Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Progressive Design Build (PDB) - Cyber Maintenance Hangar Modernization

Active
W912QR-PDB-MANSFIELD-OHFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers Louisville District is conducting market research via a Request for Information for the Cyber Maintenance Hangar Modernization project in Mansfield, Ohio. The project involves the construction of ICD-705 compliant high-security spaces, such as Special Access Program spaces and Secure Compartmentalized Information Facilities, either as an endo-skeleton structure or a prefabricated panelized facility within an existing hangar. The scope includes installing communications rooms, emergency power systems, and all necessary electrical, mechanical, and life safety infrastructure. The estimated acquisition magnitude for the construction phase is 50 million dollars. The government is considering an Other Transaction Agreement to implement either a Progressive Design-Build or Construction Manager at Risk delivery method. This approach would be split into two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested firms must provide detailed information regarding their experience with ICD-705 standards, OTA frameworks, and innovative construction technologies. Responses are due by September 11, 2026.

General Info

USACE seeks RFI for $50M high-security hangar modernization in Mansfield, Ohio.

Agency

Department Of Defense → W072 Endist LouisvilleView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Mansfield, OH, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts2 people available
OfficeLOUISVILLE, KY, 40202-2230, USA
Organization / Agency
Department Of Defense → W072 Endist Louisville
View Agency Profile
Office AddressLOUISVILLE, KY, 40202-2230, USA
Contacts
Patrick J. Duggins

Full Description

Show more

REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE


Cyber Maintenance Hangar Modernization – Mansfield, OH


Notice: This is a Request for Information (RFI) for market research and informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future.


NAICS Code: 236220 – Commercial and Institutional Building Construction
(Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.)


Small Business Size Standard: $45 Million


1. PROJECT OVERVIEW


The U.S. Army Corps of Engineers (USACE) Louisville District plans to issue a solicitation for either the new construction of an ICD-705 compliant endo-skeleton structure within an existing hangar OR new ICD-705 compliant prefabricated panelized facility to house Cyber Warfare Operations within an existing hangar. The project will provide cyber operations space within the existing bay. The awardee will construct all spaces to the appropriate security levels, install communications room to accommodate servers and equipment, provide all supporting electrical, mechanical, security, life safety, fire alarm and sprinkler systems, and communications supporting infrastructure, and provide emergency power systems and standby generator connection.


  • High-Security Spaces (ICD 705): Renovation and construction of Special Access Program (SAP) spaces and Secure Compartmentalized Information Facilities (SCIFs) built to stringent ICD 705 standards along with potential deconstruction of existing Hangar Door to achieve and maintain ICD-705 compliant perimeter.
  • Estimated Acquisition Magnitude: $50,000,000 (Phase 2)
  • Funding Source: Operations & Maintenance (O&M)

2. PLANNED ACQUISITION STRATEGY


The Government is considering utilizing an Other Transaction (OT) Agreement for a prototype project under the authority of 10 U.S.C. § 2808a. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies or delivery methodologies to achieve benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction.


The baseline delivery method under consideration is Progressive Design-Build (PDB).


  • Phase 1 (Design & Pre-Construction): The Government and the OT Awardee will work collaboratively to advance the design, perform constructability reviews, conduct open-book cost estimating, and mitigate project risks.
  • Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods.

Alternative Under Consideration: The Government is also evaluating a Construction Manager at Risk (CMAR) delivery method under the OTA framework, particularly in scenarios where the Government-appointed Architect-Engineer (A-E) / Designer of Record (DOR) is pre-selected and dictated to the constructor.


3. INFORMATION REQUESTED


Section 1: Company Profile


  • Firm Name, Address, and Point of Contact (Name, Title, Phone, Email).
  • Unique Entity ID (UEI).
  • Socioeconomic Status (Other than Small, Small, 8(a), SDVOSB, WOSB, HUBZone, etc.).

Section 2: Other Transaction Authority (OTA) & Statutory Compliance


  1. Innovative Technologies & Practices: 10 U.S.C. § 2808a focuses on prototyping with emergent construction technologies or innovative processes. Describe any innovative materials, sustainable building technologies, or modern construction processes (e.g., prefabrication, modular MEP systems, etc.) your firm could utilize to accelerate the schedule, reduce costs, and increase the building's life expectancy. Please provide a brief (no more than 1 page) description of your general approach to and the cost/pricing implications of the following: 1) new construction of an endo skeleton structure within an existing hangar to house Cyber Warfare Operations; and 2) providing new ICD-705 compliant “prefabricated trailers” to house Cyber Warfare Operations within an existing hangar. The information you provide regarding these various approaches will help the Government determine an appropriate path forward to successful execution of the project within funding limitations.  
  2. OTA Experience: Describe your firm’s experience (if any) executing projects under an Other Transaction Agreement (OTA).
  3. Overcoming Traditional Barriers: What commercial or Government-imposed barriers (e.g., traditional FAR-based procurement limitations) make it difficult to implement innovative methods on complex military renovations? How can the flexibility of an OTA help overcome these barriers?

Section 3: Progressive Design-Build (PDB) / Early Contractor Involvement


  1. Information Baseline: What minimum level of detail (e.g., DD Form 1391, conceptual design, spatial programming documents) does your firm require prior to entering Phase 1 (Design & Pre-construction) to feel confident in the project's baseline viability and target budget?
  2. Collaborative Framework: What collaborative mechanisms (such as joint design charrettes, target-value design workshops, or phased scoping approvals) do you recommend the Government implement in the first 30-90 days of Phase 1 to rapidly transition from a planning document to an agreed-upon technical baseline?
  3. Open-Book Pricing: Describe your experience with and internal processes involved in "open-book" pricing and transparency during pre-construction. How will you assure the Government that subcontractor and material pricing represent fair market value?

Section 4: DESIGN PARTNER (A-E/DOR) TEAMING & DELIVERY METHOD ALTERNATIVES


The Government is seeking targeted feedback on the structuring of design teams and alternative delivery methods (PDB vs. CMAR) for this complex headquarters renovation.


  1. Dictated A-E / Designer of Record (DOR):
    • If the Government dictates the A-E firm / DOR for this project (e.g., a pre-selected firm already familiar with the facility's design/planning documents), rather than allowing your firm to team with an A-E of your own choosing, would your firm still be interested in bidding as the Prime Contractor? Please explain your reasoning.
    • What major risks, operational friction, or coordination challenges do you foresee with a government-dictated A-E model? How would your firm mitigate those risks?
  2. PDB vs. CMAR Strategy:
    • If the A-E/DOR is dictated by the Government, does this change your perspective on the viability of the Progressive Design-Build (PDB) w/ OTA strategy?
    • Would a Construction Manager at Risk (CMAR) w/ OTA strategy be a better, more appropriate fit for this project if the designer is pre-selected? Please contrast the advantages and disadvantages of PDB vs. CMAR under a government-dictated design team structure.

Section 5: Guaranteed Maximum Price (GMP), Risk Allocation & Compensation


  1. Off-Ramp Risk & Design Rights: If the Government and the contractor cannot reach an agreement on the Guaranteed Maximum Price (GMP), and the decision is made to “off ramp”, what specific compensation structures (e.g., design fees, stipends, time-and-materials) would adequately compensate your firm for Phase 1 efforts? Who should retain ownership of the design deliverables in this scenario?
  2. GMP Lock-In Milestone: In your experience with highly complex, secure administrative facilities such as this, at what design milestone (e.g., 35%, 65%, 95%) is it most advantageous to lock in the GMP, and why?
  3. Long-Lead Procurement: How do you handle the procurement of critical, long-lead items (e.g. uninterrupted power supply (UPS), backup generators, customized HVAC chiller components, and high-security electrical switchgear) prior to establishing the final construction GMP?

Section 6: Renovation, Secure Spaces (ICD 705), and MEP/Communication Expertise


  1. Secure Spaces (ICD 705): Describe your firm's specific experience in constructing and accrediting Special Access Program (SAP) spaces and SCIFs complying with ICD 705 / RF Shielding standards. What are the primary risk factors in delivering these facilities on time?
  2. Complex MEP & Communications Infrastructure: Detail your experience in high-voltage electrical distribution, backup power generator facilities, and active telecommunications exchanges/switching facilities within an existing hangar.

Section 7: Subcontractor Integration and Site Access


  1. Subcontractor Onboarding: Under a collaborative (PDB or CMAR) model, how and when do you plan to onboard critical specialty subcontractors (e.g., ICD 705 security, MEP, fire protection, foundations, RF shielding testing, commissioning, etc.)?
  2. Competition: Will you compete these subcontracts openly during Phase 1 pre-construction, or do you prefer bringing in established, pre-selected trade partners from day one?
  3. Site Access: Government escorts will be provided and are required during contract execution. It is anticipated that this will adversely affect production. Please acknowledge and provide detail of potential mitigation strategies to avoid schedule impacts.

Section 8: Bonding & Financial Capability


  1. Phased Bonding Approach: Construction performance & payment bonds are anticipated to be deferred until the execution of Phase 2. As such, would this effectively mitigate bonding capacity risks for a project of this magnitude (~$50,000,000)?
  2. Surety Timelines: If construction bonds are deferred until Phase 2, what is the maximum duration your surety would hold a commitment open between the finalization of the GMP and the Notice to Proceed for construction?
  3. Funding Gap Mitigations: If funding or execution authority for Phase 2 construction is delayed (e.g., 90–180 days post-design completion due to O&M/fiscal year cycles), what contractual mechanisms (e.g., escalation clauses, right to off-ramp) would your firm require to maintain the agreement?
  4. Bonding Limits: Specify your maximum bonding limits (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture.

4. SUBMISSION INSTRUCTIONS


Interested firms are invited to submit their responses to this RFI no later than 11 September 2026 at 1600 ET.


Submissions should be sent via email to megan.r.murphy@usace.army.mil in PDF format, not exceeding 6 pages (excluding company brochures or standard profiles).


Please direct all questions regarding this market research notice to megan.r.murphy@usace.army.mil.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This solicitation by J&J Contractors, Inc. seeks pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves a multi-story steel frame laboratory and office facility totaling 12,920 square feet, featuring shallow foundations, a metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including underground stormwater retention, utilities, telecommunications, landscaping, and parking. An additional option for the P1016 facility includes a 17,978 square foot laboratory and the demolition of Building 1272T. The scope of work covers a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact the primary point of contact to receive the bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in 3 months
View Details
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
The Northlands Job Corps Center, operated by Education and Training Resources (ETR), is soliciting bids for a firm fixed price subcontract to perform comprehensive bathroom renovations in two dormitory buildings located in Vergennes, Vermont. The project involves the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade shower pans, vitreous China toilets, high-pressure plastic laminate countertops, porcelain flooring, and LED lighting. All work must comply with ADA, OSHA, and applicable building, plumbing, and electrical codes, including the National Electrical Code and NFPA 101 Life Safety Code. To maintain center operations, contractors must renovate the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. To be considered, responses must include a completed bid sheet, a detailed cost breakdown separating materials and labor, a proposed project schedule, and proof of current Vermont state professional licensing. The winning bidder must maintain an active registration in SAM.gov with a Unique Entity ID. Depending on the contract value, payment and performance bonds may be required for projects exceeding 35,000 dollars. Additionally, contractors must provide certificates of insurance for Builders Risk, Automobile, Liability, and Workers Compensation, and certify compliance with the Davis Bacon Act and prevailing wage laws. Payment terms are net 30 days upon satisfactory receipt of services and a proper invoice. ETR serves as the sole judge for award selection, and the lowest bid does not guarantee a contract award.
Northlands Job Corps Center /ETR

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional construction includes a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass specialized foundations using rigid inclusions and load transfer mats, the installation of intrusion detection and lightning protection systems, and extensive site work involving rock excavation, grading, and wetland mitigation. The contract requires a wide array of trades, including demolition, abatement, structural steel, electrical utilities, plumbing, and mechanical systems. Site improvements will feature new access roads, paved loading areas, and comprehensive telecommunications infrastructure. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and access to the full project documentation.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 236220
New
Federal
Repair AMSA/ECS- Arden Hills Army Reserve Center, Minnesota
Solicitation # W912QR26RA035
The U.S. Army Corps of Engineers, Louisville District, is soliciting proposals under Solicitation No. W912QR26RA035 for the Design-Build of a complete renovation and expansion of a 31,658 square foot Maintenance Support Activity and Equipment Concentration Site in Arden Hills, Minnesota, to support Army Reserve operations. The project involves comprehensive repairs and upgrades to all major building systems including HVAC, electrical distribution, fire alarm and suppression, roofing, exterior facade, windows, doors, ceilings, flooring, and interior reconfiguration, along with the retrofit installation of a new 10-ton crane requiring a raised roof structure. All hazardous materials encountered during demolition must be removed and disposed of in full compliance with state and federal regulations. The contract is a Firm-Fixed-Price type under NAICS code 236220, with an estimated value between $25 million and $100 million, and a period of performance of 987 calendar days, though no funds are currently available and award is contingent upon future appropriations. Proposals must be submitted through a two-phase Best-Value Tradeoff process. Phase I evaluates past performance of the prime contractor and architect/engineer of record, technical approach for design-build execution, and financial capability with bonding and pro forma information. Up to five offerors will be selected to proceed to Phase II, where they must submit detailed design narratives, management plans, schedule narratives, small business participation plans, and comprehensive pricing. All non-price evaluation factors—design narrative, management plan, schedule narrative, and small business participation—are considered approximately equal in importance to price, and the Government intends to award without discussions, though it reserves the right to conduct them. Offerors must be registered in SAM.gov and possess a valid UEI and CAGE code; proposals must be electronically submitted via the PIEE Solicitation Module in two volumes with strict formatting, page limits, and file requirements. Key special requirements include compliance with EM 385-1-1 safety standards, AT Level 1 training for personnel, English-speaking on-site representatives, inclusion of Minnesota sales tax in pricing, and submission of subcontracting plans by large businesses. Final acceptance occurs on-site in Arden Hills, and the contract includes several optional scopes for future expansion, though their exercise is at the Government’s discretion.
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Federal
IDIQ DESIGN/BUILD, DESIGN BID/BUILD MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) TO PROVIDE CONSTRUCTION SERVICES FOR OPERATIONS AND MAINTENANCE (OPERATIONS AND MAINTENANCE) FOR CIVIL AND MILITARY PROJECTS WITHIN THE GREAT LAKES AND OHIO RIVER DIVISION MISS
Solicitation # W912QR26RA008
The U.S. Army Corps of Engineers, Louisville District, has issued a two-phase Multiple Award Task Order Contract (MATOC) under solicitation W912QR26RA008 to provide construction services for operations and maintenance of civil and military projects within the Great Lakes and Ohio River Division mission boundaries. This contract is a HUBZone set-aside exclusively open to small businesses certified in the SBA HUBZone program, with a total combined not-to-exceed value of $95 million and a small business size threshold of $45 million based on NAICS code 236220. The procurement follows a best value trade-off approach and encompasses both Design/Bid/Build and Design/Build methodologies, with Phase I focused on vendor selection and Phase II, opened via Amendment 0005 on July 9, 2026, limited to firms previously selected to participate. The solicitation response deadline for Phase II is August 10, 2026, and offers must be submitted through the SAM.gov portal. All participants must be registered in the SBA HUBZone program, and business size determinations must align with the NAICS code in SAM; mismatches will disqualify firms as small businesses. Amendments issued prior to Phase II modified submission requirements, including the removal of key subcontractor documentation under Section 7.4.1, and all instructions must be adhered to in full compliance with the updated solicitation. Performance is expected throughout the Louisville AOR, and while no specific delivery schedules, inspection criteria, or payment details are outlined in the available materials, proposers are directed to reference USACE procedures for equitable adjustments and definitization of change orders. Point of contact for inquiries is Joel Huberman, with email and phone details provided in the solicitation metadata.
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
Federal
Renovation/Repair of Bldg 27 at DSCC, OH
Solicitation # W912QR26BA021
The U.S. Army Corps of Engineers Louisville District is soliciting bids under solicitation W912QR26BA021 for the repair and renovation of Building 27 at the Defense Supply Center Columbus (DSCC) at Wright-Patterson Air Force Base, Ohio. This total small business set-aside project is estimated between 5 million and 10 million dollars and will be awarded as a firm fixed-price contract based on a trade-off process evaluating the lowest cost to the government. The scope of work includes general construction repairs to Building 27 and the replacement of two existing transformers and associated infrastructure. Additionally, the contract includes two options: the removal of conduit and conductors and the abatement of flooring containing ACMAS, both of which may be exercised up to twenty times within 14 months of the notice to proceed. The mandatory performance period requires the contractor to begin work within 10 calendar days and complete all tasks within 480 calendar days after receiving the notice to proceed. Bidders must submit proposals electronically via the PIEE Solicitation Module by September 8, 2026, and a site visit is scheduled for August 27, 2026. To access restricted solicitation documents containing Controlled Unclassified Information, firms must have an active SAM registration and a BASIC confidence level in the Supplier Performance Risk System. Key requirements include a bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, and compliance with construction wage rate requirements and Buy American standards. Liquidated damages for delays are set at 1,660 dollars per calendar day.
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Federal
Project Labor Agreement (PLA) Survey for the Construction of an Area Maintenance Support Activity (AMSA) and Vehicle Maintenance Shop (VMS) on Joint Base Elmendorf-Richardson, Alaska
Solicitation # W912QR26R1CGS
The Corps of Engineers Louisville District has issued a special notice to solicit comments from the construction community regarding the potential use of a Project Labor Agreement for a large-scale Design-Bid-Build project at Joint Base Elmendorf-Richardson, Alaska. The project involves the construction of a collocated Area Maintenance Support Activity and Vehicle Maintenance Shop, including land clearing, paving, utility connections, and security measures compliant with Unified Facilities Criteria. The estimated cost of the project ranges from 25 million to 100 million dollars, with an estimated duration of 1,095 calendar days and a NAICS code of 236220. This notice is for a survey only, and no proposals are being requested or accepted at this time. The government is seeking industry feedback on local skilled labor shortages, the history of PLA use in the area, and whether a PLA would improve procurement efficiency. Interested parties are asked to provide detailed information on similar projects completed in the last two to five years and indicate their likelihood of bidding based on PLA requirements. Comments must be submitted via email to the primary point of contact by 4:00 PM Eastern Time on September 11, 2026.
Commercial and Institutional Building Construction

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details
NAICS: 332312
New
Federal
Cannelton Lock and Dam - culvert valve assemblies
Solicitation # W912QR-61396929
Contractors holding MATOC Pool contracts W911WN23D0001 through W911WN23D0007 are invited to submit a price proposal for the removal, fabrication, and installation of two culvert valve assemblies at Cannelton Lock and Dam in Indiana. Each assembly includes a strut arm, bell crank, culvert valve, pins, valve bearing blocks, and ancillary components as detailed in the plans. Work scope encompasses unwatering and maintaining a dry environment within the culvert valve chamber during installation, followed by rewatering, and may include disposal of removed components in accordance with demolition and deconstruction specifications. The estimated project value falls between five and ten million dollars. Award will be made based on the lowest evaluated price, and proposals must remain open for acceptance for a minimum of 60 calendar days from the due date. All submissions must be made electronically via the Procurement Integrated Enterprise Environment Solicitation Module, and must be received by 11:00 AM EDT on Monday, September 7, 2026. Proposals not submitted through PIEE or received after the deadline will be rejected. Inquiries must be submitted exclusively through the ProjNet system using the provided bidder key, and no questions will be addressed during the mandatory site visit. All vendors must be registered in SAM.gov to access the solicitation documents, which are available only through that portal using solicitation number W912QR-61396929. This is a Small Business Set Aside, with the North American Industry Classification System code 332312, and the contracting office is located in Louisville, Kentucky.
Fabricated Structural Metal Manufacturing

POSTED

2 days ago

DEADLINE

in 16 days
View Details
NAICS: 238160
New
Federal
Design and Construction Services for the FY26 National Roofing Program (NRP) Project #12 – AL018 Fort Rucker, AL and MS800 Camp Shelby, MS
Solicitation # W912QR261C5X
This solicitation is part of the NRP MATOC Pool, targeting design and construction services for roofing projects under the U.S. Army Reserves National Roofing Program, specifically for Fort Rucker, Alabama, and Camp Shelby, Mississippi. It builds upon existing IDIQ contracts numbered W912QR24D0054 through W912QR24D0063, which authorize multiple award task orders for building envelope, roof repair, and replacement work supporting the Army and Air Force Reserve sections. The solicitation, identified by number W912QR261C5X, invites qualified contractors to compete for task orders under this procurement cycle, with responses due by August 26, 2026, and the opportunity posted on July 27, 2026. The work is classified under NAICS code 238160 for roofing contractors and falls under the purview of the Department of Defense, managed by the Office of Endist Louisville in Kentucky. All performance activities are centered at two specific locations: Fort Rucker in Alabama and Camp Shelby in Mississippi, with the primary point of contact being Ethan Phillips of the U.S. Army Corps of Engineers, reachable via phone and email. The contract structure allows for flexible task order execution under an indefinite delivery, indefinite quantity framework, enabling the government to issue multiple work orders as needed across the contract period. There is no specific set-aside designation indicated, meaning the opportunity is open to all eligible contractors without reservation for small businesses, veteran-owned firms, or other categories. Interested parties must respond through the SAM.gov portal using the provided link and adhere strictly to the submission deadline to be considered for award.
Roofing Contractors

POSTED

2 days ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
Federal
Control Tower Bridge Spalling Repair and Sealing
Solicitation # W912QR26QA086
Solicitation W912QR26QA086 is a firm fixed price construction project for the spalling repair and sealing of the Control Tower Bridge at Green River Lake in Campbellsville, Kentucky. Issued by the Department of Defense through the W072 Endist Louisville office, this project is a total small business set-aside under NAICS code 237310 with an estimated construction magnitude between 10,000 and 50,000 dollars. The scope of work requires the contractor to provide all labor, materials, and supervision to remove deteriorated concrete, apply repair materials meeting or exceeding Dayton Superior HD50 specifications, perform high-pressure washing at a minimum of 3,000 PSI, and apply a concrete preparation product meeting or exceeding Smith's Green Clean Pro specifications. A critical requirement of the project is maintaining continuous operational access to the Control Tower to ensure uninterrupted dam operations. The procurement process includes a scheduled site visit on August 31 at 10:00 AM, with a final response deadline extended to September 4, 2026, at 11:00 AM EST. Award will be made to the lowest price offeror. Bidders must be registered in the System for Award Management and submit a completed Standard Form 1442. While performance bonds are not required, bid bonds and payment bonds or irrevocable letters of credit are mandatory. Contractors must comply with the Davis-Bacon Act wage determinations for Kentucky and adhere to safety standards outlined in the Occupational Safety and Health Act and Corps of Engineers Manual EM385-1-1. Payment will be processed electronically via the Wide Area WorkFlow system.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 6 days
View Details