R--LEAD YARD SERVICES FOR SHIP DETAIL DESIGN, LONG LEAD TIME MATERIAL MANUFACTURING AND INSTALLATION PLANNING SUPPORT
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Naval Sea Systems Command plans to issue a sole source solicitation to Electric Boat Corporation (EBC) for additional lead yard services related to detailed ship design, installation planning support, and the procurement and manufacture of long lead time materials. These efforts are aimed at converting up to four Ohio Class Nuclear Powered Submarines (SSBN) into Ohio Class Guided Missile Nuclear Powered Submarines (SSGN). Given EBC's unique position as the sole designer, developer, and builder of the Ohio Class submarines, they possess the essential expertise and technical knowledge required to manage, execute, and integrate this complex conversion within the required schedule. EBC will act as the conversion manager for the SSGN project and will conduct this work under the framework of an existing contract (N00024-02-C-2901). While this notification is for informational purposes only and solicitation documents are not currently available, parties interested in possible subcontracting opportunities are advised to contact Electric Boat Corporation directly. The contract aims to ensure that the conversion process proceeds efficiently by leveraging EBC’s specialized capabilities and experience.
General Info
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
