) Grant Program through the U.S. Department of Transportation, the project focuses on pedestrian safety, bicycle facilities, traffic control, signalization, lighting upgrades, pavement friction treatments, and sidewalk gap closures. The scope of work includes preliminary engineering, NEPA documentation, right-of-way and utility impact assessments, and project reporting. An option phase may include final engineering design, subsurface utility engineering, utility relocation, and right-of-way acquisition support. Proposals must be submitted electronically via PlanetBids by November 18, 2026. The City will select a consultant based on demonstrated competence, professional qualifications, in-person presentations, and research. Mandatory requirements for qualification include being licensed to practice in California, having no conflicts of interest with the City, and a clean litigation history over the past five years. Selected consultants must comply with 2 CFR Part 200, the Americans with Disabilities Act, and California Labor Code prevailing wage and DIR registration requirements for contracts exceeding 25,000 dollars. The contract requires the assignment of a dedicated Project Manager and the identification of three principal staff members who must attend finalist interviews. Performance will be monitored through a quarterly Performance Measurement Plan and monthly summary reports. Payment terms are set at 45 days from invoice receipt, with detailed documentation required for federal reimbursement. Additionally, the consultant must adhere to Build America, Buy America standards and maintain comprehensive insurance coverage, including professional, cyber, and general liability policies.
Engineering Services

POSTED

9 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS