Provo City - Provo River Trail -Central Improvements and Sewer and Water Main
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Provo City is soliciting bids for significant improvements to the Provo River Trail, including the demolition of the existing asphalt trail and the installation of approximately 4,250 feet of new 14-foot-wide asphalt trail, along with two pedestrian concrete u-shaped undercrossings beneath Columbia and State Streets, multiple retaining walls on both sides of the trail, and a new pedestrian bridge. The work also encompasses the replacement of 615 linear feet of 24-inch sewer line and 300 linear feet of 16-inch water line that cross the Provo River via open cut excavation, a portion reserved exclusively for prequalified contractors as specified in the submission form, who may serve as either the general contractor or a subcontractor. Only responsive and qualified vendors are eligible for award, with selection based on the lowest cost as outlined in the Request for Bids document. A non-mandatory site visit is scheduled for August 11, 2026, at 9 a.m. at 702 W Columbia Ln, Provo, UT, to provide bidders with a visual understanding of the project area. The solicitation, identified as PROVO20250503, was posted on July 29, 2026, with responses due by August 24, 2026, at 8 p.m., and all inquiries should be directed to John Bunderson at jbunderson@provo.gov.
General Info
Agency
NAICS
Place of Performance
UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Schedules 1 to 3: Demolishing the existing asphalt trail and placing approximately 4250 feet of new 14 foot wide asphalt trail, construct 2 pedestrian concrete u-shaped undercrossing under Columbia and State Streets, several new retaining walls along both sides of the trail, and one new pedestrian bridge. Schedule 4: Replacing approximately 615 linear feet of 24-inch sewer line and 300 linear feet of 16-inch water line that both cross the Provo River using open cut excavation methods. (Only prequalified contractors are eligible to perform the Schedule 4 Work, either as the general contractor or as a subcontractor to the general contractor. Prequalified contractors to perform the Schedule 4 Work are listed in Section 00 43 36 Proposed Subcontractor Form, paragraph 2.1.A.)
Non-Mandatory Site Visit: August 11, 2026 at 9 am to 10:30 starting at 702 W Columbia Ln, Provo, UT 84604
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive qualified vendor.
The methodology or formula that will be used to determine the contract award is provided in the RFB document.
More opportunities from Utah
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS