Professional Engineering Services for the American Martyrs Stormwater Sump Hydrology and Capacity Study

Closed
E1302-25SState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 9 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
Lift Station Communication Improvement (FEMA)
Solicitation # 26-051UM-RFP
The City of Plant City is soliciting proposals under solicitation 26-051UM-RFP for a turnkey engineering design and implementation project to modernize the communication network for 55 wastewater lift stations. The project focuses on replacing or integrating Remote Terminal Unit (RTU) hardware and deploying a new cellular-based communication network to ensure seamless connectivity with the City's SCADA system. This initiative is partially funded by a FEMA grant via the Florida Division of Emergency Management, requiring all work to adhere to strict standards for system hardening, operational continuity, and disaster resilience. The project includes the delivery of pre-configured communication assemblies and requires installation by a licensed electrical contractor, with system startup performed by the supplier. The selection process utilizes a points-based evaluation focusing on the logical sequencing of the proposed project schedule, the credentials of the proposer, and a track record of at least three similar projects completed in Florida within the last ten years. Bidders must provide itemized pricing for site-specific materials and project-wide labor. Compliance requirements are extensive, including adherence to the Davis-Bacon Act, Equal Employment Opportunity regulations, the Americans with Disabilities Act, and specific FEMA sub-recipient agreement terms. Proposals are due by 2:00 pm local time on November 19, 2026, and must include a baseline project schedule, a human trafficking affidavit, and certifications regarding foreign country entities. Final acceptance of the work by the City is required before any applicable warranty periods commence.
Utilities Maintenance

POSTED

about 11 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
SLED
Cellular Service Site Assessment and Feasibility Study
Solicitation # 2026-TA-0906
The Town of Nantucket, through its Town Administration, is soliciting proposals for a Cellular Service Site Assessment and Feasibility Study under solicitation number 2026-TA-0906. The project requires licensed professionals to evaluate the physical, structural, and regulatory suitability of the Town's water storage tanks for future telecommunications use. Key deliverables include a comprehensive final report and presentation, as well as a regulatory and permitting assessment identifying necessary approvals from the FCC, Massachusetts DEP, and the Nantucket Historic District Commission. The anticipated period of performance is twelve months, and the selected contractor must provide a detailed work plan and timeline. Proposals must be submitted electronically by November 4, 2026, divided into separate technical and price volumes. To be considered, firms must meet minimum qualifications, including at least three years of full-time experience in similar work and a proven ability to complete projects for comparable or larger municipalities. Evaluation is based on a minimum quality review followed by a comparative ranking of finalists based on project understanding and relevant experience. The Town will negotiate with the highest-ranked finalist whose price falls within the budgeted amount. The contract is governed by the laws of the Commonwealth of Massachusetts and requires the contractor to enter into the Town's standard 30B Form Service Agreement. Mandatory requirements include providing a Tax Compliance Certification, a Certificate of Non-Collusion, and evidence of financial stability. Comprehensive insurance coverage is required, including Commercial General Liability of $1 million per occurrence, a $3 million Umbrella/Excess Liability policy, and Workers' Compensation in accordance with Massachusetts General Laws. Payment terms are set at thirty days following the receipt of a satisfactory invoice.
Town Administration

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 541330
New
SLED
Fruitland Sewer Extension Preliminary Engineering Report
Solicitation # 2027-RFP-033
Wicomico County is soliciting proposals under solicitation 2027-RFP-033 for professional engineering services to develop a Preliminary Engineering Report (PER) for the Fruitland Sewer Extension Project. The primary objective is to evaluate alternatives for providing public sewer service to seven specific focus areas around Fruitland, prioritizing locations prone to septic system failure. The project assumes connection to the City of Fruitland municipal sewer system and treatment at the City of Fruitland WWTP. While the scope excludes analysis of the treatment plant's capacity, the selected vendor must identify necessary upgrades for existing downstream pumping stations and sanitary sewers. The PER must comply with USDA RUS Bulletin 1780-2 and build upon the Wicomico County Water and Sewer Master Plan from September 2021. The contract will be awarded based on best value for money, with evaluation heavily weighted toward demonstrated experience, technical expertise, and project approach (35%), as well as the capacity to deliver products timely (15%). Required deliverables include a life cycle present worth cost analysis of feasible options, detailed cost estimates, and conceptual schematics. The successful vendor must provide a lump sum fee proposal and execute an Agreement for Engineering Services using EJCDC documents per RUS Bulletin 1780-26. Key administrative requirements include providing a Maryland Certificate of Status, submitting insurance certificates within ten days of award, and executing the contract within fourteen days of receipt. Proposals are due by December 2, 2026, at 2:30 pm via the electronic procurement portal.
Public Works

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Power Delivery General Engineering Services
Solicitation # 2026-RFP-0300
The City of Pasadena Water and Power Department is soliciting proposals under solicitation 2026-RFP-0300 to establish a pool of qualified professional engineering firms for Power Delivery General Engineering Services. The objective is to secure supplemental support across six primary scope of work groups: substation design, SCADA/automation and communications, system planning, civil/structural engineering, EV infrastructure, and renewable energy and energy storage. Selected consultants will be assigned work via individual task orders on either a lump-sum or time-and-materials basis. The initial contract term is five years, with three optional one-year extensions available upon approval. Proposals must be submitted electronically through the City's eProcurement Portal, with a technical proposal and a separate price proposal. Evaluation is based on a weighted scoring system focusing on qualifications (35%), work experience (35%), and cost. To be eligible, firms must demonstrate at least five years of relevant experience and five completed projects within the last five years for each proposed scope group. Additionally, professional services must be performed by engineers registered in the State of California. The City offers a 5% preference for local Pasadena businesses and certified small or micro-businesses. Compliance requirements are extensive, including adherence to NERC, WECC, CAISO, and SCE standards, as well as California Labor Code prevailing wage laws and ADA accessibility guidelines. Required documentation includes a Unique Entity Identifier from SAM.gov, a Declaration of Non-Collusion, and various certifications regarding equal opportunity and conflict of interest. Invoicing is managed through the City's Vendor Invoice Portal, with payments processed via Accounts Payable.
Water & Power Department, Power Delivery

POSTED

about 13 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The City of Manhattan Beach has issued a solicitation (RFP No. E1302-25S) seeking professional engineering services to conduct a hydrology and capacity study of the American Martyrs Stormwater Sump located at 721 15th Street, adjacent to the American Martyrs School. The sump, designed according to a 1999 hydrology report, has periodically overflowed during heavy storm events, causing flooding issues on school grounds. Given changes in rainfall patterns, environmental conditions, and agency requirements, the City requires an updated hydrologic analysis to reassess the sump's capacity, infiltration rates, and to propose viable drainage improvements along with maintenance protocols and associated costs to mitigate flooding risks and ensure compliance with regulatory standards. The project scope involves assessing the current system's performance, generating a comprehensive report with drainage recommendations, conceptual designs, probable cost estimates, and an implementation schedule, with potential for subsequent design services. Proposals must be submitted electronically by December 18, 2025, via the City’s OpenGov procurement portal. The evaluation criteria heavily emphasize the qualifications and experience of proposed key personnel and sub-consultants, project management methodology, understanding of the scope, and local conditions, using a best-value trade-off approach rather than simply low price. The contract includes rigorous compliance provisions covering prevailing wage laws under California Labor Code applicable to public works, insurance requirements, record retention and audit rights, and termination clauses allowing City-initiated cancellation with short notice. The agreement is set to begin around March 2026 with anticipated completion by July 2026, with options for extension of up to two additional one-year terms. Key contractual elements also include strict proposal format and submittal instructions, certifications against collusion, and insurance acknowledgments, as well as a no-modification clause to the City’s standard professional services agreement. Deliverables are to be provided in searchable PDF format, and all work must meet applicable regulatory codes including those from the Los Angeles County Department of Public Works and California Coastal Commission. The contract intends to deliver a technically robust, regulatory-compliant, and cost-effective solution to the stormwater management challenges faced at the American Martyrs site.

General Info

The City of Manhattan Beach ("City") invites sealed proposals on the project described herein to be submitted via OpenGov. Proposals will be received until Proposal Submission Time on Proposal Submission Date . Bid Valid: 120 Days Anticipated Start: March 2026 Anticipated Completion: July 2026 or sooner Anticipated Schedule: ACTION DATE NON-mandatory Pre-Proposal Meeting 12/8/2025 at 10:00 AM Last Day to Submit Questions 12/10/2025 at 10:00 AM Proposal Submission Deadline (OpenGov ONLY) 12/18/2025 at 10:00 AM Staff Review of Proposals 12/18/2025 through 12/31/2025 Interview(s) with Top Ranked Consultant(s) and City Negotiations – ( If Needed ) TBD City Council Award February 2026 Contract Execution February 2026 Notice To Proceed March 2026 Single Point of Contact for Questions All questions must be submitted through OpenGov on the website provided in Section 1, Instructions to Proposers. Proposers may not contact any other staff members with questions. OPTIONAL Pre-Proposal Meeting is scheduled for Monday, December 08, 2025, at 10:00 a.m. at the southwest corner of the American Martyrs School site located at 721 15 th Street, Manhattan Beach, CA 90266. See Appendix E for Location Map. Project Description The City seeks a Consultant to perform professional engineering services for the American Martyrs Stormwater Sump Hydrology and Capacity Study. The Consultant shall communicate their review and findings for the area as per their expertise, make minor and major recommendations for drainage improvements and long-term resiliency, create conceptual diagrams, as well as provide probable costs and schedule. The final deliverable will be an assessment report outlining the recommendations for any deficiencies unfit per the latest standards, codes, and requirements of all applicable agencies. The selected Consultant may be utilized for design development following the completion of the report if the City elects to proceed with a recommendation; however, this will depend on performance and additional contract approval, and is not guaranteed.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeManhattan Beach, CA, 90266, USA
Organization / AgencyCalifornia → Public Works
Office AddressManhattan Beach, CA, 90266, USA
Contacts
Dru LeonardPurchasing Analyst

Full Description

Show more
Project Area The project's address is 721 15 th Street, Manhattan Beach, CA. Refer to Appendix E for Location Map. The American Martyr's Sump is located directly adjacent to American Martyrs School and is situated in a localized low point, where stormwater runoff from the adjacent developed areas is transferred to the sump. Project Background On occasion during periods of heavy stormwater runoff, American Martyr's Sump capacity has overflowed and encroached into the adjacent school play and building areas. In 1999, a hydrology report (Appendix F) was created which calculated peak flow, volume of runoff for three storm periods (including Los Angeles County Department of Public Works criteria), and presented four possible solutions for remediation. The hydrologic method was able to identify the 50-year, 4-day storm as the leading design plan for recommendations lowering the risk of flood damage. The study analyzed infiltration rates and options for gravity systems, a pump station, and discharge directly to the ocean via a new underground storm drain system. The California Coastal Commission, Los Angeles County Department of Public Works, and California Regional Water Quality Control Board all expressed concern for protection of marine life, health, water quality, stormwater treatment, necessary clearances, and permits if water would not be retained. For these reasons, and the fact that the existing sump was determined to percolate with reasonable efficiency at the time, it was recommended to City Council that no further action be taken regarding the American Martyrs stormwater sump. Stormwater has flooded adjacent areas again, indicating that the sump's capacity and/or infiltration rates may no longer be sufficient. With changes that occur due to the environment, rainfall, agency requirements, and overall hydrology over the years, an update to the 1999 hydrology report is necessary to verify the required sump capacity and to propose drainage options and maintenance protocol along with their associated costs.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT
Solicitation # IFB No. PW-0332
The HSIP Cycle 11 and 12 Unsignalized Crossing Improvement Project, managed by the City of Santa Cruz Public Works Department, involves comprehensive roadway and pedestrian safety enhancements across five specific locations. The scope of work includes the installation of concrete curbs, gutters, curb ramps, roadway signs, pedestrian activated beacons, and thermoplastic striping and pavement markings. Work must be performed in accordance with the 2025 State of California Department of Transportation Standard Specifications, City Standard Specifications, and ADA standards. The project is divided into Cycle 11, covering Laurel Street at Blackburn Street, Broadway at Pennsylvania Avenue, and Seabright Avenue at Logan Street, and Cycle 12, covering High Street at Cardiff Place and Soquel Avenue at Poplar Avenue. This solicitation is an Invitation for Bids with a response deadline of November 5, 2026. The contract will be awarded to the lowest responsible and licensed bidder based on the City's estimated quantities of work. The successful contractor must complete the project within 50 working days and provide Faithful Performance and Labor and Material bonds each equal to 100 percent of the contract price within 10 calendar days of the award. Key administrative requirements include compliance with Department of Industrial Relations prevailing wage laws, the submission of a DIR Compliance Affidavit, and adherence to the City of Santa Cruz Quality Assurance Program. Payment terms include a 10 percent retention on the estimated value of work performed and a 20 percent retention on unused materials delivered.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS