Rancho Ponderosa Lift Station Electrical Improvements Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The El Dorado Irrigation District plans to install a new power pole adjacent to the existing one at the Rancho Poderosa Lift Station to ensure uninterrupted electrical service, with PG&E using the new pole to connect a service line to the main disconnect. The existing pole and disconnect box will remain in place, with the old disconnect repurposed as a distribution box. Installation will occur within the existing public utility easement using a skid steer with an auger attachment to drill approximately 10 feet from the facility, avoiding any trenching or significant ground disturbance. No vegetation removal or traffic control measures are needed. District staff will complete the installation of the new pole and run above-ground conduit to connect to the existing disconnect box. The project will utilize a skid steer, crew trucks, hand tools, and small power tools, and is scheduled to begin in June 2026, lasting approximately two weeks during standard weekday hours from 7:30 AM to 5:00 PM.
General Info
Agency
NAICS
Place of Performance
Green Valley Road and Pinon Road, CA, 95672Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
