Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Purchase Design, Equipment and, Install of Outdoor Playground - Misawa Air Base, Japan

Closed
FA520526Q0034Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Cartwright AML Project; 408.26.10.006
Solicitation # SRC000464
The State of North Dakota, through the North Dakota Public Service Commission's Abandoned Mine Lands Division, is soliciting proposals under solicitation SRC000464 for professional engineering and construction services to permanently close and stabilize an abandoned underground coal mine portal near Cartwright, North Dakota. The scope of work encompasses a full project lifecycle, including site investigations of geological and hydrological conditions, the development of engineering designs and technical specifications, execution of excavation and sealing activities, and final site reclamation through grading and revegetation. The contract includes a two-year post-construction warranty and maintenance period. The overall period of performance is expected to run from approximately December 1, 2026, through December 31, 2029, with a specific construction window scheduled between June 1 and August 31, 2027. Award decisions will be based on a 100-point scale, with technical proposals weighted at 80 points and cost proposals at 20 points; technical submissions must score at least 40 points to be considered responsive. Successful offerors must provide performance and payment bonds equal to 100 percent of the contract amount and provide proof of insurance satisfactory to the North Dakota Risk Management Division. Compliance with the Davis-Bacon Act for wage determinations and Buy America preferences for incorporated materials is mandatory. Proposals must be submitted via NDBuys as separate technical and cost documents by the November 17, 2026, deadline.

POSTED

about 16 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The 35th Contracting Squadron at Misawa Air Base is soliciting quotes for a two-phased project involving the design, procurement, delivery, and installation of two modern, safe, and ADA-accessible outdoor playgrounds. The project covers two specific locations: the 75051 Main Base Airplane Park and the 75084 North Base area (Buildings B1825 and B1826). The contractor is responsible for providing all personnel, equipment, and supervision necessary to complete the installation according to the Statement of Objectives, which includes a requirement for intended age group signage. The government will provide the initial site preparation, while the contractor must ensure all equipment meets Japanese regulations and manufacturer guidelines. Award will be determined on a subjective trade-off basis, where technical capability is weighted approximately equal to price. Evaluation sub-factors include the comprehensiveness of the design, the detailed approach to installation in the Statement of Work, and the ability to attend required site visits. Key administrative requirements include the use of the Wide Area WorkFlow system for invoicing and adherence to DoD item unique identification and marking standards. Personnel performing work in Japan must comply with specific insurance, vehicle, and travel authorization requirements, including processing through the SPOT-ES system. Proposals are due by September 21, 2026, and must be submitted electronically.

General Info

Design and install two ADA-accessible playgrounds at Misawa Air Base by September 2026.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Misawa, AP, 96319, JPN

Set-Aside

NONE

Documents

18

FA520526Q0034 Amendment 0001

PDF, High priority: read this firstamendment
High

FA520526Q0034 Amendment 0002

PDF, High priority: read this firstamendment
High

FA520526Q0034 Amendment 0003

PDF, High priority: read this firstamendment
High

FA520526Q0034 Questions and Answers

PDF, High priority: read this firstq-and-a
High

Solicitation FA520526Q0034 for MFH Outdoor Playground

PDF, High priority: read this firstrfq
High

SOO Amendment 02 - Misawa MFH Playgrounds

PDF, High priority: read this first5 pages · amendment
High

Statement of Objectives - Misawa MFH Playgrounds

PDF, High priority: read this firstsow
High

75051 Main Base Air Plane Park Equipment List

PDF, Low priority4 pages · specifications
Low

75051 Playground Reference Map

PDF, Low priority1 page · other
Low

75084 North Base B1825/B1826 Utilities Map

PDF, Low priority1 page · specifications
Low

75084 North Base Playground Reference Map

PDF, Low priorityother
Low

Attachment 3 - 75084 North Base Equipment List

PDF, Low priority1 page · specifications
Low

FA520526Q0034 MFH Outdoor Playground Site Visit Sign-in Sheet

PDF, Low priorityother
Low

Misawa Air Base Utilities Map - North Base B1825/B1826

PDF, Low priorityother
Low

Missoula Base Utilities Playground 75051 Map

PDF, Low priorityother
Low

Playground 75051 Main Base Airplane Park Layout

PDF, Low priorityother
Low

Playground 75084 Reference Map - Misawa Air Base

PDF, Low priorityother
Low

Playground 75084 Reference Map - Misawa North Base

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Sep 21, 2026 to Sep 22, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5205 35 Cons Pk
Contacts2 people available
OfficeAPO, AP, 96319-5201, USA
Office AddressAPO, AP, 96319-5201, USA

Full Description

Show more

NOTICE TO GOVERNMENT SALES REPRESENTATIVES:


The purpose of Amendment 03 is to:


1. Provide responses to questions recevied (Attachment 17).


2. All other terms and conditions remain unchanged and in effect.



Refer to attachment 18 for full amendment details.


______________________________________________________________________ 


NOTICE TO GOVERNMENT SALES REPRESENTATIVES:


The purpose of this amendment is to:


1. Provide site visit attendees from 31 August 2026


2.  Add updated 75051 Main Base - Airplane Park Layout (Attachment 15) to reflect correct location for playground equipment placement.


3. Update section 3.2 of the Statement of Objectives (SOO) to add requirement for intended age group signs at playgrounds.


4. All other terms and conditions remain unchanged and in effect.


Please note, dimensions shown on 75084 North Base - B1825 & B1826 reference map (attachment 4) do not show correct dimensions for playground area, please use measurements taken at site visit.


Refer to attachment 16 for full amendment details.


______________________________________________________________________


NOTICE TO GOVERNMENT SALES REPRESENTATIVES:


The purpose of this amendment is to update Playground Reference Maps, add Utility Map for both locations, to provide site visit information, and clarify amendments to RFO 52.212-1 and RFO 52.212-2.


1. Made correction to Attachment 4, 5, and 6 Park Reference Map Playground to reflect the correct location.


2. Add Attachment 7 -75051 Main Base - Air Plane Park Utilities List 2. The site visit is scheduled for 31 August 2026 at 13:00.


3. Change the questions due date from 0800 JST 05 September 2026 to 0800 JST 09 September 2026.


4. Sub-Factor I: Comprehensive design for both playground locations that meets all requirements of this solicitation and SOO, rating table now describes an unacceptable rating as "Proposal does not meet requirements of the solicitation and thus, contains one or more deficiencies."


5. Remove "all sub-factors shall be evaluated on an acceptable/unacceptable basis based on the requirements listed in the SOO and Solicitation" from Amendment to RFO 52.212-1, 2(a) a. Design will be rated on a subjective trade-off basis.


6. All other terms and conditions remain unchanged and in effect.


Please review Attachment 12 for full amendment details.


________________________________________________________________________


The 35th Contracting Squadron at Misawa Air Base is seeking qualified vendors capable of providing the design, equipment, and installation of outdoor playgrounds. The contractor shall provide all personnel, equipment, tools, supervision, and other items and services necessary to ensure the install of the outdoor playground is perfromed in accordance with attachment 1 - Statement of Objectives (SOO)


Award will be made on a subjective Trade Off basis to the offereor that provides the best value to the USG, in accordance with the Revolutionary Far Overhaul (RFO) Part 12 and 15 in which competing offerors' Technical Capability will be evaluated on basis approximately equal to price. By submission of its offer, the offeror accedes to all solicitation requirements, including terms and conditions, and representations and certifications, in addition to those identified as evaluation factors or subfactors. Failure to meet a solicitation requirement may result in an offer being determined unacceptable. The government reserves the right to award a contract to other than the lowest Total Evaluated Price (TEP). In that event the Contracting Officer will make an integrated assessment best value award decision using the TEP and the Technical Capability rating.


Sub-Factor I: Comprehensive design for both playground locations that meets all requirements of this solicitation and SOO


Sub-Factor II: Statement of Work conforming to the requirements of the Statement of Objectives, providing the contractor's detailed approach to the installation of this requirement.


Sub-Factor 3: Ability to have at least one (1) member of the offerors team present at all meetings and/or site-visits.
a. Site visit date is TBD. Amendment to SAM.gov posting will be made with site visit date and time.
b. If you require an escorted base pass, please make that request via email to the POCs below no later than 5 days prior to the site visit date.


Please reference Attachment 7 - Solicitation - FA520526Q0034, for full evaluation criteria.


QUESTIONS
All questions are due to the POC below by no later than 0800 JST 05 September 2026 (1900 EST on 06 September 2026) via email. All questions must be submitted in an excel sheet capturing the relevant areas (document, page # & paragraph) the question is in regard to, the question, and any clarification requested. The USG will collect, combine and respond to all questions via amendment to SAM.gov posting.
POCs:
Shanna.price.2@us.af.mil
Kade.forrester.1@us.af.mil

More opportunities from Department Of Defense → FA5205 35 Cons Pk

Same awarding agency

NAICS: 336390
Federal
Oral Solicitation Notice_Purchase and Delivery of 18D00715 Vehicle Parts
Solicitation # FA520526QB077
The U.S. Department of Defense, through the 35th Contracting Squadron at Misawa Air Base in Japan, is preparing to award a firm fixed price contract below the Simplified Acquisition Threshold for the purchase and delivery of vehicle parts designated as 18D00715 to support seasonal maintenance of mission-critical snow removal equipment. This pre-solicitation notice, identified by solicitation number FA520526QB077 and NAICS code 336390, is issued under RFO 12.201-1(c)(2) and serves as an informational notice only—no responses or quotes are required at this stage. The procurement is driven by the operational necessity to ensure full readiness of the snow removal fleet prior to the winter season, with all parts required to be delivered no later than 45 calendar days after contract award to meet the annual maintenance window from April through October as mandated by 35 LRSI-OP 24-2. Delivery and acceptance will occur at Building 1310, Unit 5014, Misawa Air Base, Japan, with inspection and acceptance responsibilities falling to designated government personnel, primarily TSgt Finley and MSgt Oberschlake. The contract will be executed under a firm fixed price structure, reflecting the low-risk, straightforward nature of the acquisition, and has been preceded by informal vendor quotes confirming affordability. There are no specified packaging, marking, barcoding, or MIL-STD requirements outlined, nor are there any listed evaluation factors, payment office details, accounting lines, invoicing methods, or special contract clauses such as security clearances, options, or OCI provisions. All performance obligations are tied directly to the seasonal maintenance cycle and the timely availability of parts to sustain uninterrupted airfield operations during heavy snowfall periods.
Other Motor Vehicle Parts Manufacturing

POSTED

5 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS