Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Texas was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PW Northside Drive HROM City Project No. 106170

Closed
26-0242State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetment repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a 10 percent price evaluation preference. Bidders must submit sealed physical bids by September 30, 2026, as electronic submissions are not permitted. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract stipulates liquidated damages of 2,297 dollars per calendar day of delay and requires a third-party qualified surveyor for pre- and post-dredge multi-beam hydrographic surveys to verify final quantities.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 18 days
NAICS: 237990
New
Federal
Station Umpqua River Floating Dock Repair
Solicitation # 70Z03326QSEAT0015
The Department of Homeland Security, through the U.S. Coast Guard Base Seattle, is soliciting bids for a firm-fixed-price contract to repair the floating pier at Station Umpqua River in Winchester Bay, Oregon. The project involves providing all personnel, equipment, and tools to remove deteriorated wooden whalers and hardware and install three layers of 4 by 12 inch wooden whalers, through rods, roller hoops, and an egress ladder, while reinstalling ten existing cleats. The estimated period of performance is from September 21, 2026, to October 22, 2026, with a required completion date of October 14, 2026. This is a total small business set-aside under NAICS code 237990. A mandatory site visit is scheduled for August 27, 2026, at 10:00 AM, and interested offerors must submit their attendee lists by August 26, 2026. Proposals are due by September 14, 2026, at 3:00 PM PST and must be submitted via email to the contracting officer. Submissions are limited to six pages and must include a completed SF 1442, a detailed price breakdown covering mobilization, materials, and labor, and a technical proposal detailing the approach and project schedule. Evaluation will be based on technical capability, past performance, and price, with technical capability being the most significant factor. Awardees must be registered in the System for Award Management and comply with Davis-Bacon Act wage determinations for Douglas County, Oregon.
Base SEATTLE(00033)

POSTED

about 24 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The City of Fort Worth is undertaking a storm drain improvement project along Northside Drive between Cold Springs Road and Mercado Drive in Tarrant County, Texas, to address severe erosion issues caused by a deteriorating 24-inch reinforced concrete pipe (RCP) outfall that drains into a tributary of the West Fork Trinity River. The project involves replacing the existing 24-inch RCP with a new 48-inch RCP measuring 338 linear feet, installing new 42-inch and 24-inch RCP laterals, and reconstructing the outfall structure with riprap to prevent further upstream erosion. Additional work includes removing and replacing 727 square yards of existing concrete paving with 11-inch thick concrete, removing and replacing a 34-square-yard concrete median, installing two new 20-foot curb inlets and one 5-foot by 5-foot area inlet in place of the existing inlets, placing 58 square yards of medium 12-inch grouted riprap, installing two storm junction boxes, and deploying a precast safety end treatment. The project also requires the removal of 25 trees and the protection of 30 others, along with 1,703 cubic yards of excavation and 340 cubic yards of fill material. All work must comply with the City of Fort Worth Standard Construction Specifications, including divisions covering concrete, electrical, metal structures, and precast units, with specific marking requirements for precast components and pipe to ensure traceability and compliance, including designation codes like "TX" and "SR" and manufacturer stamps. The contract is issued under solicitation number 26-0242 with a bid deadline of July 16, 2026, and is structured as a unit-price bid submitted electronically through the City’s Bonfire portal. The lowest responsible and responsive bidder will be selected based on demonstrated financial ability, qualifications, and responsibility, with no set-aside specified. The contractor must provide performance, payment, and maintenance bonds equal to the contract price, issued by Texas-licensed sureties listed in U.S. Treasury Circular 570, with maintenance bonds active for two years after final acceptance. Insurance policies must include a waiver of subrogation in favor of the City. Prevailing wage rates apply, and all labor must comply with Title VI of the Civil Rights Act. The contractor is required to submit submittals including shop drawings, product data, and samples, and must adhere

General Info

Fort Worth to replace 24-inch pipe with 48-inch RCP, repair erosion, install drainage structures.

Agency

Texas → City Of Fort WorthView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

(4)

Bid Proposal Workbook 106170 - City of Fort Worth

XLSXbid-form

Northside Drive HROM CPN 106170 Project Manual

PDFcontract-document

106170 Northside Dr Final Plans - Stormwater Improvements

PDFcontract-document

Submission Instructions for Suppliers - 26-0242

DOCXsubmission-instructions

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeTX, USA
Organization / Agency
Texas → City Of Fort Worth
View Agency Profile
Office AddressTX, USA
ContactsNo contact information available

Interested Companies (3)

Show more
Fort Worth Civil Constructors
No data available in table
HQS Construction
Plano, TX

Full Description

Show more
The major work will consist of the (approximate) following: The City of Fort Worth proposes to improve an existing storm drain system associated with Northside Dr between Cold Springs Rd and Mercado Dr in Fort Worth, Tarrant County, Texas. A pair of curb inlets from the roadway and a drop inlet from the Mercado Juarez restaurant parking lot drain to a 24-in Reinforced Concrete Pipe (RCP) which crosses beneath Northside Dr. The RCP outfall is approximately 150 ft south of Northside Dr and has created a severely incised ditch, which drains into a tributary of the West Fork Trinity River. Erosion from the ditch is migrating up-gradient and is undermining the existing outfall pipe. The proposed project would involve the installation of a 48-in diameter RCP to replace the existing 24-in diameter RCP, reestablishment of the outfall structure along the ditch, and the placement of riprap south of the outfall to prevent future erosion. The quantities and descriptions of the major items of work consists of the following: 1. Remove existing 727 SY concrete paving and replace with 11" concrete paving 2. Remove existing 316 LF, 24" RCP crossing and replace with 338 LF, 48" RCP crossing 3. Install 56 LF, 42" RCP Lateral and 98 LF, 24" RCP Lateral of various classes 4. Remove and replace various pavement markings and raised markers 5. Remove and replace concrete median 34 SY 6. Install medium 12" stone riprap, grouted 58 SY 7. Remove and replace the existing 2-10' curb inlet and 1-4' drop inlet with 2-20' curb inlet and 1-5'x5' area inlet 8. Install 5' and 6' storm junction box 9. Install precast safety end treatment 10. 25 trees to be removed and 30 trees to be protected 11. 1703 CY of excavation and 340 CY of fill material 12. SW3P < 1 acre

More opportunities from Texas → City Of Fort Worth

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS