Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on July 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Professional Mechanical Engineering of Energy, HVAC and Control Systems - Continuing Contract

Closed
RFP-09710State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County for the demolition and waste removal of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and side wall walkways. Additionally, the contractor is responsible for removing above-grade utilities, capping or abandoning underground utilities, and clearing dumped materials and interior fencing at the neighboring Emory Grove Village parcel. The selected firm will be tasked with procuring all necessary Montgomery County demolition and raze permits, managing the removal of hazardous materials such as asbestos, and stabilizing the property according to the approved Sediment Control Plan. The contract features an initial performance period of four months from the Notice to Proceed. Proposals are due by October 30, 2026, via the OpenGov Procurement Portal and are evaluated based on schedule (20%), price (15%), and MFD participation. Key compliance requirements include adherence to Davis-Bacon and Maryland Prevailing Wage Laws, mandatory background screenings for all personnel, and participation in the HOC Works Program. Awardees must provide 100% payment and performance bonds, proof of insurance, and execute HUD certifications regarding debarment and suspension. HOC will retain 5% of payments until final acceptance, with liquidated damages of up to 1,000 dollars per day for incomplete work.
Real Estate

POSTED

about 5 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Central Florida Tourism Oversight District is seeking qualified professional engineering firms to provide comprehensive consulting services for its utility systems, including chilled water, hot water, and natural gas. The scope encompasses evaluation, assessment, design, and construction administration for these systems, with tasks such as master planning, preliminary engineering, detailed design, and construction oversight. The services also include developing plans and specifications using advanced CAD and BIM tools, equipment replacement and upgrade designs, hydraulic and thermal stress analyses, and specialized assessments like HDD, J&B, HVAC, cathodic protection, and hot tap/line stop procedures. Additionally, the contract covers electrical demolition and construction, control system upgrades, and facility engineering design, ensuring compliance and operational efficiency. The utilities involved in this contract include various types of chillers, cooling towers, boilers, distribution pumps, and natural gas stations, with capacities specified for each. The contract value ranges from $500,000 to $2,000,000, and the project aims to enhance the infrastructure's reliability and efficiency. Interested firms are invited to submit their Letters of Interest by August 1, 2024, with the primary contact being Devin Ager. This opportunity is part of a continuing contract under NAICS code 238910, focusing on energy, HVAC, and control systems engineering services within Florida.

General Info

Documents

1

C006609 Professional Mechanical Engineering of Energy, HVAC and Control Systems LOI

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCentral Florida Tourism Oversight District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Link to Solicitation Here; https://vendors.planetbids.com/portal/62171/bo/bo-detail/119792 The Central Florida Tourism Oversight District (“District”, “Owner” and “CFTOD”) requires the services of professional engineering firm(s) to provide consulting services for each of the following production and distribution utility systems owned and operated by CFTOD: chilled water (CHW), hot water (HW), and natural gas (NG).This Letters of Interest Package is being issued to pre-qualify firms to provide engineering services for the evaluation and assessment, design and construction administration services for each of the CFTOD utilities.• A summary of tasks related to the assessment, planning and design includes, but are not limited to; o Capital improvement and utility master planning. o Preliminary engineering assessments and conceptual design.o Design service including the development of plans, specifications, control sequence of operation and integration, details, etc.o Drawing production in the latest versions of AutoCAD, REVIT and Civil 3D. o Direct replacement and/or upgrade of equipment design and plan development. o Construction administration services; compliance review, inspection and commissioning.o Cost estimating services which includes, but not limited to, conceptual and detailed estimating, life cycle cost analysis, constructability analysis, etc.o Value-Engineering alternatives analysis. o Hydraulic simulations in the latest version of AFT Fathom (incompressible fluids) and AFT Arrow (compressible fluids). o Thermal stress analysis of complex piping systems using industry accepted simulation tools.o Horizontal direction drill (HDD) and Jack & Bore (J&B) analysis and design using industry accepted simulation tools.o Heating, Ventilation and Air Conditioning (HVAC) analysis and design using Carrier’s Hourly Analysis Program (HAP).o Cathodic protection analysis and design using both sacrificial anode and impressed current methods.o Hot tap/line stop analysis and design using industry accepted means and methodso Facility engineering design including physical design (civil and structural).o Electrical demolition and construction related to the removal of existing mechanical equipment and auxiliaries and installation of new or replacement mechanical equipment and auxiliaries/supplemental systems, conduits and controls. Auxiliaries include but are not limited to variable frequency drives, reduced voltage soft starters, full voltage not reversing starters with thermal or protective relay tripping, supervision and alarming.o Industrial electrical equipment is defined as rated 480V or 4160V typically and control system, motor control centers, switchboards and panelboards rated 480V and below.o Electrical demolition and construction of control and automation equipment and programmable controllers related to the removal of existing control system equipment and auxiliaries and installation of new or replacement control equipment and auxiliaries/supplemental systems, conduits and controls. Auxiliaries include but are not limited to variable frequency drives, reduced voltage soft starters, full voltage not reversing starters with thermal or protective relay tripping, supervision and alarming.• A summary of production utility systems includes, but are not limited to: o Chillers: Water-cooled (500 – 2,000 tons) Air-cooled (500 – 2,000 tons) Centrifugal (constant speed) Centrifugal (variable speed) Centrifugal (magnetic bearing)o Cooling towers: Crossflow (5,000 – 15,000 gpm) Counterflow (5,000 – 15,000 gpm)o Boilers (hot water): Non-condensing (500 - 800 HP) Condensing (50 – 150 HP)o Distribution Pumps: Constant speed (5 – 500 hp) Variable speed (5 – 500 hp)o Natural gas meter/regulator stations

More opportunities from Central Florida Tourism Oversight District

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS