This Solicitation opportunity from Cleveland Mayors Office of Capital Projects was posted on March 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for AR-2447 Public Auditorium Electrical Life Safety Improvements Phase 1: The City of Cleveland is seeking qualified Design-Build Team Partners to provide professional architecture, engineering, and construction services for electrical life safety improvements at the Public Auditorium. The project is a Progressive Design-Build effort focused on two primary areas: DC Rectifiers (Bid Package 1) and the 'Click Clack Room' (Bid Package 2). The solicitation was released on March 13, 2025, with a proposal submission deadline of April 11, 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Construction Waste Management and Disposal Specifications: This document provides detailed administrative and procedural requirements for managing nonhazardous demolition and construction waste, including salvaging, recycling, and disposal. It defines key terms such as construction waste, demolition waste, disposal, recycling, and salvage. The document sets performance requirements aiming for a 50% salvage/recycling rate by weight of total nonhazardous solid waste generated. It lists specific materials subject to waste management practices and mandates 100% salvage or recycling of uncontaminated packaging materials. The document outlines required submittals including a Waste Management Plan, progress reports, and records related to waste handling. It also specifies qualifications for waste management personnel and compliance with regulatory requirements. The document is intended to guide efficient waste management practices throughout the project to minimize landfill and incinerator use.
PDF
PDF, High priority: read this firstinstructions-for-certified-payroll-reports
HighAI Summary for Instructions for Preparing Certified Payroll Reports - Ohio Prevailing Wage Law: This document provides detailed instructions for contractors and subcontractors on preparing certified payroll reports in compliance with Ohio's Prevailing Wage Law as per Ohio Revised Code Chapter 4115. It outlines the required information for payroll headings, employee details, work classifications, hours worked, pay rates, fringe benefits, and total wages. The instructions clarify how to report straight time and overtime hours, base rates, gross wages, and fringe benefit payments. The document is issued by the Ohio Department of Commerce Division of Industrial Compliance and Labor Bureau of Wage & Hour Administration and includes contact information for further assistance.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Contractor Responsibilities Summary: This document from the Ohio Department of Commerce, Division of Industrial Compliance, summarizes prevailing wage contractors' responsibilities under Ohio Revised Code Chapter 4115. It outlines applicability thresholds for public improvements, penalties for violations including intentional violations, and detailed contractor responsibilities such as paying prevailing wages, maintaining payroll records, using apprentices within allowed ratios, posting wage schedules, and submitting certified payroll reports. The document emphasizes compliance requirements, reporting procedures, and the consequences of non-compliance, serving as a critical guide for contractors on public projects in Ohio.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Notice - Valerie Harvey: This document is a Prevailing Wage Notice from the Ohio Department of Commerce, Bureau of Wage & Hour Administration. It informs public authorities and contractors about the availability of wage rates and notifications of changes via the internet and email. The notice provides contact information for Ms. Valerie Harvey at the City of Cleveland Mayor's Office of Capital Projects for all prevailing wage information and inquiries. The document aims to facilitate efficient access to prevailing wage data for inclusion in bid specifications and project management.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Notification for City of Cleveland Contracts: This document is a Prevailing Wage Notification subject to Ohio Prevailing Wage Laws, Chapter 4115 of the Ohio Revised Code, applicable to contracts with the City of Cleveland. It outlines the contractor's obligations to pay laborers and mechanics at or above the prevailing wage rates as determined by the Ohio Department of Commerce, including overtime pay and fringe benefits. The notification details requirements for posting wage rates, providing wage notifications to employees, submitting certified payrolls and apprentice certifications, and filing a final wage affidavit upon contract completion. It emphasizes compliance enforcement, record availability for inspection, and potential penalties for non-compliance such as contract termination, suspension, or debarment. This notice is integral to contracts issued under the related Invitation to Bid.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Threshold Levels Notice 2024: This document provides the prevailing wage threshold levels for public construction projects in Ohio as of January 1, 2024. It specifies the monetary thresholds for new construction and reconstruction work in building construction and road/bridge-related construction. The thresholds are set at $250,000 and $75,000 for building construction, and $98,974 and $29,653 for road/bridge construction respectively. The document also explains that these thresholds are adjusted biennially by the Ohio Department of Commerce based on the Building Cost for Skilled Labor Index, with a maximum annual change of 3%. Contact information for the Bureau of Wage and Hour Administration is provided for inquiries.
PDF
PDF, High priority: read this firstgeneral-conditions
HighAI Summary for PART B - General Conditions for Invitation to Bid: This document, titled PART B - General Conditions, forms part of the contract documents for an Invitation to Bid issued by the City of Cleveland, Ohio. It defines key contract terms, outlines the components constituting the contract, and sets forth conditions such as time of commencement, completion, and liquidated damages for delay. The document emphasizes the importance of timely performance and details the roles and responsibilities of the contractor, subcontractors, and the Director. It also specifies legal and procedural requirements for contract execution and acceptance. This version is a standard general conditions section intended to govern the contractual relationship and work performance under the bid.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Prevailing Wage Notification to Employee: This document is a Prevailing Wage Notification to Employee related to a specific project. It includes fields for project name, job number, contractor, project location, and jobsite posting location. It identifies the Prevailing Wage Coordinator and the employee with their contact details. The document outlines the classifications of work the employee will perform and specifies the prevailing wage rate total package, deductions for fringe benefits, and the resulting hourly base rate. The purpose is to inform the employee of the wage rates applicable to their work on the project. The document is formatted as a notification form and includes a blank page intentionally left blank.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Professional Services Agreement - City of Cleveland and Consultant: This document is a Professional Services Agreement between the City of Cleveland and a Consultant firm, effective 2022. It outlines the engagement for professional architectural and engineering services for renovations of a project. The agreement incorporates the City's Request for Proposal (RFP) dated December 3, 2021, and the Consultant's Proposal from January and February 2022. Key sections include the scope of work, standards of work, assistance from the City, term of the agreement, and payment terms. The Consultant agrees to perform services under industry standards and Ohio licensing requirements, with oversight by the City's Director. The document also details responsibilities for surveys, soil investigations, and insurance coverage for project documents.
PDF
PDF, High priority: read this firstsupplemental-general-conditions
HighAI Summary for Supplemental General Conditions - Cleveland City Construction Contract: This document titled 'Supplemental General Conditions' serves to amplify or modify the General Conditions of a construction contract for the City of Cleveland. It provides supplementary definitions and clarifications for terms used in the contract such as Allowance, Alternate, Architect, Change Order, Contract Amount, Construction Duration, and others. The document outlines the roles and responsibilities of parties involved, including the City, Contractor, Architect, Engineer, and Director. It also defines key contract concepts like Final Acceptance, Substantial Completion, and Guarantee Period. The document is essential for understanding the contractual framework, financial provisions, and procedural requirements for the project execution and completion.
PDF
PDF, Low priorityaffidavit-of-compliance
LowAI Summary for Affidavit of Compliance - State of Ohio Prevailing Wages: This document is an Affidavit of Compliance certifying that the wages paid to employees on a specified project in Ohio comply with the prevailing wage requirements of Chapter 4115 of the Ohio Revised Code. It includes certification that no unauthorized deductions have been made from wages. The affidavit must be signed by an officer or agent responsible for supervising employee payments and notarized. It is required to be submitted to the public authority before surety release or final payment under the contract.
PDF
PDF, Low prioritypolicy-manual
LowAI Summary for City of Cleveland Asbestos Policy and Program Manual May 2017: This document is the City of Cleveland's City-Wide Asbestos Policy and Program Manual dated May 19, 2017. It provides comprehensive guidance for managing asbestos-containing materials (ACM) in city properties to ensure safety and regulatory compliance. The manual includes purpose, background, definitions, applicable regulations, and detailed procedures for managing asbestos, including roles and responsibilities, hazard communication, training, medical surveillance, and emergency response. Attachments provide additional resources such as contact lists and inspection reports. The policy aims to prevent asbestos fiber release during maintenance, renovation, or demolition activities in accordance with federal, state, and local regulations.
PDF
PDF, Low prioritypolicy
LowAI Summary for City of Cleveland Professional Services Contracts Reimbursables Policy 2014: This document outlines the City of Cleveland's Reimbursables Policy for Professional Services Contracts effective January 1, 2014. It defines reimbursable expenditures versus direct labor, details labor multipliers including fringe benefits and overhead, and specifies the requirements for submitting reimbursables lists and invoices. The policy sets qualifications for reimbursables, including cost thresholds and project dedication percentages, and clarifies treatment of office expenses and equipment costs. The document serves as guidance for consultants on allowable reimbursable costs and invoicing procedures under city contracts.
PDF
PDF, Low prioritycontract-document
LowAI Summary for City of Cleveland - Project Labor Agreement (PLA): A Project Labor Agreement (PLA) between the City of Cleveland and the Cleveland Building and Construction Trades Council (CBCTC). The document establishes the framework for labor-management relations, defines 'On-Site Construction Work', and mandates that employers on projects valued at $500,000 or more comply with the agreement's terms to ensure stability and timely project completion.
PDF
PDF, Low prioritypolicy-procedure
LowAI Summary for City of Cleveland Subcontractor Addition and Substitution Policy: This document outlines the City of Cleveland's policy and procedure for adding or substituting subcontractors under City contracts. It requires prior written approval from the Board of Control for any subcontractor addition or substitution, including certified subcontractors such as CSB, MBE, or FBE. The policy mandates submission of supporting documentation at least three weeks in advance, except in emergencies, and details the roles of the contracting department Director, Project Manager, and Office of Equal Opportunity in the approval process. It also covers substitution requirements for certified subcontractors, monitoring and enforcement responsibilities, and penalties for non-compliance. The document aims to ensure compliance with City ordinances and proper oversight of subcontractor utilization.
PDF
PDF, Low prioritypolicy-document
LowAI Summary for City of Cleveland Sustainable Municipal Building Policy April 2013: This document is the City of Cleveland's Sustainable Municipal Building Policy dated April 2013. It outlines the city's commitment to incorporating green building practices in all municipal facilities to achieve energy, water, and waste savings, improve occupant experience, and reduce environmental impact. The policy includes background on the city's participation in sustainability initiatives like the Cleveland 2030 District and the Better Buildings Challenge, with specific energy and water reduction goals through 2030. It also details the business case for sustainable buildings, citing cost premiums and long-term savings, and sets policy requirements for new construction and major renovations to meet LEED Silver certification or higher, including waste recycling and water use reduction measures.
PDF
PDF, Low prioritywage-determination
LowAI Summary for Prevailing Wage Rates Cover Letter for Cuyahoga County, Ohio: This document is a cover letter referencing the prevailing wage rates applicable to contracts in Cuyahoga County, Ohio. It directs contractors to the Ohio Department of Commerce website for the most current wage rates and emphasizes the contractor's responsibility to maintain records and comply with prevailing wage requirements throughout the contract duration.
PDF
PDF, Low priorityfacility-condition-assessment
LowAI Summary for Public Auditorium Operations and Facility Condition Assessment: This document is a comprehensive operations and facility condition assessment of the Public Auditorium in Cleveland, prepared by Osborne Engineering and ASM Global in 2022. It evaluates major systems including electrical, mechanical, roofing, and life safety, as well as operational aspects like marketing, sales, and user experience. The report identifies critical repair priorities, operational challenges, and recommends capital investments and strategic improvements to enhance venue viability. The electrical system condition ranges from very good to obsolete, with about 40% considered obsolete. The assessment aims to guide short- and long-term maintenance and operational strategies for the facility.
PDF
PDF, Low prioritycertified-payroll-report
LowAI Summary for State of Ohio Certified Payroll Report: This document is a Certified Payroll Report for the State of Ohio. It includes tabular data fields such as the name of the general or prime contractor, contractor, project name, contracting public authority, and contracting authority. The report tracks hours worked by day and date, project gross total hours, fringes, and total hours for all jobs. The document appears to be a standard payroll reporting form used for compliance and record-keeping purposes. The content provided is limited and includes a blank page notice.
Introduction The City of Cleveland (City “Client” “Owner”) is seeking qualified Design-Build Team Partners (Contractor “Design-Builder” “D-B” “D-B Team” Consultant) to provide professional Architecture, Engineering, and Construction services for the Public Auditorium Electrical Life Safety Improvements. This project is a Progressive Design Build and will be managed by the Mayor’s Office of Capital Projects (MOCAP), through the Division of Architecture and Site Development (DASD). MOCAP oversees the administration of the City’s Capital Improvement Plan (CIP) for all City-owned facilities, outdoor spaces, and infrastructure, working through its three divisions: the Division of Architecture & Site Development, the Division of Engineering & Construction, and the Division of Real Estate. The mission statement for MOCAP is:To provide for the planning, designing, construction, and preservation of the City of Cleveland's facilities and infrastructure through collaborative and comprehensive planning, leadership in management, excellence in sustainable design and technical expertise, and quality construction based on integrity and professionalism.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award